Retender radar: UK public contracts ending soon

Every contract in the catalogue with a published end date in the future, one row per contract (lot). A contract ending is a procurement starting, unless the buyer uses a published extension option, which the row shows. Frameworks and DPS are marked: what ends there is the vehicle, not one supplier’s contract.

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

A likely retender, not a certain one.

252 contracts end within 24 months, 424 in total · £2.8bn published GBP value, exc. VAT, in the all future end dates (framework ceilings included, not a spend forecast).

  1. Next 3 months26
  2. 3–6 months71
  3. 6–12 months48
  4. 12–24 months107

By sector, all future end dates
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

A likely retender, not a certain one.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each.

Contracts ending in the all future end dates

Showing 931–945

  1. Ends · in 489 daysExtension option · up to 16 Feb 2028

    Lot 2: Provision of Equipment

    Central Bedfordshire Council · Local authority · East of England

    Incumbent: Careium UK Limited

    • Alarm systems
    • Alarm-monitoring services
    • Call centre
    Contract value
    £140k
    Annual run-rate
    £82kvalue ÷ published term
    Term
    2 Jun 2026 → 15 Feb 2028 · 1.7 yrs · up to 16 Feb 2028 with extensions
    Reference
    ocds-h6vhtk-059f38
  2. Ends · in 494 daysFramework re-letExtension option · up to 20 Feb 2030Panel · 2 suppliers

    Framework for Coastal Defence Repairs

    Borough Council of Kings Lynn and West Norfolk · Local authority · East of England

    Panel: Southbay Civil Engineering Ltd, TopBond PLC

    • Coastal-defence works
    Contract value
    £480kceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    21 Feb 2026 → 20 Feb 2028 · 1.9 yrs · up to 20 Feb 2030 with extensions
    Reference
    ocds-h6vhtk-051ab2
  3. Ends · in 495 daysExtension option · up to 12 Dec 2030Panel · 2 suppliers

    Fire equipment servicing

    LiveWest Homes Limited · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Panel: BWS Security Systems Limited , Openview Security Solutions Limited

    • Building installation work
    • Installation services (except software)
    Contract value
    £50kinc. VAT as published
    Annual run-rate
    —panel, not one supplier
    Term
    22 Feb 2026 → 21 Feb 2028 · 1.9 yrs · up to 12 Dec 2030 with extensions
    Reference
    ocds-h6vhtk-052755
  4. Ends · in 502 daysFramework re-letExtension option · up to 28 Feb 2030Panel · 3 suppliers

    Highways Minor Works Framework

    Blackburn With Darwen Borough Council · Local authority · Nationwide (UK), North West England

    Panel: A J Bretherton Groundworks & Plant, Bethell Construction Ltd, Multevo ltd

    • Highway maintenance work
    Contract value
    £4.0mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    1 Mar 2026 → 28 Feb 2028 · 1.9 yrs · up to 28 Feb 2030 with extensions
    Reference
    ocds-h6vhtk-05d673
  5. Ends · in 502 days

    COV - Stoke Park School - Main Works

    Coventry City Council · Local authority · West Midlands

    Incumbent: Borras Construction Ltd

    • Construction work
    Contract value
    £3.9m
    Annual run-rate
    £2.0mvalue ÷ published term
    Term
    7 Apr 2026 → 28 Feb 2028 · 1.8 yrs
    Reference
    ocds-h6vhtk-05960c
  6. Ends · in 502 daysFramework re-letExtension option · up to 28 Feb 2030Panel · 3 suppliers

    Framework for Scaffolding: Lot 1 Highway Services

    Durham County Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Panel: Ingleford Scaffolding Limited, KAEFER LIMITED, TIS (NGA) Ltd

    • Construction work
    Contract value
    £2.0mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    1 Mar 2026 → 28 Feb 2028 · 1.9 yrs · up to 28 Feb 2030 with extensions
    Reference
    ocds-h6vhtk-05e763
  7. Ends · in 502 daysFramework re-letExtension option · up to 28 Feb 2030Panel · 3 suppliers

    Framework for Scaffolding: Lot 2 Construction Services

    Durham County Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Panel: Ingleford Scaffolding Limited, KAEFER LIMITED, TIS (NGA) Ltd

    • Construction work
    Contract value
    £2.0mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    1 Mar 2026 → 28 Feb 2028 · 1.9 yrs · up to 28 Feb 2030 with extensions
    Reference
    ocds-h6vhtk-05e763
  8. Ends · in 502 daysFramework re-letExtension option · up to 28 Feb 2030

    Asbestos Removal and Encapsulation Services

    Staffordshire County Council · Local authority · West Midlands

    Incumbent: Econ Group Ltd

    • Asbestos-removal work
    Contract value
    £1.5mceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    3 Mar 2026 → 28 Feb 2028 · 1.9 yrs · up to 28 Feb 2030 with extensions
    Reference
    ocds-h6vhtk-051236
  9. Ends · in 502 daysFramework re-letExtension option · up to 28 Feb 2030Panel · 2 suppliers

    Asbestos Removal and Encapsulation Services

    Staffordshire County Council · Local authority · West Midlands

    Panel: Rhodar Industrial Services Limited, TMS ENVIRONMENTAL LTD

    • Asbestos-removal work
    Contract value
    £1.5mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    1 Mar 2026 → 28 Feb 2028 · 1.9 yrs · up to 28 Feb 2030 with extensions
    Reference
    ocds-h6vhtk-051236
  10. Ends · in 502 daysFramework re-letExtension option · up to 28 Feb 2030Panel · 2 suppliers

    Asbestos Removal and Encapsulation Services

    Staffordshire County Council · Local authority · West Midlands

    Panel: AIB Solutions Ltd, TMS ENVIRONMENTAL LTD

    • Asbestos-removal work
    Contract value
    £1.5mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    1 Mar 2026 → 28 Feb 2028 · 1.9 yrs · up to 28 Feb 2030 with extensions
    Reference
    ocds-h6vhtk-051236
  11. Ends · in 502 daysExtension option · up to 28 Feb 2031

    Drainage services

    HOMES IN SOMERSET LIMITED · South West England

    Incumbent: AQUABLAST DRAIN SERVICES LIMITED

    • Drainage works
    • Repair and maintenance services of building installations
    Contract value
    £200k
    Annual run-rate
    £100kvalue ÷ published term
    Term
    1 Mar 2026 → 28 Feb 2028 · 1.9 yrs · up to 28 Feb 2031 with extensions
    Reference
    ocds-h6vhtk-05d13f
  12. Ends · in 503 daysFramework re-letPanel · 21 suppliers

    Refurbishment and Modernisation Framework Agreement

    LHC for the Scottish Procurement Alliance (SPA) · Scotland

    Panel: BELL GROUP LTD, CCG (Scotland) Ltd, CHAP Group (Aberdeen) Ltd +18 more

    • Bathrooms construction work
    • Bricklaying work
    • Building installation work
    Contract value
    £150mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    1 Mar 2024 → 29 Feb 2028 · 3.9 yrs
    Reference
    ocds-h6vhtk-03a449
  13. Ends · in 503 daysFramework re-letPanel · 5 suppliers

    Lot 1 Kitchens & Bathrooms with Associated Works - Project Value Band 1 0 - 500k GBP

    LHC for the Scottish Procurement Alliance (SPA) · Scotland

    Panel: Compass Building and Construction Services Limited, Everwarm Ltd, Hugh LS McConnell +2 more

    • Bathrooms construction work
    • Bricklaying work
    • Building installation work
    Contract value
    £100mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 29 Feb 2028 · start not published
    Reference
    ocds-h6vhtk-03a449
  14. Ends · in 503 days

    Repository Development (RD) Southern Trench Cap Interim Membrane Replacement (STIM) Project

    Nuclear Waste Services Limited · North West England

    Incumbent: John Graham Construction Ltd

    • Architectural, construction, engineering and inspection services
    • Construction work
    • Construction work for engineering works except bridges, tunnels, shafts and subways
    Contract value
    £67m
    Annual run-rate
    —start date not published
    Term
    Ends 29 Feb 2028 · start not published
    Reference
    ocds-h6vhtk-03979d
  15. Ends · in 503 daysExtension option · up to 28 Feb 2030Buyer plans to re-tender 2 May 2029

    NYC Provision of Replacement Windows and Doors

    The North Yorkshire Council · Local authority · Yorkshire and the Humber

    Incumbent: Kingfisher UPVC Windows & Doors Ltd

    • Installation of doors
    • Installation of doors and windows and related components
    • Installation of windows
    Contract value
    £8.2m
    Annual run-rate
    £4.1mvalue ÷ published term
    Term
    1 Mar 2026 → 29 Feb 2028 · 1.9 yrs · up to 28 Feb 2030 with extensions
    Reference
    ocds-h6vhtk-0588f4
How to read the radar
  • End date is the contract period end the buyer published on the notice. Contracts without an end date are not on the radar.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend instead of retendering. Hide them to see contracts that must be re-procured.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term, only for a single supplier, a term of six months or more and a plain contract (not a framework or DPS ceiling).
  • Counts are exact for the time-horizon and sector filters. With other filters, a result above 1,000 contracts shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.