Retender radar: UK public contracts ending soon
Every contract on Find a Tender with a published end date in the future, one row per contract (lot). A contract ending is a procurement starting — unless the buyer uses a published extension option, which the row shows. Frameworks and DPS are marked: what ends there is the vehicle, not one supplier’s contract.
When contracts end · Architectural, construction, engineering i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
188 contracts end within 24 months, 307 in total · £869m published GBP value, exc. VAT, in the all future end dates (framework ceilings included, not a spend forecast).
By sector, all future end dates i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
CPV division of the procedure; a contract with several divisions counts in each.
90Sewage, refuse, cleaning and environmental3,04285Health and social work services2,82160Transport services (except waste transport)1,28933Medical equipments, pharmaceuticals1,00679Business services: law, marketing, consulting87380Education and training services74345Construction work42450Repair and maintenance services424
Contracts ending in the all future end dates
Showing 271–285
- Ends · in 260 days
CWC22173 - Provision of Lone Worker System
Wolverhampton City Council · Local authority · West Midlands
Incumbent: Skyguard Limited T/A PeopleSafe
- Contract value
- Not published
- Annual run-rate
- —value not published
- Term
- Ends 30 Jun 2027 · start not published
- Reference
ocds-h6vhtk-03ae0b
- Ends · in 262 days
Repair/replacement Footbridge, Mitton, Tewkesbury
Tewkesbury Borough Council · Local authority
Incumbent: Beaver Bridges Ltd
- Contract value
- £377k
- Annual run-rate
- £497kvalue ÷ published term
- Term
- 29 Sept 2026 → 2 Jul 2027 · 9 months
- Reference
ocds-h6vhtk-0678fe
- Ends · in 262 daysFramework re-let
24-071 Closed Landfill Maintenance
Rotherham Metropolitan Borough Council · Local authority · Yorkshire and the Humber
Incumbent: Waste Management Maintenance Ltd
- Contract value
- £232kceiling for the whole framework
- Annual run-rate
- —ceiling, not a run-rate
- Term
- Ends 2 Jul 2027 · start not published
- Reference
ocds-h6vhtk-04e672
- Ends · in 265 days
Technical Assessment Services
SALIX FINANCE LTD · Central government · Nationwide (UK)
Incumbent: Ricardo AEA Ltd
- Contract value
- £88k
- Annual run-rate
- £59kvalue ÷ published term
- Term
- 5 Jan 2026 → 5 Jul 2027 · 1.5 yrs
- Reference
ocds-h6vhtk-05ce1a
- Ends · in 265 days
Technical Assessment Services
SALIX FINANCE LTD · Central government · Nationwide (UK)
Incumbent: AtkinsRéalis UK Ltd
- Contract value
- £88k
- Annual run-rate
- £59kvalue ÷ published term
- Term
- 5 Jan 2026 → 5 Jul 2027 · 1.5 yrs
- Reference
ocds-h6vhtk-05ce1a
- Ends · in 265 daysExtension option · up to 30 Dec 2027
Public Rights of Way (PROW) Network Surveying Contractor Service
Carmarthenshire County Council · Local authority · Wales (Cymru)
Incumbent: Geo Smart Decisions Ltd
- Contract value
- £38k
- Annual run-rate
- £38kvalue ÷ published term
- Term
- 6 Jul 2026 → 5 Jul 2027 · 11 months · up to 30 Dec 2027 with extensions
- Reference
ocds-h6vhtk-069ce8
- Ends · in 272 daysExtension option · up to 12 Jul 2028
NUNCON - Strategic Flood Risk Assessment
Nuneaton and Bedworth Borough Council · Local authority · West Midlands
Incumbent: Hydraulic Analysis Limited
- Contract value
- £60k
- Annual run-rate
- £60kvalue ÷ published term
- Term
- 13 Jul 2026 → 12 Jul 2027 · 11 months · up to 12 Jul 2028 with extensions
- Reference
ocds-h6vhtk-0655c1
- Ends · in 273 daysExtension option
4855/AMRC/GM/2025 Kiln Modification for Hydrogen / Natural Gas Mix
University of Sheffield · Education · Yorkshire and the Humber
Incumbent: Therser (UK) Ltd
- Contract value
- £400k
- Annual run-rate
- £265kvalue ÷ published term
- Term
- 9 Jan 2026 → 13 Jul 2027 · 1.5 yrs
- Reference
ocds-h6vhtk-05ab86
- Ends · in 280 days
Gallery 33 Refurbishment: Design and Consultancy Services
Natural History Museum · Greater London
Incumbent: Studio Downie Architects LLP
- Contract value
- £223k
- Annual run-rate
- —start date not published
- Term
- Ends 20 Jul 2027 · start not published
- Reference
ocds-h6vhtk-04d69b
- Ends · in 287 days
Aquatic plant survey and condition assessment of the Nene Washes ditch network and of 3 main channels/drains at the Nene and Ouse Washes Protected Sites, Cambridgeshire.
Natural England · Central government · East of England
Incumbent: Adler and Allan Ltd
- Contract value
- £25k
- Annual run-rate
- £21kvalue ÷ published term
- Term
- 25 May 2026 → 27 Jul 2027 · 1.2 yrs
- Reference
ocds-h6vhtk-0684a9
- Ends · in 290 days
Multi-disciplinary design team - Grenfell Memorial
Ministry of Housing, Communities & Local Government · Central government · Greater London
Incumbent: Freehaus Design Limited
- Contract value
- £5.2m
- Annual run-rate
- —start date not published
- Term
- Ends 30 Jul 2027 · start not published
- Reference
ocds-h6vhtk-047c17
- Ends · in 291 daysFramework re-letExtension option · up to 31 Jul 2034Buyer plans to re-tender 1 Nov 2026Panel · 34 suppliers
Lot 2 - Major Works (Voids and Disrepairs)
Wandle Housing Association Limited · Charity · Greater London
Panel: ALL SERVICE 4 U LIMITED, ALP GROUP LIMITED, Arvag Ltd +31 more
- Contract value
- £29mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- 1 Aug 2026 → 31 Jul 2027 · 11 months · up to 31 Jul 2034 with extensions
- Reference
ocds-h6vhtk-05a9c1
- Ends · in 291 days
Provision of Emergency O&M Services - Energy from Waste Facility
Aberdeen City Council · Local authority · Scotland
Incumbent: SUEZ Recycling and Recovery UK Ltd
- Contract value
- £18m
- Annual run-rate
- —start date not published
- Term
- Ends 31 Jul 2027 · start not published
- Reference
ocds-h6vhtk-065b82
- Ends · in 291 daysFramework re-letExtension option · up to 31 Jul 2034Buyer plans to re-tender 1 Nov 2026Panel · 27 suppliers
Lot 3 - Damp and/or Mould Works and Surveys
Wandle Housing Association Limited · Charity · Greater London
Panel: ALL SERVICE 4 U LIMITED, Arvag Ltd, BURTON BUILDING CONTRACTS UK LTD +24 more
- Contract value
- £15mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- 1 Aug 2026 → 31 Jul 2027 · 11 months · up to 31 Jul 2034 with extensions
- Reference
ocds-h6vhtk-05a9c1
- Ends · in 291 daysFramework re-letExtension option · up to 31 Jul 2034Buyer plans to re-tender 1 Nov 2026Panel · 27 suppliers
Lot 1 - Responsive Repairs
Wandle Housing Association Limited · Charity · Greater London
Panel: ALL SERVICE 4 U LIMITED, ALP GROUP LIMITED, Arvag Ltd +24 more
- Contract value
- £14mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- 1 Aug 2026 → 31 Jul 2027 · 11 months · up to 31 Jul 2034 with extensions
- Reference
ocds-h6vhtk-05a9c1
How to read the radar
- End date is the contract period end the buyer published on Find a Tender. Contracts without an end date are not on the radar.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend instead of retendering. Hide them to see contracts that must be re-procured.
- Incumbent is the canonical supplier on the award behind the contract. A panel (several suppliers on one award) is shown as a panel — no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term, only for a single supplier, a term of six months or more and a plain contract (not a framework or DPS ceiling).
- Counts are exact from the nightly projection when you filter by horizon and sector only; any other filter shows a bounded total — exact up to 1,000 contracts, an honest “1,000+” floor above that.