Retender radar: UK public contracts ending soon
Every contract in the catalogue with a published end date in the future, one row per contract (lot). A contract ending is a procurement starting, unless the buyer uses a published extension option, which the row shows. Frameworks and DPS are marked: what ends there is the vehicle, not one supplier’s contract.
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
252 contracts end within 24 months, 424 in total · £1.7bn published GBP value, exc. VAT, in the next 24 months (framework ceilings included, not a spend forecast).
By sector, next 24 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
CPV division of the procedure; a contract with several divisions counts in each.
85Health and social work services1,78560Transport services (except waste transport)1,16433Medical equipments, pharmaceuticals90279Business services: law, marketing, consulting63380Education and training services36790Sewage, refuse, cleaning and environmental28550Repair and maintenance services27545Construction work252
Contracts ending in the next 24 months
Showing 931–945
- Ends · in 489 daysExtension option · up to 16 Feb 2028
Lot 2: Provision of Equipment
Central Bedfordshire Council · Local authority · East of England
Incumbent: Careium UK Limited
- Contract value
- £140k
- Annual run-rate
- £82kvalue ÷ published term
- Term
- 2 Jun 2026 → 15 Feb 2028 · 1.7 yrs · up to 16 Feb 2028 with extensions
- Reference
ocds-h6vhtk-059f38
- Ends · in 494 daysFramework re-letExtension option · up to 20 Feb 2030Panel · 2 suppliers
Framework for Coastal Defence Repairs
Borough Council of Kings Lynn and West Norfolk · Local authority · East of England
Panel: Southbay Civil Engineering Ltd, TopBond PLC
- Contract value
- £480kceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- 21 Feb 2026 → 20 Feb 2028 · 1.9 yrs · up to 20 Feb 2030 with extensions
- Reference
ocds-h6vhtk-051ab2
- Ends · in 495 daysExtension option · up to 12 Dec 2030Panel · 2 suppliers
Fire equipment servicing
LiveWest Homes Limited · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Panel: BWS Security Systems Limited , Openview Security Solutions Limited
- Contract value
- £50kinc. VAT as published
- Annual run-rate
- —panel, not one supplier
- Term
- 22 Feb 2026 → 21 Feb 2028 · 1.9 yrs · up to 12 Dec 2030 with extensions
- Reference
ocds-h6vhtk-052755
- Ends · in 502 daysFramework re-letExtension option · up to 28 Feb 2030Panel · 3 suppliers
Highways Minor Works Framework
Blackburn With Darwen Borough Council · Local authority · Nationwide (UK), North West England
Panel: A J Bretherton Groundworks & Plant, Bethell Construction Ltd, Multevo ltd
- Contract value
- £4.0mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- 1 Mar 2026 → 28 Feb 2028 · 1.9 yrs · up to 28 Feb 2030 with extensions
- Reference
ocds-h6vhtk-05d673
- Ends · in 502 days
COV - Stoke Park School - Main Works
Coventry City Council · Local authority · West Midlands
Incumbent: Borras Construction Ltd
- Contract value
- £3.9m
- Annual run-rate
- £2.0mvalue ÷ published term
- Term
- 7 Apr 2026 → 28 Feb 2028 · 1.8 yrs
- Reference
ocds-h6vhtk-05960c
- Ends · in 502 daysFramework re-letExtension option · up to 28 Feb 2030Panel · 3 suppliers
Framework for Scaffolding: Lot 1 Highway Services
Durham County Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Panel: Ingleford Scaffolding Limited, KAEFER LIMITED, TIS (NGA) Ltd
- Contract value
- £2.0mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- 1 Mar 2026 → 28 Feb 2028 · 1.9 yrs · up to 28 Feb 2030 with extensions
- Reference
ocds-h6vhtk-05e763
- Ends · in 502 daysFramework re-letExtension option · up to 28 Feb 2030Panel · 3 suppliers
Framework for Scaffolding: Lot 2 Construction Services
Durham County Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Panel: Ingleford Scaffolding Limited, KAEFER LIMITED, TIS (NGA) Ltd
- Contract value
- £2.0mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- 1 Mar 2026 → 28 Feb 2028 · 1.9 yrs · up to 28 Feb 2030 with extensions
- Reference
ocds-h6vhtk-05e763
- Ends · in 502 daysFramework re-letExtension option · up to 28 Feb 2030
Asbestos Removal and Encapsulation Services
Staffordshire County Council · Local authority · West Midlands
Incumbent: Econ Group Ltd
- Contract value
- £1.5mceiling for the whole framework
- Annual run-rate
- —ceiling, not a run-rate
- Term
- 3 Mar 2026 → 28 Feb 2028 · 1.9 yrs · up to 28 Feb 2030 with extensions
- Reference
ocds-h6vhtk-051236
- Ends · in 502 daysFramework re-letExtension option · up to 28 Feb 2030Panel · 2 suppliers
Asbestos Removal and Encapsulation Services
Staffordshire County Council · Local authority · West Midlands
Panel: Rhodar Industrial Services Limited, TMS ENVIRONMENTAL LTD
- Contract value
- £1.5mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- 1 Mar 2026 → 28 Feb 2028 · 1.9 yrs · up to 28 Feb 2030 with extensions
- Reference
ocds-h6vhtk-051236
- Ends · in 502 daysFramework re-letExtension option · up to 28 Feb 2030Panel · 2 suppliers
Asbestos Removal and Encapsulation Services
Staffordshire County Council · Local authority · West Midlands
Panel: AIB Solutions Ltd, TMS ENVIRONMENTAL LTD
- Contract value
- £1.5mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- 1 Mar 2026 → 28 Feb 2028 · 1.9 yrs · up to 28 Feb 2030 with extensions
- Reference
ocds-h6vhtk-051236
- Ends · in 502 daysExtension option · up to 28 Feb 2031
Drainage services
HOMES IN SOMERSET LIMITED · South West England
Incumbent: AQUABLAST DRAIN SERVICES LIMITED
- Contract value
- £200k
- Annual run-rate
- £100kvalue ÷ published term
- Term
- 1 Mar 2026 → 28 Feb 2028 · 1.9 yrs · up to 28 Feb 2031 with extensions
- Reference
ocds-h6vhtk-05d13f
- Ends · in 503 daysFramework re-letPanel · 21 suppliers
Refurbishment and Modernisation Framework Agreement
LHC for the Scottish Procurement Alliance (SPA) · Scotland
Panel: BELL GROUP LTD, CCG (Scotland) Ltd, CHAP Group (Aberdeen) Ltd +18 more
- Contract value
- £150mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- 1 Mar 2024 → 29 Feb 2028 · 3.9 yrs
- Reference
ocds-h6vhtk-03a449
- Ends · in 503 daysFramework re-letPanel · 5 suppliers
Lot 1 Kitchens & Bathrooms with Associated Works - Project Value Band 1 0 - 500k GBP
LHC for the Scottish Procurement Alliance (SPA) · Scotland
Panel: Compass Building and Construction Services Limited, Everwarm Ltd, Hugh LS McConnell +2 more
- Contract value
- £100mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 29 Feb 2028 · start not published
- Reference
ocds-h6vhtk-03a449
- Ends · in 503 days
Repository Development (RD) Southern Trench Cap Interim Membrane Replacement (STIM) Project
Nuclear Waste Services Limited · North West England
Incumbent: John Graham Construction Ltd
- Contract value
- £67m
- Annual run-rate
- —start date not published
- Term
- Ends 29 Feb 2028 · start not published
- Reference
ocds-h6vhtk-03979d
- Ends · in 503 daysExtension option · up to 28 Feb 2030Buyer plans to re-tender 2 May 2029
NYC Provision of Replacement Windows and Doors
The North Yorkshire Council · Local authority · Yorkshire and the Humber
Incumbent: Kingfisher UPVC Windows & Doors Ltd
- Contract value
- £8.2m
- Annual run-rate
- £4.1mvalue ÷ published term
- Term
- 1 Mar 2026 → 29 Feb 2028 · 1.9 yrs · up to 28 Feb 2030 with extensions
- Reference
ocds-h6vhtk-0588f4
How to read the radar
- End date is the contract period end the buyer published on the notice. Contracts without an end date are not on the radar.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend instead of retendering. Hide them to see contracts that must be re-procured.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term, only for a single supplier, a term of six months or more and a plain contract (not a framework or DPS ceiling).
- Counts are exact for the time-horizon and sector filters. With other filters, a result above 1,000 contracts shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.