Find a TenderAwarded
Published 31 Jan 2024, 16:48 GMT

Official UK procurement notice

Utility Supply and Energy Management Solutions Framework

Official notice

Authority: University of Essex (Education)·Consortium: 3 public authorities

Framework agreement4 lotsGoodsOpen procedureMax 4 lots to bidMax 4 lots per supplier
Framework ceiling (notional)£400,000,000total for 4 lots · framework ceiling, not attributable revenue
Submissions closed 4 Mar 2024awarded 10 Jun 2024
Lots 4max 4 won per supplier · max 4 to bid

What is being bought4 lots · detail below

Published requirement description

The Contracting Authority wishes to establish a Framework Agreement to meet the Utility Supply and Energy Management Solutions needs of the the University of Essex, www.essex.ac.uk ↗ and it is also open for use by all contracting authorities across the UK public sector (and any future successors to these organisations). These include (but not limited to) central government departments and agencies, Non Departmental Public Bodies, NHS bodies, Local Authorities, Police Authorities, Emergency Services, Educational Establishments, Hospices, Registered Charities, National Parks and Registered Social Landlords. Full details of the classification of eligible end user establishments and geographical areas is available at:

www.dukefieldenergy.co.uk/fts-eligible-users ↗

There will be let across four Lots. There will be a maximum of 6 suppliers awarded a place on each of the Lots 1, 2 and 3 and a maximum of 15 suppliers on Lot 4.

CPV: Air pumps · Battery chargers · Battery packs · Building consultancy services · Building services consultancy services · Central controlling unit · Commissioning of public lighting installations · Consulting services for water-supply and waste consultancy · Electric pumps · Electrical machinery, apparatus, equipment and consumables; lighting · Electrical services · Electricity · +57 more

How this framework works

From the published notice
Places
up to 33 suppliers · 5 bids on the busiest of 4 lots (0.2 per place) · 6 appointed

Lots and requirements (4)Procurement structure

4 lots · all with a published value · a supplier may bid for at most 4 and win at most 4 of them · same evaluation weights on every lot
Lot #1Provision of Electricity SupplyAwardedPublished value£200,000,000

The Lot will provide organisations across the entire public sector with access to electricity supply and additional services including Fixed, Passthrough and Flexible, Metered and UMS electricity supplies - Unmetered, Half Hourly and Non-Half Hourly electricity. The Lot will also provide access to other additional related services.

Delivery: UK · United Kingdom
Extensions: 48 month(s) from the commencement date, with 36 initial month(s) and option to extend 1x12 month(s)Variant bids: not allowed
Lot #2Provision of Natural Gas SupplyAwardedPublished value£100,000,000

This framework Lot will provide organisations across the entire public sector with Natural Gas Supply including Non-Daily Metered and Daily Metered. The Lot will also provide access to a suite of Additional Services.

Delivery: UK · United Kingdom
Extensions: 48 month(s) from the commencement date, with 36 initial month(s) and option to extend 1x12 month(s)Variant bids: not allowed
Lot #3Supply of Metered and Unmetered Water, Metered and Unmetered Wastewater, Trade Effluent Services and Ancillary ServicesAwardedPublished value£40,000,000

Supply of Metered and Unmetered Water, Metered and Unmetered Wastewater, Trade Effluent Services and Ancillary Services

Delivery: UK · United Kingdom
Extensions: 48 month(s) from the commencement date, with 36 initial month(s) and option to extend 1x12 month(s)Variant bids: not allowed
Lot #4Energy Management SolutionsAwardedPublished value£60,000,000

This Lot involves the delivery of a suite of Energy Managements Solutions including but not limited to the following Energy Management Solutions :

  • Energy Management Consultancy Services
  • Alternative Power: Heat Pumps
  • Alternative Power: Solar Photovoltaics
  • Alternative Power: Wind
  • Electric Vehicle Charging
  • Energy Efficiency Solutions

o LED Lighting

o Lighting Sensors

o Zone Control Units

o Voltage Optimisation

o Power Optimisation

o Central Control Units

o Emergency Lighting

Delivery: UK · United Kingdom
Extensions: 48 month(s) from the commencement date, with 36 initial month(s) and option to extend 1x12 month(s)Variant bids: not allowed

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored · same split on all 4 lots
Quality: 30%Price: 70%
Published award criteria (2)
  • Quality: 30.00%
  • Price: 70.00%
What this means for your bid
  • Price carries 70 of 100 points: a 10% discount moves about 7 points. This one is won on the number: sharpen the price before polishing the prose.
  • “Utility Supply and Energy Management Solutions Framework” is a framework: the contest is a place on its panel, up to 33 suppliers, not a single contract.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record · publisher note attached
Procedure method
Open procedure
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Goods
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
No (one-off requirement)
First published
31 Jan 2024, 16:48 GMT
Last source update
10 Jun 2024, 14:12 BST
Award evaluation window
4 Mar 2024 – …
Authority reference
CA13297 - ESSEX/DE/ENERGY/03
FTS notice number
2024/S 000-017863
Classification (CPV)
Air pumpsBattery chargersBattery packsBuilding consultancy servicesBuilding services consultancy servicesCentral controlling unitCommissioning of public lighting installationsConsulting services for water-supply and waste consultancyElectric pumpsElectrical machinery, apparatus, equipment and consumables; lighting
+59 moreElectrical servicesElectricity
Delivery area
UK
Official registry OCID
ocds-h6vhtk-04361f Find a Tender
Contract terms
Electronic trading
e-invoicing allowed · electronic ordering · electronic payment
Review and risk notes
Review procedure

The University of Essex will incorporate a minimum 10-day standstill period at the point information on the award of contract is communicated to tenderers. Bidders who are unsuccessful shall be informed by the Contracting Authority as soon as possible after the decision is made as to the reasons why the bidder was unsuccessful. If an appeal regarding the award of the contract has not been successfully resolved, the Public Procurement Regulations provide for the aggrieved parties who have been harmed or who are at risk of harm by the breach of the rules to take

action in the High Court (England, Wales and Northern Ireland). Any action must be generally brought within 3 months. If a declaration of ineffectiveness is sought, any such action must be brought within 30 days where the Contracting Authority has communicated the award of the contract and a summary of reasons to tenderers, or otherwise within 6 months of the contract being entered into. Where a contract has not been entered into, the Court may order the setting aside of the award decision or order the Contracting Authority to

amend any document and may award damages. If the Contract has been entered into the Court may, depending on the circumstances, award damages, make a declaration of ineffectiveness, order the Contracting Authority to pay a fine, and/or order that the duration of the contract the shortened. The purpose of the standstill period referred to above is to allow the parties to apply to the Courts to set aside the award decision before the contract is

entered into.

Publisher note: The University of Essex's Internal Reference Number is ESSEX/DE/ENERGY/03. The framework is being delivered by the University of Essex and its partners Dukefield Energy Ltd (who are a subsidiary of Dukefield Ltd). Dukefield Energy Ltd are acting as agents of the University of Essex in the development and ongoing contract management of this framework. The contracting authority will be using an eTendering system to conduct the procurement exercise. To access the procurement documentation suppliers must register their company details on the Sourcing Cloud system at: https://suppliers.multiquote.com the tender is available from the opportunities menu on the login page of the site. The contracting authority shall not be under any obligation to accept the lowest tender or indeed any tender. The University of Essex expressly reserves the rights: (a) to terminate the procurement process and not to award any contract as a result of the procurement process at any time; (b) to make whatever changes it may see fit to the content and structure of the procurement as detailed within the tender documentation; (c) to award a contract covering only part of the it's requirements if explicitly detailed within the tender documentation; (d) to disqualify any organisation from the process that canvasses any employee of the Contracting Authority during the procurement process or standstill period if applicable; (e) seek clarifications to tender responses on the basis that any clarification sought will not confer any undue competitive advantage in the favour of any supplier from whom such clarifications are being sought; (f) where the contracting authority can evidence that there is a conflict of interest, either personal or in consideration of any organisation bidding for the contract, the contracting authority shall have the explicit right to immediately exclude that person or organisation from the tender process entirely; (g) where the contracting authority has engaged in any pre-market soft testing prior to the commencement of the procurement process, the contracting authority reserves the right to name any organisation that has been involved in these discussions and release any and all specifications/ discussion documents to the market where appropriate to the subject matter of this procurement; (h) the contracting authority will not be liable for any costs incurred by tenderers; (i) the value of the framework provided in section II.1.5) is only an estimate and the contracting authority will not guarantee any business through this framework agreement; and (j) the contracting authority wishes to establish a framework agreement open for use by all Public Sector Bodies as stated in II.1.4). Tenderers should note, in reference to section IV.1.3), envisaged maximum number of participants to the framework: Where, following the evaluation of bids, more than one tenderer on a Lot is tied with the same final evaluation score and are ranked in the last supplier award position, each of these tenderers shall be deemed to occupy the last framework agreement contract award position for the Lot in question for the purpose of calculating the maximum number of suppliers under the framework. The contracting authority will award a framework agreement to additional tenderers on a particular Lot beyond the stated maximum number for that Lot, where their final evaluation score (s) is within 0.5% of the last placed position only on the particular Lot. For the avoidance of doubt, the last placed position in respect of this framework on each lots 1, 2 and 3 is sixth, and in respect of Lot 4 is fifteenth place. Therefore, tenderers within 0.5%, along with the tenderer in last placed position on a lot, shall be deemed to occupy the last framework agreement contract award position for that particular lot. (k) The figure in respect of Lot 4 section II.2.5 is incorrect and the correct figures should be: Lot 4 Quality 100% Price 0%

How it was run

Official notice
Run through: MultiQuote · Who buys & how to bid on MultiQuote
Supplier login requiredLanguage: EN
Access & registration note: Free
Appointment period ends
4 Mar 2024, 12:00 GMT
Submission channel
{"electronicSubmission","written"}
Accepted languages
en
Bids opened
4 Mar 2024, 12:00 GMT
Detailed submission instructions & authority contactsFrom official release

Timeline

4 Mar 2024 → 10 Jun 2024 · 3 dates
  1. Admission / appointment period endsperiod end, not a bid countdown
    4 Mar 2024, 12:00 GMT
  2. Bids opened
    4 Mar 2024, 12:00 GMT
  3. Notice published
    10 Jun 2024, 14:12 BST

Notice history

1 event · 2 releases on Find a Tender
  1. Status changed to complete
    10 Jun 2024, 14:12 BST

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Suppliers appointed 6admitted to the panel · see the list ↓
Bids received 5busiest of 4 lots
Contracts signed 4latest 10 Jun 2024

4 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.

Contracts

  • Provision of Electricity Supply

    Signed
    10 Jun 2024
    Value
    £200,000,000
    Status
    active
  • Provision of Natural Gas Supply

    Signed
    10 Jun 2024
    Value
    £100,000,000
    Status
    active
  • Supply of Metered and Unmetered Water, Metered and Unmetered Wastewater, Trade Effluent Services and Ancillary Services

    Signed
    10 Jun 2024
    Value
    £40,000,000
    Status
    active
  • Energy Management Solutions

    Signed
    10 Jun 2024
    Value
    £60,000,000
    Status
    active

Bid statistics published by the authority

LotBidsSMEVCSEValid bid range
1 · Provision of Electricity Supply5bids———
2 · Provision of Natural Gas Supply4bids———
3 · Supply of Metered and Unmetered Water, Metered and Unmetered Wastewater, Trade Effluent Services and Ancillary Services3bids———
4 · Energy Management Solutions4bids———

Contracting authority & participating public bodies

3 public bodies on the notice

University of Essex

Contracting authorityEducationBody governed by public lawEducation Wivenhoe Park, Colchester, UK, CO4 3SQContact email, phone Published organisation website ↗

Consortium members and other public bodies

  • Dukefield Energy LimitedContracting authority Bolton, North WestContact email, phone
  • Public SectorContracting authority Colchester, UKContact email, phone

Framework contractors & participating bidders

6 commercial parties on the notice
  • Brook Green Supply LimitedFramework contractor 80 Hammersmith Road, 4th Floor, 4th Floor, London, UK, W14 8UDContact email, phone
  • CORENERGY LIMITEDFramework contractor Parkway Two, Parkway Business Park, MANCHESTER, UK, M14 7LUContact email, phone
  • Centrica Business Solutions UK LimitedFramework contractor Millstream, Maidenhead Road, Windsoe, UK, SL4 5GDContact email, phone
  • Ecotricity Group LtdFramework contractor Lion House, Rowcroft, Stroud, UK, GL53BYContact email, phone
  • SSE Energy Supply LimitedFramework contractor No.1 Forbury Place, 43 Forbury Road, Reading, UK, RG1 3JHContact email, phone
  • Water Plus LtdFramework contractor South Court, Riverside Park, STOKE ON TRENT, UK, ST4 4DAContact email, phone

Official documents & specifications (2)

Official links; attachments are not copied

Tender pack and attachments

  • Economic and financial selection criteriatenderEconomic and financial selection criteria
  • Technical selection criteriatenderTechnical selection criteria