Find a TenderAwarded without competition
Published 2 Nov 2026, 10:21 GMT

Official UK procurement notice

Robert Peel Modular · UK public procurement notice

Official notice

Authority: Central Bedfordshire Council (Local council)

WorksAward procedure without prior publication of a call for competition
Awarded value£389,756published contract · exc. VAT
Awarded 2 Nov 2026no call for competition
Awarded to GB Construction (Herts) Limited
Notice summaryFrom the published notice

The contract was procured through the LHC Modular Buildings (MB3) Framework, established under the Public Contracts Regulations 2015. An Expression of Interest (EOI) was issued to the relevant framework suppliers, with only one supplier confirming their interest. The works are required urgently following structural concerns that resulted in the existing classroom building being condemned as unsafe for use.

What is being bought

Published requirement description

The contract was procured through the LHC Modular Buildings (MB3) Framework, established under the Public Contracts Regulations 2015.

An Expression of Interest (EOI) was issued to the relevant framework suppliers, with only one supplier confirming their interest. A direct award was subsequently progressed with this supplier in accordance with the framework's direct award provisions, subject to confirmation that the applicable call-off requirements were met.

The supplier's proposal was reviewed to ensure it met the service requirements and represented value for money.

CPV: Assembly and erection of prefabricated structures · Modular and portable buildings

The lotProcurement structure

single lot · no lot value published
Lot #1The contract is for the emergency demolition and removal of an existing unsafe…Awarded

The contract is for the emergency demolition and removal of an existing unsafe classroom building at Robert Peel Primary School and the relocation and installation of a modular building to provide two replacement classrooms.

The works include site preparation, groundworks and foundations, transportation and installation of the modular building, internal refurbishment to meet the school's requirements, and associated external works, including making good the playground.

The works are required urgently following structural concerns that resulted in the existing classroom building being condemned as unsafe for use.

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awards 1
Awarded value £389,7561 contract exc. VAT
Bids received 1
Contracts signed 1latest 2 Nov 2026
Awarded toValueDateStatus
GB Construction (Herts) LimitedSME£389,756 †—Awarded

Contracts

Bid statistics published by the authority

BidsSMEVCSEValid bid range
1bids———

Procedure terms & legal framework

From the official record
Procedure method
Award procedure without prior publication of a call for competition
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Works
Notice status
Awarded without competition
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Direct award (no call for competition)
GPA / WTO covered
Yes (GPA)
Recurring procurement
Unspecified in notice
First published
2 Nov 2026, 10:21 GMT
Last source update
2 Nov 2026, 10:21 GMT
Authority reference
CBC-2095-EXF-MC-SM
FTS notice number
2026/S 000-103586
Classification (CPV)
Assembly and erection of prefabricated structuresModular and portable buildings
Delivery area
North East (UKC)North West (UKD)Yorkshire & Humber (UKE)East Midlands (UKF)West Midlands (UKG)East of England (UKH)London (UKI)South East (UKJ)
+1 moreSouth West (UKK)
Official registry OCID
ocds-h6vhtk-079540 Find a Tender
Why no open competition
The procurement falls outside the scope of application of the directive
Published justification

The contract was procured through the LHC Modular Buildings (MB3) Framework, established under the Public Contracts Regulations 2015.

An Expression of Interest (EOI) was issued to the relevant framework suppliers, with only one supplier confirming their interest. A direct award was subsequently progressed with this supplier in accordance with the framework's direct award provisions, subject to confirmation that the applicable call-off requirements were met.

The supplier's proposal was reviewed to ensure it met the service requirements and represented value for money.

Contracting authority & participating public bodies

Central Bedfordshire Council

Contracting authorityLocal CouncilRegional or local authorityGeneral public services Priory House, Monks Walk, Chicksands, Shefford, East of England, SG175TQContact name, email

Bidders & participating suppliers

1 commercial party on the notice

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.