Find a TenderClosedTender notice
Published 8 Sept 2026, 13:36 BST

Official UK procurement notice

Public Footpath Surface Works - Harris Park Extension

Official notice

Authority: Cockermouth Town Council (Local council)

WorksBelow threshold - open competitionBelow thresholdSME suitableVCSE suitable
Published estimate£44,000£44,000 inc. VAT
Submissions closed 16 Oct 2026
Contract term Ends 15 Feb 2027up to 31 Mar 2027 with extensions · starts 1 Feb 2027

What is being bought

Published requirement description

1.1 The Authority

Cockermouth Town Council is inviting competitive tenders for minor civil works to improve a public footpath section. Engineering drawings and technical specifications were prepared on behalf of the Town Council by Cumberland Council.

1.2 Purpose of Work

The objective is to establish an accessible, surfaced route from Double Mills footbridge to the woodland section behind Dale View, Cockermouth. Currently, this missing link prevents access for pushchairs, wheelchairs, and less-mobile pedestrians.

1.3 Key Project Details

  • Design & Standards: Formulated via engineering drawings provided by Cumberland Council.
  • Target Start Date: February / March 2027 (Spring 2027) or before.
  • Contract Duration: Estimated 2 consecutive weeks.

2.1 Scope of Works

The contractor will provide all plant, labour, and materials to execute the following sequence:

  1. Site Establishment: Set up a secure temporary compound near the park entrance at Dale View.
  2. Safety Measures: Formally close Footpath No. 223015 to the public for the 2-week duration of works. (Cumberland Council has agreed to meet the costs of this)
  3. Excavation: Dig out a ground tray 50mm deep along the path alignment. Retain topsoil and arisings on-site for reuse.
  4. Membrane: Supply and lay a heavy-duty geotextile separation membrane along the length of construction.
  5. Sub-Base: Supply, lay, and compact a 150mm depth of Type 1 granular sub-base.
  6. Surface Course: Supply, lay, and compact a 40mm depth of 0-6mm crushed aggregate to form a smooth, accessible top finish.
  7. Alignment Note: The path alignment must run to the right-hand side of the park bench and to the left-hand side of the trees.
  8. Tie-ins: Saw cut the existing macadam path at chainage 0m near the Double Mills footbridge to ensure a flush finish. The end chainage must meet completely flush with the existing timber bridge deck.
  9. Landscaping: Smooth out and reinstate path edges using the saved arisings and topsoil, then seed with an 80/20 wildflower mix.

2.2 Critical Site Constraints

  • Narrow Access: Access to the park area is via a restrictive, narrow road at Dale View. Large commercial HGVs or oversized plant will not physically fit. Bidders must check this access profile prior to pricing.
  • Watercourse Proximity: The works run directly alongside the River Cocker.
  • Environmental Protection: All materials and plant machinery must remain at least 5 metres away from the watercourse channel on ground with no immediate flooding risk. Absolutely no refuelling, servicing, or greasing is allowed on site. Equipment must be checked for leaks before entering the site.
  • Flood Risk Management: Works must be carried out in generally dry conditions. The contractor is required to monitor local water levels and Environment Agency flood alerts prior to and during construction to reduce risk to the workforce.

CPV: Footpath construction work

The lotProcurement structure

single lot · value published
Lot #1RenewalSMEVCSEPublished value£44,000
Contract period: 1 Feb 2027 – 15 Feb 2027 · up to 31 Mar 2027 with extensionsValue: £44,000 exc. VAT · £44,000 inc. VAT
Extensions: • Target Start Date: February / March 2027 (Spring 2027) or before. • Contract Duration: Estimated 2 consecutive weeks.
Pre-qualification & selection criteria (PQQ)1
  • Condition of participation

    Insurance: The successful contractor must hold a valid Public Liability Insurance policy as a minimum requirement prior to the award of the contract.

    Access & Plant Restrictions: Bidders must verify the highly restrictive, narrow access route via Dale View prior to pricing. Large commercial HGVs or oversized plant will not physically fit the site layout.

    Environmental Management: Due to proximity to the River Cocker, the contractor must adhere to strict environmental rules, including a mandatory 5-metre equipment storage buffer from the watercourse channel, a total ban on on-site refuelling/servicing, and mandatory daily flood risk monitoring.

    System Registration: Bidders must be registered on the UK Government Central Digital Platform and provide their unique Supplier Share Code (PPON identifier) within the Form of Tender.

    Affordability Threshold: Any commercial bid exceeding the absolute budget threshold of £44,000 (Inclusive of VAT) will be automatically disqualified from evaluation.

    Full evaluation criteria, drawings, and submission requirements are detailed in the attached ITT (Double Mills Path Surface Improvements).

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored
Quality: 40%Price: 60%
Published sub-criteria (2)
  • Quality/Technical Criteria Description: 40%
  • Price: 60%
Published award criteria (2)
  • Price: This element will be evaluated objectively using a standard procurement mathematical formula based on the Total Gross Bid Price (Inclusive of VAT) submitted in the Bill of Quantities. Scoring Formula: The lowest valid commercial bid will automatically receive the maximum 60 points. Other bids will be scored using the following calculation: (Lowest Price ÷ Bidder's Price) x 60 = Price Score. Mandatory Rejection Threshold: Cockermouth Town Council has allocated a strict Budgetary Affordability Threshold of £40,000 (Inclusive of VAT) for this project. However, any commercial bid that exceeds an absolute maximum cap of £44,000 (Inclusive of VAT) will be automatically deemed unaffordable and will be immediately disqualified from the evaluation process without further review.
  • Quality/Technical Criteria Description: This element will be evaluated by an internal evaluation panel using a structured 0-to-5 scoring matrix based on the supplier's submitted Draft Method Statement. Bidders must demonstrate a thorough understanding of the specific site constraints. Bidders will be assessed on how safely and effectively they propose to execute the works while navigating two specific constraints: Access Restrictions: Proposing specific mini-plant machinery sizes that will physically fit down the highly restrictive, narrow road entrance at Dale View (oversized HGVs will not fit). Environmental Protection: Proposing comprehensive pollution prevention steps, mandatory 5-metre equipment buffers, and daily flood monitoring to protect the River Cocker watercourse environment. Scoring Formula: Each evaluating councillor will score the submission independently from 0 to 5. These marks will be added together and divided by the number of participating councillors to find the Average Panel Score. This average will then be converted into final quality points using the following calculation: Final Quality Points = (Average Panel Score divided by 5) x 40 Note: A score of 0 will be given if no Method Statement is provided.
Conditions of participation1
  • Condition of participation

    Insurance: The successful contractor must hold a valid Public Liability Insurance policy as a minimum requirement prior to the award of the contract.

    Access & Plant Restrictions: Bidders must verify the highly restrictive, narrow access route via Dale View prior to pricing. Large commercial HGVs or oversized plant will not physically fit the site layout.

    Environmental Management: Due to proximity to the River Cocker, the contractor must adhere to strict environmental rules, including a mandatory 5-metre equipment storage buffer from the watercourse channel, a total ban on on-site refuelling/servicing, and mandatory daily flood risk monitoring.

    System Registration: Bidders must be registered on the UK Government Central Digital Platform and provide their unique Supplier Share Code (PPON identifier) within the Form of Tender.

    Affordability Threshold: Any commercial bid exceeding the absolute budget threshold of £44,000 (Inclusive of VAT) will be automatically disqualified from evaluation.

    Full evaluation criteria, drawings, and submission requirements are detailed in the attached ITT (Double Mills Path Surface Improvements).

What this means for your bid
  • Price carries 60 of 100 points: a 10% discount moves about 6 points. This one is won on the number: sharpen the price before polishing the prose.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Below threshold - open competition
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Works
Notice status
Closed
Procurement threshold
Below threshold
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
8 Sept 2026, 13:36 BST
Last source update
8 Sept 2026, 13:36 BST
Authority reference
HPE2026
FTS notice number
2026/S 000-084883
Latest notice
Tender notice (UK4)
Classification (CPV)
Footpath construction work
Delivery area
North East (UKC)North West (UKD)Yorkshire & Humber (UKE)East Midlands (UKF)West Midlands (UKG)East of England (UKH)London (UKI)South East (UKJ)
+1 moreSouth West (UKK)
Official registry OCID
ocds-h6vhtk-06f481 Find a Tender

How it was run

Official notice
Submission deadline
16 Oct 2026, 12:00 BST
Clarification deadline
9 Oct 2026, 16:00 BST
Electronic submission
Not allowed
Detailed submission instructions & authority contactsFrom official release

Bidders must submit their completed application pack (Form of Tender, Bill of Quantities, and Draft Method Statement) before the closing deadline of Friday 16th October 2026 at 12:00 (Noon) using one of the two permitted methods set out in the ITT:

Option A (Electronic Email): Submit full proposals via email to [email protected] with the subject line "Form of Tender - Footpath No. 223015 Surface Improvements".

Option B (Hard Copy Post): Deliver proposals in a secure, sealed envelope marked "TENDERS" to: Tenders, Cockermouth Town Council, Town Hall, Market Street, Cockermouth, CA13 9NP. The outer envelope must bear no corporate branding or identifying marks.

Timeline

8 Sept 2026 → 1 Feb 2027 · 4 dates
  1. Tender notice published45 days ago
    8 Sept 2026, 13:36 BST
  2. Clarification questions by14 days ago
    9 Oct 2026, 16:00 BST
  3. Submission deadline7 days ago
    16 Oct 2026, 12:00 BST
  4. Today
    23 Oct 2026
  5. Contract startsin 100 days
    1 Feb 2027

Notice history

1 event · 1 release on Find a Tender
  1. Tender notice published
    8 Sept 2026, 13:36 BST
    UK4

Contracting authority & participating public bodies

Cockermouth Town Council

Contracting authorityPublic authority - sub-central government GB-PPON: PGRX-9669-WNPV Town Hall, Market Street, Cockermouth, North West, CA13 9NPContact name, email, phone

Official documents & specifications (4)

Official links; attachments are not copied

Tender pack and attachments

Notices published for this procedure

  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender