Find a TenderAwarded
Published 21 Feb 2025, 14:35 GMT

Official UK procurement notice

London Construction Programme General Works Framework MW25-GW

Official notice

Authority: London Borough of Haringey (Local council)·Consortium: 2 public authorities

Framework agreement16 lotsWorksOpen procedureMax 12 lots to bid
Framework ceiling (notional)£3,000,000,000total for 16 lots · framework ceiling, not attributable revenue
Submissions closed 21 Apr 2025awarded 24 Dec 2025
Lots 16max 12 to bid

What is being bought16 lots · detail below

Published requirement description

The London Construction Programme (LCP) on behalf of Haringey Council is procuring a new general works framework. The scope of works will include a wide range of works across multiple types of buildings including individual, multiple occupancy, residential, commercial, heritage, community and those operated by the public sector on a 24 hour basis (i.e. police, health, fire and rescue, care homes etc.). The scope of the works will include (but not limited to), new buildings, MMC, planned and preventative maintenance, refurbishment, retrofit, fire safety works, heritage related works, remediations, mechanical and engineering services, renewable energy systems and adaptations.

The Framework will be established for a period of 5 years and will be available to any public sector body in London and the Home Counties. It is anticipated the framework will commence in September 2025.

The London Construction Programme was established in 2012 by Haringey Council was, encouraged and supported by other London Local Authorities through London Councils, to develop a pan-London strategy to improve construction related procurement and establish a suite of collaborative contractual vehicles which public sector organisations can utilise. The LCP currently has a total membership of over 60 Public Sector organisations in London and Home County. The LCP is a 'virtual organisation' currently hosted and operated by Haringey Council.

The current LCP Framework (MW19) expired in October 2024. This new Framework is to provide General Works construction and General Works construction related activities for new build developments, building related planned component replacement, fire safety, remediations, retrofit and refurbishments according to the Lot Categories.

The services will be procured in 16 lots:

Lot GN1 New Build up to £7.5m contract value

Lot GN2 New Build £6m - £15m contract value

Lot GN3 New Build £14m+ contract value

Lot GNPS New Build £1+ (i.e.no minimum contract value)

Lot GF1 Fire Safety Works up to £7.5m contract value

Lot GF2 Fire Safety Works £6m - £15m contract value

Lot GF3 Fire Safety Works £14m+ contract value

Lot GFPS Fire Safety Works £1+ (i.e.no minimum contract value)

Lot GR1 Refurbishment and Retrofit up to £7.5m contract value

Lot GR2 Refurbishment and Retrofit £6m - £15m contract value

Lot GR3 Refurbishment and Retrofit £14m+ contract value

Lot GRPS Refurbishment and Retrofit £1+ (i.e.no minimum contract value)

Lot GP1 Planned Preventative Maintenance up to £7.5m contract value

Lot GP2 Planned Preventative Maintenance £6m - £15m contract value

Lot GP3 Planned Preventative Maintenance £14m+ contract value

Lot GPPS Planned Preventative Maintenance £1+ (i.e.no minimum contract value)

Tenderers are restricted to applying for a maximum of two sub lots, plus the PS sub lot in each of the primary Lots (i.e. New Build, Fire Safety Works, refurbishment and retrofit, Planned Preventative Maintenance).

There are reserved places for micro and small enterprises on different Lots in order to encourage SMEs and provide choice for its Clients.

A Reserve List will also be used for this framework for those Tenderers who are unsuccessful in being awarded a place on the primary Lots.

The framework will be established with four main objectives in mind:-

  1. To support its Clients to deliver on their net zero commitments in the following areas:-
  • Biodiversity assets
  • Climate Change adaptation
  • Zero Carbon Supply Chain
  • Low Carbon Transportation
  • Operational Low Carbon
  1. To provide a fast and efficient route to market for education schemes across London and the Home Counties that offers value for money.
  2. To drive positive changes in mental health and equality, diversity and inclusion in the construction sector.
  3. To apply best practice, unlock innovation and work collaboratively with its Client and the Supply Chain.

CPV: Construction work

How this framework works

From the published notice
Bids received
66 bids received · 44 suppliers appointed

Lots and requirements (16)Procurement structure

16 lots · no lot values published · a supplier may bid for at most 12 of them · evaluation weights differ by lot
Lot #1Fire and Safety Works Valued up to £7.5mAwarded

GF1 (Fire Safety Works up to £7.5million)

Extensions: Initial contract is for a period of 60 monthsVariant bids: not allowed
Lot #2Fire and Safety Works Valued £6m to £15mCancelled

GF2 (Fire Safety Works £6m to £15m)

Extensions: Initial contract is for a period of 60 monthsVariant bids: not allowed
Lot #3Fire and Safety Works Valued £14m+Cancelled

Initial contract is for a period of 60 months

Extensions: Initial contract is for a period of 60 monthsVariant bids: not allowed
Lot #4Fire and Safety works for Public Sector BuildingsCancelled

GFPS (Fire Safety Works £1 and above)

Extensions: Initial contract is for a period of 60 monthsVariant bids: not allowedElectronic catalogue: required
Lot #5General New Build Works Valued up to £7.5mAwarded

Lot GN1 New Build up to £7.5m contract value

Extensions: Initial contract is for a period of 60 monthsVariant bids: not allowed
Lot #6General New Build Works £6m- £15mCancelled

GN2 (New Build £6m to £15m)

Extensions: Initial contract is for a period of 60 monthsVariant bids: not allowed
Lot #7General New Build Works £14m+Awarded

GN3 (New Build £14m and above)

Extensions: Initial contract is for a period of 60 monthsVariant bids: not allowed
Lot #8General New Build Works for Public Sector BuildingsAwarded

GNPS (New Build £1 and above)

Extensions: Initial contract is for a period of 60 monthsVariant bids: not allowed
Lot #9Planned and Preventative Maintenance Works Valued up to £7.5mAwarded

GP1 (Planned Preventative Maintenance up to £7.5million)

Extensions: Initial contract is for a period of 60 monthsVariant bids: not allowed
Lot #10Planned and Preventative Maintenance Works Valued £6m to £15mCancelled

GP2 (Planned Preventative Maintenance £6m to £15m)

Extensions: Initial contract is for a period of 60 monthsVariant bids: not allowed
Lot #11Planned and Preventative Maintenance Works Valued £14m+Cancelled

GP3 (Planned Preventative Maintenance £14m and above)

Extensions: Initial contract is for a period of 60 monthsVariant bids: not allowed
Lot #12Planned and Preventative Maintenance Works for Public Sector BuildingsCancelled

GPPS (Planned Preventative Maintenance £1 and above)

Extensions: Initial contract is for a period of 60 monthsVariant bids: not allowed
Lot #13Refurbishment and Retrofit Works Valued up to £7.5mAwarded

GR1 (Refurbishment and Retrofit up to £7.5million)

Extensions: Initial contract is for a period of 60 monthsVariant bids: not allowed
Lot #14Refurbishment and Retrofit £6m- £15mAwarded

GR2 (Refurbishment and Retrofit £6m to £15m)

Extensions: Initial contract is for a period of 60 monthsVariant bids: not allowed
Lot #15Refurbishment and Retrofit Works £14m+Cancelled

GR3 (Refurbishment and Retrofit £14m and above

Extensions: Initial contract is for a period of 60 monthsVariant bids: not allowed
Lot #16Refurbishment and Retrofit Works for Public Sector BuildingsAwarded

GRPS (Refurbishment and Retrofit £1 and above)

Extensions: Initial contract is for a period of 60 monthsVariant bids: not allowed

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
Conditions of participation2
  • Suitability

    There will be reserved spaces for micro and small enterprises for certain Lots. This means minimum turnover thresholds will apply. Please refer to the tender documentation for further details.

    Some Lots will require certain accreditations, these are stated in the Tender documents.

  • Economic & financial standing

    Some lots have reserved spaces for micro and small enterprises. This means minimum turnover thresholds will apply. Please refer to the tender documentation for further details.

    "Micro-enterprise" for the purpose of this tender will be a minimum turnover of £3m, up to

    £10m.

    "Small-enterprise" for the purpose of this tender will be a minimum turnover of £10m, up to

    £30m.

    "Medium-enterprise" for the purpose of this tender will be a minimum turnover of £30m, up to £50m.

    "Large-enterprise" for the purpose of this tender will be a minimum turnover of £50m.

    Minimum financial standing requirements are stated in the Tender documents.

What this means for your bid
  • Price carries 30–70 points depending on the lot; most lots put it at 30 points.
  • “London Construction Programme General Works Framework MW25-GW” is a framework: the contest is a place on its panel, not a single contract.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record · publisher note attached
Procedure method
Open procedure
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Works
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
No (one-off requirement)
First published
21 Feb 2025, 14:35 GMT
Last source update
8 Jul 2026, 09:49 BST
Award evaluation window
22 Apr 2025 – …
Authority reference
MW25-GW
FTS notice number
2026/S 000-063953
Classification (CPV)
Construction work
Delivery area
North East (UKC)North West (UKD)Yorkshire & Humber (UKE)East Midlands (UKF)West Midlands (UKG)East of England (UKH)London (UKI)South East (UKJ)
+1 moreSouth West (UKK)
Official registry OCID
ocds-h6vhtk-04e6d8 Find a Tender

Publisher note: For further details on how to access and complete the Tender submissions, please refer to Document 1 Invitation to Tender Document MW25-GW on the Haringey HPCS Portal London Borough of Haringey - Upcoming Opportunities. Please note, Tenderers may be required to register on the portal to access this opportunity. The framework is open to all public sector organisations within the specified geographic area. This includes (but is not limited to):- Local Authorities (include all County, City, District and Borough Councils, London Boroughs), and their arms length organisations Central Government Department and Agencies http://local.direct.gov.uk/LDGRedirect/MapLocationSearch.do?mode=1.1 Government Departments, agencies and public bodies https://www.gov.uk/government/organisations Education establishments (schools, school governing bodies; voluntary aided schools; foundation schools; any faith educational establishments including the Roman Catholic Dioceses and Anglican Dioceses, associated with the named Local Authorities including diocesan authorities; academies; free schools, city technology colleges; foundation partnerships; education authorities, publicly funded schools, universities, colleges, further education establishments; higher education establishments and other educational establishments) http://www.education.gov.uk/edubase/public/quickSearchResult.xhtml?myListCount=0 https://www.gov.uk/find-school-in-england http://www.schoolswebdirectory.co.uk/ https://www.gov.uk/check-a-university-is-officially-recognised/recognised-bodies http://search.ucas.com/ http://learning-provider.data.ac.uk National Parks Authorities http://www.nationalparksengland.org.uk Social Enterprises within Culture and Leisure Registered providers of Social Housing https://www.gov.uk/government/publications/current-registered-providers-of-social- housing Police Forces http://www.police.uk/?view=force_sites https://www.gov.uk/police-and-crime-commissioners Fire and Rescue Services http://www.fireservice.co.uk/information/ukfrs NHS Bodies England https://digital.nhs.uk/services/directory-of-services-dos Third Sector and Charities in the United Kingdom: http://register-of-charities.charitycommission.gov.uk/ http://www.oscr.org.uk/ Any other Public Sector organisation located within London and the regions specified in this notice.

How it was run

Official notice
Run through: portal not identified
Language: EN
Appointment period ends
21 Apr 2025, 17:00 BST
Submission channel
{"electronicSubmission","written"}
Accepted languages
en
Bids opened
22 Apr 2025, 09:30 BST
Detailed submission instructions & authority contactsFrom official release

Timeline

21 Apr 2025 → 8 Jul 2026 · 3 dates
  1. Admission / appointment period endsperiod end, not a bid countdown
    21 Apr 2025, 17:00 BST
  2. Bids opened
    22 Apr 2025, 09:30 BST
  3. Notice published106 days ago
    8 Jul 2026, 09:49 BST

Notice history

2 events · 3 releases on Find a Tender · since 19 Mar 2026
  1. Status changed to complete
    19 Mar 2026, 09:28 GMT
  2. Buyer details updated
    19 Mar 2026, 09:28 GMT
Published amendments (1)

The NUTS codes were originally incorrect and have been updated to reflect the right codes. UKH12 - Cambridgeshire CC UKH2 - Bedfordshire and Hertfordshire UKH3 - Essex UKI - London UKJ1 - Berkshire, Buckinghamshire and Oxfordshire UKJ2 - Surrey, East and West Sussex UKJ3 - Hampshire and Isle of Wight UKJ4 - Kent

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Suppliers appointed 44admitted to the panel · see the list ↓
Bids received 66
Contracts signed 20latest 24 Dec 2025

44 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.

Contracts

All 20 of these contracts carry the same published figure, £3,000,000,000, the framework's maximum for the whole notice, not each contract's own value. They are not eleven separate sums.

  • Contract 024932-2026-1

    Signed
    24 Dec 2025
    Value
    ceiling above
    Status
    active
  • Contract 024932-2026-10

    Signed
    24 Dec 2025
    Value
    ceiling above
    Status
    active
  • Contract 024932-2026-11

    Signed
    24 Dec 2025
    Value
    ceiling above
    Status
    active
  • Contract 024932-2026-12

    Signed
    24 Dec 2025
    Value
    ceiling above
    Status
    active
  • Contract 024932-2026-13

    Signed
    24 Dec 2025
    Value
    ceiling above
    Status
    active
  • Contract 024932-2026-14

    Signed
    24 Dec 2025
    Value
    ceiling above
    Status
    active
  • Contract 024932-2026-15

    Signed
    24 Dec 2025
    Value
    ceiling above
    Status
    active
  • Contract 024932-2026-16

    Signed
    24 Dec 2025
    Value
    ceiling above
    Status
    active
  • Contract 024932-2026-17

    Signed
    24 Dec 2025
    Value
    ceiling above
    Status
    active
  • Contract 024932-2026-18

    Signed
    24 Dec 2025
    Value
    ceiling above
    Status
    active
  • Contract 024932-2026-19

    Signed
    24 Dec 2025
    Value
    ceiling above
    Status
    active
  • Contract 024932-2026-2

    Signed
    24 Dec 2025
    Value
    ceiling above
    Status
    active
  • Contract 024932-2026-20

    Signed
    24 Dec 2025
    Value
    ceiling above
    Status
    active
  • Contract 024932-2026-21

    Signed
    24 Dec 2025
    Value
    ceiling above
    Status
    active
  • Contract 024932-2026-22

    Signed
    24 Dec 2025
    Value
    ceiling above
    Status
    active
  • Contract 024932-2026-23

    Signed
    24 Dec 2025
    Value
    ceiling above
    Status
    active
  • Contract 024932-2026-24

    Signed
    24 Dec 2025
    Value
    ceiling above
    Status
    active
  • Contract 024932-2026-25

    Signed
    24 Dec 2025
    Value
    ceiling above
    Status
    active
  • Contract 024932-2026-26

    Signed
    24 Dec 2025
    Value
    ceiling above
    Status
    active
  • Contract 024932-2026-27

    Signed
    24 Dec 2025
    Value
    ceiling above
    Status
    active

Bid statistics published by the authority

LotBidsSMEVCSEValid bid range
1 · Fire and Safety Works Valued up to £7.5m66bids———
5 · General New Build Works Valued up to £7.5m66bids———
7 · General New Build Works £14m+66bids———
8 · General New Build Works for Public Sector Buildings66bids———
9 · Planned and Preventative Maintenance Works Valued up to £7.5m66bids———
13 · Refurbishment and Retrofit Works Valued up to £7.5m66bids———
14 · Refurbishment and Retrofit £6m- £15m66bids———
16 · Refurbishment and Retrofit Works for Public Sector Buildings66bids———
Whole notice66bids———

Contracting authority & participating public bodies

2 public bodies on the notice

LONDON BOROUGH OF HARINGEY

Contracting authorityLocal CouncilRegional or local authorityGeneral public services Alexandra House, 10 Station Road, Wood Green, LONDON, London, N22 7TRContact email Published organisation website ↗

Framework contractors & participating bidders

44 commercial parties on the notice
Show 34 more suppliers

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.