Official UK procurement notice
Framework for Scaffolding: Lot 1 Highway Services and Lot 2 Construction Services
Authority: Durham County Council (Local council)
What is being bought2 lots · detail below
Published requirement descriptionFramework for Scaffolding: Lot 1 Highway Services and Lot 2 Construction Services
This Framework will be available for use by Durham County Council and additional
Contracting Authorities, where they have entered into a Procurement Service Level
Agreement (SLA) with DCC. Including other Organisations and Local / Non-Local
Authorities where agreed with Durham County Council. For information regarding SLAs
and Access Agreements please contact: [email protected]
The Framework period is 2 years, with the options to extend up to 2 x 12 months, from the
contract end date. Framework commencement date is 1st March 2026.
The opportunity is issued as a multiple Lot contract, Lot 1 Scaffolding for Highway Services, and Lot 2 Scaffolding for Construction Services. Bidding organisations can
apply for Lot 1 and / or Lot 2.
The Framework does not include any guarantee of any minimum volume works, or any
minimum expenditure. It is a condition of this Framework that the successful Provider(s)
must pay up to 1% retrospective rebate based on all business transacted via this
Framework for the entire duration of the Contract period.
Supplier Early Payment Discount It is to be noted that if you opt in to SIP, the % applies for the duration of the framework including any extension
CPV: Construction work
How this framework works
From the published notice- Type
- Open framework
- Call-offs
- call-offs may be awarded directly or by further competition
- Places
- up to 3 suppliers · 3 appointed (full)
- Framework period
- 2 yrs · up to 4 yrs from 1 Mar 2026
- Supplier levy on call-offs (max %)
1% of call-off value · It is a condition of this Framework that the successful Provider(s)
must pay up to 1% retrospective rebate based on all business transacted via this
Framework for the entire duration of the Contract period
Who may buy through it
This Framework will be available for use by Durham County Council and additional
Contracting Authorities, where they have entered into a Procurement Service Level
Agreement (SLA) with DCC. Including other Organisations and Local / Non-Local
Authorities where agreed with Durham County Council. For information regarding SLAs
and Access Agreements please contact: [email protected]
Published description of the framework
For this Scaffolding Framework for Lot 1 Highway Services and Lot 2 Construction Services, the Council intends to have a maximum number of 3 contractors as having a place on the framework in ranked order. Any proposed award, direct award or competed call off is subject to the maximum rates applicable as tendered It is to be noted for all call offs it is expected competitive pricing in the open market.
The first ranked placed contractor on the framework, following this Invitation to Bid (ITB) will be awarded all calls offs for less than £80,000 which is classified as:
- urgent or an emergency requirement - i.e. H&S Implications
- Delivery of a specific project which benefits that can be assessed using the information provided at the point of Framework establishment.
- An option of an expression of interest whereby no other Contractor is willing/able to deliver the call off contract.
- When early contractor engagement is required to develop the specification and scope of works required or to undertake survey
The Council reserves the right to make direct awards with the first ranked contractor or undertake a competed call off for less than £80k with all contractors for value for money to be shown or if a project is grant funded and a competitive process is to be proven. The Council will decide on the process for every Call off.
Time is of the essence and is essential for the undertaking for call of Contracts under this Framework. If the first placed Contractor (following the process above) is unable to supply the goods and services within the agreed timescale for delivery the Council will follow the process below.
The second ranked Contractor will be offered the call off Contract. If this Contractor is also unable to undertake the contract the third placed Contractor will be selected in accordance with their ranked position until a Contractor is able to undertake the Works.
These direct call offs will be 100% price (with the possibility of essential criteria being added if required for that Call off). Each call off project must not exceed, but maybe less than the 'maximum rate' costs as identified in their original tender proposal. If you have opted in for the supplier incentive payments your % applied on the original framework submission will apply to all call offs.
This will be the process for the direct call offs for the duration of this framework including any extensions. If none of the placed Contractors can fulfil the requirements of a direct call off the Council it reserves the right to go outside of this Framework Agreement It is to be noted there may be an occasion to conduct a Scaffolding Works process outside of the Framework where this is of a significant nature or of specialist provision or where it is of the opinion of the Council the requirements cannot be met within the framework or the Council wishes to test value for money.
For Call-Offs over £80,001 a Competed Call-Off process will be carried out or where there may be a requirement for example to show value for money, in this situation all placed Contractors on the framework will be invited to take part in this competed call off.
The criteria for Competed call offs will be detailed within the documentation issued. Each contractor bid for the call off competitive project must not exceed, but maybe less than the 'maximum rate' costs as identified in their original tender proposal. Any Contractor who submits a bid which exceeds their 'maximum rate' costs will be removed from that competed call off.
The competed all off-document award criteria will be deemed appropriate for that specific project. This will include individual weightings, to reflect the requirements, within the further competition documentation which may differ from the weightings used for the appointment on the Framework Agreement. Weightings to be applied to this can be either of the following:
Price 0% -100%
Quality 0% -100%
Social Value 0% - 10%
This can be any percentage, 100% price or a mixture of quality and price or quality, price and social value. KPI's may be included in any off these calls and rebates will apply. If you have opted in for the SIP the % applied on the original framework submission will apply to all competitive call offs.
Lots and requirements (2)Procurement structure
2 lots · all with a published valueEvery one of these 2 lots carries the same published figure, £1: it is the framework's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.
Lot #1Scaffolding: Lot 1 Highway ServicesAwardedRenewalceiling above
Scaffolding: Lot 1 Highway Services.
Bidding organisations will need to provide scaffolding for projects for Highway Operations work which usually requires scaffolds which are classed as designed scaffold under TG20:21 and often erected over running water.
Successful contractors will, in addition to planned projects, be required to provide a same day emergency response to cover emergency requirements such as for example: - dangerous occurrences such as a bridge collapse, and make safe call outs should any adverse weather make a scaffold dangerous
Lot #2Scaffolding: Lot 2 Construction ServicesAwardedRenewalceiling above
Scaffolding: Lot 2 Construction Services
Bidding organisations will be required to provide Scaffolding to support construction works. This is to include the provision and erection of various scaffolding equipment to include scaffold design and subsequent dismantling and removal of scaffold.
All scaffolds are to be provided with an identification label. Successful contractors will, in addition to planned projects, be required to provide a same day emergency response to cover emergency requirements such as for example: - dangerous occurrences such as a building collapse and make safe call outs should any adverse weather make a scaffold dangerous.
Further details of the requirements are set out in Document 3A Specification
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
- “Framework for Scaffolding: Lot 1 Highway Services and Lot 2…” is a framework: the contest is a place on its panel, up to 3 suppliers, not a single contract: call-offs may be direct or by further competition.
Procedure terms & legal framework
From the official record- Procedure method
- Below threshold - open competition
- Legal basis
- UKPGA · 2023/54 Procurement Act 2023
- Procurement category
- Works
- Notice status
- Awarded
- Procurement threshold
- Below threshold
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use the vehicle
- This Framework will be available for use by Durham County Council and additional Contracting Authorities, where they have entered into a Procurement Service Level Agreement (SLA) with DCC. Including other Organisations and Local / Non-Local Authorities where agreed with Durham County Council. For information regarding SLAs and Access Agreements please contact: [email protected]
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Unspecified in notice
- First published
- 24 Nov 2025, 13:23 GMT
- Last source update
- 17 Mar 2026, 14:37 GMT
- Authority reference
OPEN20252025- FTS notice number
2025/S 000-076468- Latest notice
- Contract details notice (UK7)
- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-05e763Find a Tender
How it was run
Official notice- Appointment period ends
- 18 Dec 2025, 12:00 GMT
- Clarification deadline
- 12 Dec 2025, 16:00 GMT
- Submission channel
- Official e-sourcing portal
- Electronic submission
- Allowed
- Supplier levy on call-offs (max %)
call-off levy · 1% of call-off value · It is a condition of this Framework that the successful Provider(s)
must pay up to 1% retrospective rebate based on all business transacted via this
Framework for the entire duration of the Contract period
To tender for this opportunity bidding organisations must download the tender documents from www.open-uk.org ↗ and search for 20252025 within the supplier area.
The documents cannot be obtained any other way
Timeline
24 Nov 2025 → 17 Mar 2026 · 5 dates- Tender notice published325 days ago24 Nov 2025, 13:23 GMT
- Clarification questions by307 days ago12 Dec 2025, 16:00 GMT
- Admission / appointment period ends301 days ago · period end, not a bid countdown18 Dec 2025, 12:00 GMT
- Contract starts229 days ago1 Mar 2026
- Latest notice published212 days ago17 Mar 2026, 14:37 GMT
Notice history
2 events · 1 release on Find a Tender · since 24 Nov 2025- Tender notice published24 Nov 2025, 13:23 GMTUK4
- Contract details notice published17 Mar 2026, 14:37 GMTUK7
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast2 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.
Contracts
All 2 of these contracts carry the same published figure, £2,000,000, the framework's maximum for the whole notice, not each contract's own value. They are not eleven separate sums.
Framework for Scaffolding: Lot 2 Construction Services
- Signed
- 17 Feb 2026
- Value
- ceiling above
- Period
- 1 Mar 2026 – 28 Feb 2028 · up to 28 Feb 2030 with extensions
- Status
- active
- Extensions
- up to 2 x 12 month extensions
Framework for Scaffolding: Lot 1 Highway Services
- Signed
- 16 Feb 2026
- Value
- ceiling above
- Period
- 1 Mar 2026 – 28 Feb 2028 · up to 28 Feb 2030 with extensions
- Status
- active
- Extensions
- Option to extend by 2 x 12 months
Contracting authority & participating public bodies
Framework contractors & participating bidders
5 commercial parties on the notice- Ingleford ScaffoldingFramework contractor
- Ingleford Scaffolding LtdFramework contractor
- KAEFER LimitedFramework contractor
- TIS (NGA) LtdFramework contractor
- TIS (NGA) LtdFramework contractor
Official documents & specifications (3)
Official links; attachments are not copiedNotices published for this procedure
- Contract details notice Contract details notice on Find a Tender
- Contract details notice Contract details notice on Find a Tender
- Tender notice Tender notice on Find a Tender