Find a Tender
planned
Official procurement procedure
Building, Delivery and Installation of an Open Raft Facility
Architectural
construction
engineering and inspection services
+2 more
Published value
£3,750,000
Submission deadline Not published
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: NPL Management Limited: "Building, Delivery and Installation of an Open Raft Facility". Published status: planned. Published value: £3,750,000. 1 published lot. Submission deadline not published. See the official notice for participation instructions.
| Contracting Authority | NPL Management Limited | Scope & Categories | Not published | Submission Window | planned No deadline published |
|---|---|---|---|---|---|
| Submission Gateway | Direct notice route | Legal Basis & Regime | Standard procurement | Estimated Value (exc. VAT) | £3,750,000 |
Bidder Intelligence · Authority Profile: NPL Management Limited
Market Analytics
Derived from OCDS awards & bid statistics
Published history for NPL Management Limited. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Competition Density
8Bids / Report
Supplier ConcentrationHigh Concentration
Pye Tait LtdTop vendor: 100% of attributable valuePayment Terms
Check noticePublished terms
Coverage: 315 active published awards; 1 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Historical Awarded Suppliers With This Authority:
| Supplier Name | Historic Awards | Attributable GBP Value |
|---|---|---|
| Pye Tait Ltd | 1 win | £52,950 |
Procedure terms
Contracting AuthorityNPL Management Limited | Procedure methodNot published | Procurement categoryNot published |
Statusplanned | Framework / DPSNot published | CompetitionNot published |
Above thresholdNot published | Legal basisNot published | Tender period startsNot published |
Clarification deadlineNot published | Electronic submissionNot published | Submission languagesNot published |
Published22 May 2025, 12:13 BST | Last source update22 May 2025, 12:13 BST | Recurring procurementNot published |
ClassificationArchitectural, construction, engineering and inspection services, Construction structures and materials; auxiliary products to construction (except electric apparatus), Construction work | ||
OCIDocds-h6vhtk-051d47 | ||
What is being bought
The open raft facility is a floating structure for testing of underwater ultrasonic devices located on the Wraysbury Reservoir in Middlesex, UK. It comprises a buoyant structure assembled from modular pontoons with a steel grillage deck structure sheathed with non-slip GRP panels. There are two large moonpools with gantry cranes over each, plus four hydraulic knuckle boom cranes for handling test equipment and loading/off-loading from supply boats. Accommodation comprises modular buildings fitted out as laboratory, office, accommodation, workshop and store spaces.
The whole structure is to be modular, delivered to site by road and assembled in the water.
Mooring is to four concrete sinkers with mooring wires and shock absorbing chains to the
pontoon.Included in the contract is the safe and ecologically compliant disposal of the existing facility.
The objective of the project is to replace the existing facility with a new and substantially
improved pontoon for the testing and calibration of underwater acoustic transducers and
associated apparatus.
Overall dimensions of the pontoon are approximately 32.50 metres long and 31 metres beam comprising five hulls each consisting of six (6) modular pontoons supporting a deck of steel grillage construction topped with non-slip glass fibre panels. Safety railings, arranged in portable sections are to be fitted around the perimeter of the pontoon and around both moon pools.
Within the pontoon will be two (2) moon pools one about 20.00 metres long, the other around 15 metres, both are 4.20 metres wide over which will be gantry cranes incorporating the test equipment lifting stations.
For loading/offloading equipment, stores and ancillary items there will be four (4) hydraulic
knuckle boom cranes.
Accommodation comprises four (4) structures constructed from modular buildings; the main two storey accommodation building, located on the centreline between the moon pools, towards the forward end of the pontoon, incorporating; on the ground floor, the laboratories, workshop, store and plant room.
On the first floor, accessed by an internal staircase, will be a canteen with kitchenette and an open plan office.
Aft of the main building towards the stern is a single storey building, described as the client store/office space; it is divided into two sections, one for the storage of test equipment and the other office spaces for clients.
To starboard forward is a small single storey building for additional office space; aft to port is another small building for use as a garage/store.
Suitable rubber 'D' section fendering is to be fitted around the periphery of the pontoon to prevent damage of both the pontoon and the vessels servicing it.
Services are arranged from shore to the pontoon and include 400/3/50 AC power supply,
telephone and internet.
Mooring of the pontoon will be by four (4) concrete sinkers suitably positioned on the reservoir bottom and connected to the pontoon by adjustable length steel galvanised wire mooring warps with heavy short link chain cable shock absorbers.
Budgeted amount: £3,750,000.00
What changed
From the official release history
- Published value updated to £3,750,000
22 May 2025, 12:13 BST - Status changed to planned
22 May 2025, 12:13 BST - Official notice release published
22 May 2025, 12:13 BST - Buyer information updated
22 May 2025, 12:13 BST
Lots and requirements (1)
Published by the contracting authority
- Lot 1 · #1Individual lot title not publishedplannedPublished valueNot publishedThe source published no individual title or description for this lot.Contract periodNot publishedEligibilityNot publishedOptions / renewalNot published
Timeline
- Pipeline notice
22 May 2025, 12:13 BST - Procedure published
22 May 2025, 12:13 BST
Commercial outcome and competition
AwardsNo award published |
ContractsNo contract published |
Bid statisticsNo aggregate bid statistics published |
Buyer and organisations in this procedure
NPL Management Limited
Contracting authority GB-COH-02937881Documents (1)
Official links; attachments are not copied
- 22 May 2025, 12:13 BST
Related procedures (0)
No related procedures published
Planning and rationale
Planning budgetNot published |
No-engagement rationaleNot published |
Procedure rationaleNot published |