Retender radar: UK public contracts ending soon
Every contract in the catalogue with a published end date in the future, one row per contract (lot). A contract ending is a procurement starting, unless the buyer uses a published extension option, which the row shows. Frameworks and DPS are marked: what ends there is the vehicle, not one supplier’s contract.
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
252 contracts end within 24 months, 424 in total · £1.5bn published GBP value, exc. VAT, in the next 12 months (framework ceilings included, not a spend forecast).
By sector, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
CPV division of the procedure; a contract with several divisions counts in each.
85Health and social work services1,17333Medical equipments, pharmaceuticals59179Business services: law, marketing, consulting48072IT services: consulting, software, internet18780Education and training services17860Transport services (except waste transport)17550Repair and maintenance services16715Food, drink, tobacco162
Contracts ending in the next 12 months
Showing 676–690
- Ends · in 322 days
B947 (2020) Excavation, Cable laying and Reinstatement
Northern Ireland Electricity Networks Limited · Northern Ireland
Incumbent: Morrow Contracts Ltd
- Contract value
- £37m
- Annual run-rate
- —start date not published
- Term
- Ends 31 Aug 2027 · start not published
- Reference
ocds-h6vhtk-06c21e
- Ends · in 322 daysExtension option · up to 31 May 2028
Core Valley Lines (CVL) Transformation: Complex track works with associated level boarding works
Transport for Wales · Other public body · Wales (Cymru)
Incumbent: Amey Infrastructure Wales (AIW)
- Contract value
- £9.8m
- Annual run-rate
- £7.1mvalue ÷ published term
- Term
- 13 Apr 2026 → 31 Aug 2027 · 1.3 yrs · up to 31 May 2028 with extensions
- Reference
ocds-h6vhtk-059e3f
- Ends · in 322 daysFramework re-letPanel · 6 suppliers
Lot 1 - Supply and Installation of Curtains and Blinds
ESPO · Nationwide (UK)
Panel: Bridge Contract Solutions LTD, Custom Group Limited, SIR JACOB BEHRENS AND SONS LIMITED +3 more
- Contract value
- £3.8mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 31 Aug 2027 · start not published
- Reference
ocds-h6vhtk-045802
- Ends · in 322 days
Netherhall School - Replacement External Doors and Windows
Cumberland Council · Local authority · North West England
Incumbent: Thomas Armstrong (Construction) Ltd
- Contract value
- £859k
- Annual run-rate
- £406kvalue ÷ published term
- Term
- 21 Jul 2025 → 31 Aug 2027 · 2.1 yrs
- Reference
ocds-h6vhtk-050b2f
- Ends · in 322 daysFramework re-letPanel · 2 suppliers
Lot 2 - Supply and Installation of Electrically Powered Blinds
ESPO · Nationwide (UK)
Panel: Custom Group Limited, Wattrus Group Limited
- Contract value
- £750kceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 31 Aug 2027 · start not published
- Reference
ocds-h6vhtk-045802
- Ends · in 322 daysFramework re-let
Lot 3 - Supply and Installation of Theatre and Drama Room Equipment
ESPO · Nationwide (UK)
Incumbent: Custom Group Limited
- Contract value
- £750kceiling for the whole framework
- Annual run-rate
- —ceiling, not a run-rate
- Term
- Ends 31 Aug 2027 · start not published
- Reference
ocds-h6vhtk-045802
- Ends · in 322 daysFramework re-let
Lot 4 - Supply and Installation of Security Shutters and Grilles
ESPO · Nationwide (UK)
Incumbent: Custom Group Limited
- Contract value
- £750kceiling for the whole framework
- Annual run-rate
- —ceiling, not a run-rate
- Term
- Ends 31 Aug 2027 · start not published
- Reference
ocds-h6vhtk-045802
- Ends · in 322 days
HAR6108 Wood Wharf School
Tower Hamlets · Other public body · Greater London
Incumbent: Alpine Works Limited
- Contract value
- £736k
- Annual run-rate
- £565kvalue ÷ published term
- Term
- 13 May 2026 → 31 Aug 2027 · 1.3 yrs
- Reference
ocds-h6vhtk-065a8b
- Ends · in 322 days
The Willows School Full Heating and Distribution Upgrade
Milton Keynes City Council · Local authority · South East England
Incumbent: SDG Electrical & Mechanical Engineering Ltd
- Contract value
- £363k
- Annual run-rate
- £276kvalue ÷ published term
- Term
- 8 May 2026 → 31 Aug 2027 · 1.3 yrs
- Reference
ocds-h6vhtk-06567d
- Ends · in 322 daysExtension option · up to 31 Aug 2029
Play Areas Repairs & Maintenance Works
Wychavon District Council · Local authority · West Midlands
Incumbent: Continental Landscapes Limited
- Contract value
- £295k
- Annual run-rate
- £148kvalue ÷ published term
- Term
- 1 Sept 2025 → 31 Aug 2027 · 1.9 yrs · up to 31 Aug 2029 with extensions
- Reference
ocds-h6vhtk-0526d3
- Ends · in 322 daysFramework re-letPanel · 6 suppliers
Asbestos Removal Services
Cambridgeshire County Council · Local authority · East of England
Panel: AA Woods, ASPECT CONTRACTS LIMITED, Asbestech Ltd +3 more
- Contract value
- Not published
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 31 Aug 2027 · start not published
- Reference
ocds-h6vhtk-045686
- Ends · in 322 daysFramework re-letPanel · 4 suppliers
Demolition Services
Cambridgeshire County Council · Local authority · East of England
Panel: CAWARDEN CO. LIMITED, DSM Demolition, Jackson Environmental Ltd +1 more
- Contract value
- Not published
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 31 Aug 2027 · start not published
- Reference
ocds-h6vhtk-045686
- Ends · in 322 days
AT1329 Wandon Park Housing Development (FTS)
Luton Council · Local authority · Nationwide (UK), East of England
Incumbent: Boom Construction Limited
- Contract value
- Not published
- Annual run-rate
- —value not published
- Term
- Ends 31 Aug 2027 · start not published
- Reference
ocds-h6vhtk-04d719
- Ends · in 322 days
Beckenham Car Park Housing Scheme Main Contractor
London Borough of Bromley · Local authority · Greater London
Incumbent: Jerram Falkus Construction Ltd
- Contract value
- Not published
- Annual run-rate
- —value not published
- Term
- Ends 31 Aug 2027 · start not published
- Reference
ocds-h6vhtk-051cc8
- Ends · in 328 days
COV - Baginton Fields Expansion - Main contractor
Coventry City Council · Local authority · West Midlands
Incumbent: Jeakins Weir Limited
- Contract value
- £8.5m
- Annual run-rate
- £5.1mvalue ÷ published term
- Term
- 5 Jan 2026 → 6 Sept 2027 · 1.7 yrs
- Reference
ocds-h6vhtk-0513f7
How to read the radar
- End date is the contract period end the buyer published on the notice. Contracts without an end date are not on the radar.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend instead of retendering. Hide them to see contracts that must be re-procured.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term, only for a single supplier, a term of six months or more and a plain contract (not a framework or DPS ceiling).
- Counts are exact for the time-horizon and sector filters. With other filters, a result above 1,000 contracts shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.