Retender radar: UK public contracts ending soon

Every contract on Find a Tender with a published end date in the future, one row per contract (lot). A contract ending is a procurement starting — unless the buyer uses a published extension option, which the row shows. Frameworks and DPS are marked: what ends there is the vehicle, not one supplier’s contract.

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

A likely retender, not a certain one.

252 contracts end within 24 months, 424 in total · £1.5bn published GBP value, exc. VAT, in the next 12 months (framework ceilings included, not a spend forecast).

  1. Next 3 months26
  2. 3–6 months71
  3. 6–12 months48
  4. 12–24 months107

By sector, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

A likely retender, not a certain one.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each.

Contracts ending in the next 12 months

Showing 281–290

  1. Ends · in 157 days

    Minor Refurbishment of North Rona Lighthouse

    Northern Lighthouse Board · Central government · Scotland

    Incumbent: Trac HLM Ltd

    • Painting work
    • Works for complete or part construction and civil engineering work
    Contract value
    £125k
    Annual run-rate
    —term under 6 months
    Term
    30 Sept 2026 → 19 Mar 2027 · 5 months
    Reference
    ocds-h6vhtk-06b67f
  2. Ends · in 158 days

    181121 Elgin Town Hall Main Contractor

    Moray Council · Local authority · Scotland

    Incumbent: Taylor and Fraser

    • Construction work for buildings relating to artistic performances
    • Construction work for buildings relating to leisure, sports, culture, lodging and restaurants
    Contract value
    £15m
    Annual run-rate
    —start date not published
    Term
    Ends 20 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-04c31c
  3. Ends · in 159 days

    Lizard Bridge and boardwalk replacement

    NATURAL ENGLAND · Central government · South West England

    Incumbent: Naturally Green

    • Boardwalk construction work
    • Demolition, site preparation and clearance work
    • Footbridge construction work
    Contract value
    £40k
    Annual run-rate
    £76kvalue ÷ published term
    Term
    8 Sept 2026 → 21 Mar 2027 · 6 months
    Reference
    ocds-h6vhtk-06d8d6
  4. Ends · in 160 days

    NCC1109 Berwick Maltings Theatre Main Contractor

    Northumberland County Council · Local authority · North East England

    Incumbent: WILLMOTT DIXON LIMITED

    • Construction machinery and equipment
    • Construction structures and materials; auxiliary products to construction (except electric apparatus)
    • Construction work
    Contract value
    £884k
    Annual run-rate
    —start date not published
    Term
    Ends 22 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-04d698
  5. Ends · in 160 days

    Great Place to Work - Wall Vinyls

    South London and Maudsley NHS Foundation Trust · Central government · Greater London

    Incumbent: Ave Design Limited

    • Paper- or paperboard-based wall coverings
    • Pictures
    • Sign materials
    Contract value
    £120k
    Annual run-rate
    £112kvalue ÷ published term
    Term
    23 Feb 2026 → 22 Mar 2027 · 1 yrs
    Reference
    ocds-h6vhtk-060d79
  6. Ends · in 165 days

    Bromley Archive and Museum Store Retender

    London Borough of Bromley · Local authority · Greater London

    Incumbent: Longley Group Limited

    • Construction work
    Contract value
    £3.0m
    Annual run-rate
    £3.2mvalue ÷ published term
    Term
    16 Apr 2026 → 27 Mar 2027 · 11 months
    Reference
    ocds-h6vhtk-059e34
  7. Ends · in 165 days

    Emberton Country Park – Foul and surface water drainage repairs

    Milton Keynes City Council · Local authority · South East England

    Incumbent: Semilong Services Ltd

    • Drainage and surface works
    • Drainage works
    • Ground-drainage work
    Contract value
    £37kinc. VAT as published
    Annual run-rate
    £34kvalue ÷ published term
    Term
    23 Feb 2026 → 27 Mar 2027 · 1.1 yrs
    Reference
    ocds-h6vhtk-05ed56
  8. Ends · in 168 days

    Stage 1 - PCSA

    Maidstone Borough Council · Local authority · South East England

    Incumbent: Hill Partnerships Ltd

    • Construction work
    Contract value
    £2.2m
    Annual run-rate
    £2.2mvalue ÷ published term
    Term
    25 Mar 2026 → 30 Mar 2027 · 1 yrs
    Reference
    ocds-h6vhtk-056986
  9. Ends · in 168 daysExtension option · up to 30 Mar 2029

    DESIGN AND BUILD OF PARKLETS

    London Borough of Wandsworth · Local authority · Greater London

    Incumbent: Meristem Design Limited

    • Construction work
    Contract value
    £375k
    Annual run-rate
    £287kvalue ÷ published term
    Term
    9 Dec 2025 → 30 Mar 2027 · 1.3 yrs · up to 30 Mar 2029 with extensions
    Reference
    ocds-h6vhtk-0544d5
  10. Ends · in 168 days

    Carriageway Resurfacing 2026/27

    St Helens Council · Local authority · North West England

    Incumbent: J. HOPKINS (CONTRACTORS) LIMITED

    • Resurfacing works
    Contract value
    £125k
    Annual run-rate
    £125kvalue ÷ published term
    Term
    31 Mar 2026 → 30 Mar 2027 · 11 months
    Reference
    ocds-h6vhtk-05fef5
How to read the radar
  • End date is the contract period end the buyer published on Find a Tender. Contracts without an end date are not on the radar.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend instead of retendering. Hide them to see contracts that must be re-procured.
  • Incumbent is the canonical supplier on the award behind the contract. A panel (several suppliers on one award) is shown as a panel — no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term, only for a single supplier, a term of six months or more and a plain contract (not a framework or DPS ceiling).
  • Counts are exact from the nightly projection when you filter by horizon and sector only; any other filter shows a bounded total — exact up to 1,000 contracts, an honest “1,000+” floor above that.