Washwood Heath Depot and Network Integrated Control Centre
Ballast
Building construction work
Cable
+20 more
UK
Published value
Not published
Submission deadline Not published
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: High Speed Two (HS2) Ltd: "Washwood Heath Depot and Network Integrated Control Centre". Published status: complete. Published value: Value not published. 1 published lot. Submission deadline not published. See the official notice for participation instructions.
| Contracting Authority | High Speed Two (HS2) Ltd | Scope & Categories | Not published | Submission Window | complete No deadline published |
|---|---|---|---|---|---|
| Submission Gateway | Direct notice route | Legal Basis & Regime | Standard procurement | Estimated Value (exc. VAT) | Not published |
Bidder Intelligence · Authority Profile: High Speed Two (HS2) Ltd
Market Analytics
Derived from OCDS awards & bid statistics
Published history for High Speed Two (HS2) Ltd. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Competition Density
4.8Bids / Report
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate availablePayment Terms
Check noticePublished terms
Coverage: 4 active published awards; 4 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityHigh Speed Two (HS2) Ltd | Procedure methodNot published | Procurement categoryNot published |
Statuscomplete | Framework / DPSNot published | CompetitionNot published |
Above thresholdNot published | Legal basisNot published | Tender period startsNot published |
Clarification deadlineNot published | Electronic submissionNot published | Submission languagesNot published |
Published21 May 2026, 16:02 BST | Last source update21 May 2026, 16:02 BST | Recurring procurementNot published |
ClassificationBallast, Building construction work, Cable, wire and related products, Construction materials and associated items, Electrical machinery, apparatus, equipment and consumables; lighting, Engineering design services, Engineering works and construction works, Fences, Gravel, sand, crushed stone and aggregates, HVAC packages, Installation services of electrical and mechanical equipment, Landscaping work, Miscellaneous fabricated products and related items, Railway depot construction work, Railway equipment, Roof works and other special trade construction works, Structural products, Surveillance and security systems and devices | ||
Delivery area UK | ||
OCIDocds-h6vhtk-0293b4 | ||
What is being bought
The contract relates to the design, construction and dynamic testing of Washwood Heath Depot (WWH) & Network Integrated Control Centre (NICC) works for the HS2 project
What changed
From the official release history
- tender value changed
21 May 2026, 16:02 BST - Status changed to complete
21 May 2026, 16:02 BST - Official notice release published
21 May 2026, 16:02 BST - Submission deadline changed to published date
21 May 2026, 16:02 BST - Buyer information updated
21 May 2026, 16:02 BST - Published value updated to £275,000,000
16 Feb 2021, 22:56 GMT - Status changed to active
16 Feb 2021, 22:56 GMT - Official notice release published
16 Feb 2021, 22:56 GMT - Submission deadline changed to 31 Mar 2021, 12:00 BST
16 Feb 2021, 22:56 GMT - Buyer information updated
16 Feb 2021, 22:56 GMT
Lots and requirements (1)
Published by the contracting authority
- Lot 1 · #1Individual lot title not publishedcancelledPublished valueNot publishedThe WWH & NICC Contractor is responsible for the design, fabrication, assembly, supply, construction, installation, supervision, inspection, testing, system commissioning and safety authorisation of a rolling stock depot and the design, build and commissioning of a Network Integrated Control Centre at Washwood Heath in Birmingham (including maintenance of all the works up to their completion). Scope includes: - A maintenance building located within the depot - building foundations, substructure, superstructure, cladding, lighting, acoustics, heating, ventilation, drainage and power connections, utility connections, welfare and domestic provisions, building security and a building management system; - The maintenance building will contain light and heavy maintenance plant and equipment facilities (gantry cranes, monorail cranes, access gantries, access pits, inspection and maintenance roads, heavy cleaning facility, heavy lift and bogie drop facilities, depot offices, depot control centre, pantograph test facility, biohazard facility, building management system and workshop and storage areas etc). Depot infrastructure includes: - Reception/departure roads, track/permanent way, test track, switches & crossings, overhead catenary system, stabling/cleaning sidings, depot signalling system, depot protection system, telecoms system, automatic vehicle inspection units, wheel lathe(s), carriage wash machines, toilet emptying facilities, platforms, walkways, train crew booking facilities and a separate heavy cleaning facility; - Provision of non-traction High Voltage and Low Voltage power network for all plant, equipment and buildings and all Protection & Controls and Supervisory Control and Data Acquisition associated with the traction and non-traction switchgear. Provision of all mechanical and electrical systems throughout the depot and associated buildings. The NICC Infrastructure includes: - A Network Integrated Control Centre building located within the depot area, including building foundations, substructure, superstructure, cladding, lighting, acoustics, heating, ventilation, drainage and power connections, utility connections, operational and incident control rooms, training and IT systems room, offices, ancillary rooms, welfare and domestic provisions, building services, building security and a building management system; - Car parking facilities, gatehouse, site security and lighting within the depot area and the provision of site drainage and all utilities related to the depot and connections to the main utility networks; - Design integration with the other HS2 Ltd contractors (Rail Systems, Civils, Rolling Stock and the Depot Facility Owner (DFO)). The WWH & NICC Contractor will be the 'Principal Contractor' of the depot site and the NICC, responsible for construction integration.Contract periodNot publishedEligibilityNot publishedOptions / renewalNot published
Timeline
- Procedure published
21 May 2026, 16:02 BST - Award active
Not published · Not published - Contract active
Signed 30 Apr 2026, 00:00 BST · Not published
Commercial outcome and competition
Awards Joint Venture, Taylor Woodrow infrastructure Limited and Aureos Rail Limited Not published · Not published · active |
Contracts HS2 Railway Systems Washwood Heath Depot and Network Integrated Control Centre Not published · signed 30 Apr 2026, 00:00 BST · active |
Bid statistics bids: 3 (lot 1) electronicBids: 3 (lot 1) |
Buyer and organisations in this procedure
High Speed Two (HS2) Ltd
Contracting authority GB-FTS-33292Documents (0)
Official links; attachments are not copied
No linked documents are published
Related procedures (0)
No related procedures published