Scape Regional Construction Framework
Authority: Scape Procure Limited (trading as SCAPE) (Public body)·Consortium: 2 public authorities
What is being bought5 lots · detail below
Published requirement descriptionThe BBC uses social publishing to help inform, educate and entertain our audiences across BBC News, Sport, iPlayer, Sounds and a range of other areas. In total, the BBC has hundreds of social media accounts to promote services, engage and extend reach, and refer audiences to our services.
CPV: Architectural and related services · Architectural, construction, engineering and inspection services · Building and facilities management services · Building completion work · Building construction work · Building demolition and wrecking work and earthmoving work · Building installation work · Business services: law, marketing, consulting, recruitment, printing and security · Communication and multimedia software development services · Communication software development services · Construction work · Construction work for buildings relating to education and research · +49 more
How this framework works
From the published notice- Places
- up to 1 suppliers · 4 appointed (full)
Lots and requirements (5)Procurement structure
5 lots · no lot values publishedLot #1 UK
Lot #2South West £0 - £10m East of England
The description has not changed and is the same as in the original Contract Notice.
Lot #3South West £0 - £10m East of England
The description has not changed and is the same as in the original Contract Notice.
Lot #4South East £0 - £10m East of England
The description has not changed and is the same as in the original Contract Notice.
Lot #5South East £0 - £10m East of England
The description has not changed and is the same as in the original Contract Notice.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
- Suitability
Where there is more than one economic operator, the BBC reserves the right to require a grouping of economic operators to take a particular legal form or to require a single economic operator to take primary liability or to require that each party undertakes joint and several liability.
Please register your interest in this project by taking the following steps:
- Register your company on the BravoSolution e-Tendering portal (this is only required once):
1.1 Go to bbc.bravosolution.co.uk ↗
1.2 Click the link on the login page to register;
1.3 Accept the terms and conditions and click 'Continue';
1.4 Enter your correct business and user details;
1.5 Note the username you chose and click 'Save' when complete;
1.6 You will shortly receive an email with your temporary password.
- Express an interest in the tender:
2.1 Login to the portal with the username/password;
2.2 Click the 'PQQs Open to all Suppliers' link. (These are Pre-Qualification Questionnaires or Invitations to Tender open to any registered supplier).
2.3 Click on the relevant PQQ to access the content;
2.4 Click the 'Express Interest' button at the top of the page. This will move the PQQ into your 'My PQQs page. (This is a secure area reserved for your projects only;
2.5 You can now access any attachments by clicking 'Buyer Attachments' in the 'PQQ Details' box.
- Responding to the tender:
3.1 Click 'My Response' under PQQ Details', you can choose to 'Create Response' or to 'Decline to Respond' (please give…
- “Scape Regional Construction Framework” is a framework: the contest is a place on its panel, up to 1 suppliers, not a single contract.
Procedure terms & legal framework
From the official record · publisher note attached- Procedure method
- Competitive procedure with negotiation
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- No (one-off requirement)
- First published
- 8 Oct 2021, 22:44 BST
- Last source update
- 1 Aug 2025, 12:06 BST
- Authority reference
SCP008- FTS notice number
2025/S 000-045175- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-02ea2aFind a Tender
- Electronic trading
- e-invoicing allowed · electronic ordering · electronic payment
- Review procedure
In accordance with the instructions as detailed in the tender documentation.
Publisher note: To view this notice, please click here: https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=968637370 GO Reference: GO-202581-PRO-31669935
How it was run
Official notice- Appointment period ends
- 8 Nov 2021, 14:00 GMT
- Submission channel
- {"electronicSubmission","written"}
- Accepted languages
- en
- Bid validity
- 120 days from the deadline
Timeline
8 Nov 2021 → 1 Aug 2025 · 3 dates- Admission / appointment period endsperiod end, not a bid countdown8 Nov 2021, 14:00 GMT
- Invitations to tender expected17 Dec 2021
- Notice published1 Aug 2025, 12:06 BST
Notice history
1 event · 9 releases on Find a Tender- Buyer details updated31 Jul 2023, 12:05 BST
Routine re-releases (9)
- 2025-08: 1 release · 1 Aug 2025
- 2023-07: 4 releases · 31 Jul 2023, 31 Jul 2023
- 2021-10: 1 release · 8 Oct 2021
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast8 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.
Contracts
All 8 of these contracts carry the same published figure, £37,500,000, the framework's maximum for the whole notice, not each contract's own value. They are not eleven separate sums.
Lot 5 - South West £0 - £10m
- Signed
- 26 Aug 2022
- Value
- ceiling above
- Status
- active
- Change Due to unforeseen increase in inflation globally it has become apparent that proposed projects are more expensive than originally estimated and no longer align with Framework value bands. We therefore intend to vary the value bands increasing these using BCIS indices under the existing Regional Construction Framework through a Regulation 72(1)(c) Public Contracts Regulations 2015 permitted modification. The overall Framework value will not be altered, and no other changes will be made., Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee: No extra works are needed. A change of contractor will not ensure the Framework is delivered as awarded. Projects intended to fit within certain value bands no longer fit within these due to increased inflation. Modifying will allow projects to be allocated to value bands as originally intended at award. This is a permitted modification; the inflation increase was unforeseen; the Framework’s overall nature will not alter and the increase will not be 50% or more of the original Framework value.
Lot 7 - South East £0 - £10m
- Signed
- 26 Aug 2022
- Value
- ceiling above
- Status
- active
- Change Due to unforeseen increase in inflation globally it has become apparent that proposed projects are more expensive than originally estimated and no longer align with Framework value bands. We therefore intend to vary the value bands increasing these using BCIS indices under the existing Regional Construction Framework through a Regulation 72(1)(c) Public Contracts Regulations 2015 permitted modification. The overall Framework value will not be altered, and no other changes will be made., Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee: No extra works are needed. A change of contractor will not ensure the Framework is delivered as awarded. Projects intended to fit within certain value bands no longer fit within these due to increased inflation. Modifying will allow projects to be allocated to value bands as originally intended at award. This is a permitted modification; the inflation increase was unforeseen; the Framework’s overall nature will not alter and the increase will not be 50% or more of the original Framework value.
Lot 6 - South West £0 - £10m
- Signed
- 26 Aug 2022
- Value
- ceiling above
- Status
- active
- Change Due to unforeseen increase in inflation globally it has become apparent that proposed projects are more expensive than originally estimated and no longer align with Framework value bands. We therefore intend to vary the value bands increasing these using BCIS indices under the existing Regional Construction Framework through a Regulation 72(1)(c) Public Contracts Regulations 2015 permitted modification. The overall Framework value will not be altered, and no other changes will be made., Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee: No extra works are needed. A change of contractor will not ensure the Framework is delivered as awarded. Projects intended to fit within certain value bands no longer fit within these due to increased inflation. Modifying will allow projects to be allocated to value bands as originally intended at award. This is a permitted modification; the inflation increase was unforeseen; the Framework’s overall nature will not alter and the increase will not be 50% or more of the original Framework value.
Lot 8 - South East £0 - £10m
- Signed
- 26 Aug 2022
- Value
- ceiling above
- Status
- active
- Change Due to unforeseen increase in inflation globally it has become apparent that proposed projects are more expensive than originally estimated and no longer align with Framework value bands. We therefore intend to vary the value bands increasing these using BCIS indices under the existing Regional Construction Framework through a Regulation 72(1)(c) Public Contracts Regulations 2015 permitted modification. The overall Framework value will not be altered, and no other changes will be made., Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee: No extra works are needed. A change of contractor will not ensure the Framework is delivered as awarded. Projects intended to fit within certain value bands no longer fit within these due to increased inflation. Modifying will allow projects to be allocated to value bands as originally intended at award. This is a permitted modification; the inflation increase was unforeseen; the Framework’s overall nature will not alter and the increase will not be 50% or more of the original Framework value.
Lot 6 - South West £0 - £10m
- Signed
- 26 Aug 2022
- Value
- ceiling above
- Status
- active
- Change Scape Group will extend the Regional Construction Framework (Framework) for a period of 12 months and it will remain live and available for call-offs until 26/08/2027. During this extension period, Scape will be advertising and putting in place a replacement framework arrangement., Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee: The extension is a permitted modification under Regulation 72(1)(e) and Regulation 72 1(f) (an insubstantial change below 15% of the framework agreement) of the Public Contract Regulations 2015. The extension is considered insubstantial as the scope of works remains unchanged and there has been no increase to the value of the Framework. The estimated value of the overall Framework as stated in the original contract notice 2021/S 000-020003 remains unaltered. No additional amendments are made.
Lot 7 - South East £0 - £10m
- Signed
- 26 Aug 2022
- Value
- ceiling above
- Status
- active
- Change Scape Group will extend the Regional Construction Framework (Framework) for a period of 12 months and it will remain live and available for call-offs until 26/08/2027. During this extension period, Scape will be advertising and putting in place a replacement framework arrangement., Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee: The extension is a permitted modification under Regulation 72(1)(e) and Regulation 72 1(f) (an insubstantial change below 15% of the framework agreement) of the Public Contract Regulations 2015. The extension is considered insubstantial as the scope of works remains unchanged and there has been no increase to the value of the Framework. The estimated value of the overall Framework as stated in the original contract notice 2021/S 000-020003 remains unaltered. No additional amendments are made.
South East; Projects from 0 Up to a value of £10,000,000.
- Signed
- 26 Aug 2022
- Value
- ceiling above
- Status
- active
- Change Scape Group will extend the Regional Construction Framework (Framework) for a period of 12 months and it will remain live and available for call-offs until 26/08/2027. During this extension period, Scape will be advertising and putting in place a replacement framework arrangement., Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee: The extension is a permitted modification under Regulation 72(1)(e) and Regulation 72 1(f) (an insubstantial change below 15% of the framework agreement) of the Public Contract Regulations 2015. The extension is considered insubstantial as the scope of works remains unchanged and there has been no increase to the value of the Framework. The estimated value of the overall Framework as stated in the original contract notice 2021/S 000-020003 remains unaltered. No additional amendments are made.
South West; Projects from 0 Up to a value of £10,000,000.
- Signed
- 26 Aug 2022
- Value
- ceiling above
- Status
- active
- Change Scape Group will extend the Regional Construction Framework (Framework) for a period of 12 months and it will remain live and available for call-offs until 26/08/2027. During this extension period, Scape will be advertising and putting in place a replacement framework arrangement., Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee: The extension is a permitted modification under Regulation 72(1)(e) and Regulation 72 1(f) (an insubstantial change below 15% of the framework agreement) of the Public Contract Regulations 2015. The extension is considered insubstantial as the scope of works remains unchanged and there has been no increase to the value of the Framework. The estimated value of the overall Framework as stated in the original contract notice 2021/S 000-020003 remains unaltered. No additional amendments are made.
Contracting authority & participating public bodies
3 public bodies on the noticeConsortium members and other public bodies
- The British Broadcasting Corporation (BBC)Contracting authorityBody governed by public lawBroadcasting
- European UnionFunder
Dispute resolution & review bodies
- Business and Property Courts of Engalnd and Wales - TCCReview body
- Scape Group LtdReview body
- The High Court of England and WalesMediation body
Framework contractors & participating bidders
6 commercial parties on the notice- Ashe Construction LimitedFramework contractor
- Ashe Construction LimitedFramework contractor
- Clegg Construction LimitedFramework contractor
- Conamar Building Services LimitedFramework contractor
- R G Carter Cambridge LimitedFramework contractor
- R G Carter Cambridge LimitedFramework contractor
Official documents & specifications (2)
Official links; attachments are not copiedTender pack and attachments
- Economic and financial selection criteria
- Technical selection criteria