H3AT - Water Detritiation System
Building installation work
Engineering design services
Engineering studies
+28 more
Published value
£3,400,000
Submission deadline 10 Jan 2025, 12:00 GMT
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: United Kingdom Atomic Energy Authority: "H3AT - Water Detritiation System". Published status: active. Published value: £3,400,000. 1 published lot. Recorded submission deadline: 10 Jan 2025, 12:00 GMT. See the official notice for participation instructions.
| Contracting Authority | United Kingdom Atomic Energy Authority | Scope & Categories | Not published | Submission Window | Closed 10 Jan 2025, 12:00 GMT |
|---|---|---|---|---|---|
| Submission Gateway | Direct notice route | Legal Basis & Regime | Standard procurement | Estimated Value (exc. VAT) | £3,400,000 |
Bidder Intelligence · Authority Profile: United Kingdom Atomic Energy Authority
Market Analytics
Derived from OCDS awards & bid statistics
Published history for United Kingdom Atomic Energy Authority. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Average Price Reduction
Not availableInsufficient comparable data
Competition Density
4Bids / Report
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate availablePayment Terms
Check noticePublished terms
Coverage: 53 active published awards; 45 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Price reduction compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityUnited Kingdom Atomic Energy Authority | Procedure methodNot published | Procurement categoryNot published |
Statusactive | Framework / DPSNot published | CompetitionNot published |
Above thresholdNot published | Legal basisNot published | Tender period startsNot published |
Clarification deadlineNot published | Electronic submissionNot published | Submission languagesNot published |
Published11 Dec 2024, 16:46 GMT | Last source update11 Dec 2024, 16:46 GMT | Recurring procurementNo |
ClassificationBuilding installation work, Engineering design services, Engineering studies, Engineering-related scientific and technical services, Fabrication work, Humidity and moisture measuring instruments, Installation services of electrical and mechanical equipment, Installation services of electrical equipment, Installation services of mechanical equipment, Installation services of reservoirs, Installation services of tanks, Instruments for measuring flow, level and pressure of liquids and gases, Instruments for measuring quantities, Measuring and control equipment, Metalworking, Plant engineering design services, Pressure-reducing, control, check or safety valves, Primary water systems, Project and design preparation, estimation of costs, Pumps and compressors, Pumps for liquids, Radioactive materials, Regulating and controlling instruments and apparatus, Steam, hot water and associated products, Valves defined by function, Welding | ||
Delivery area | ||
OCIDocds-h6vhtk-04c74e | ||
What is being bought
The Supply of a WDS equipment package to be supplied at UKAEA’s Culham Campus. The scope of work is expected to be delivered, installed, and commissioned within an estimated duration of 36 months. The scope of the Assemblies includes final process, mechanical and EC&I design, procurement, fabrication, assembly, Factory Acceptance Testing, delivery, and installation at the Culham site, plus Site Acceptance Testing and Integrated Testing. Design – A process design has been produced for the Water Detritiation System and the proposed equipment has been separated into 10 Assemblies as manageable deliverables. The 10 Assemblies consist of process equipment mostly installed within gloveboxes, and one air extracted cabinet. Manufacturing, FAT, Delivery, Installation, SAT, Integrated Testing & Commissioning - The 10 Assemblies require manufacture, assembly within containments and installation.
What changed
From the official release history
- Published value updated to £3,400,000
11 Dec 2024, 16:46 GMT - Status changed to active
11 Dec 2024, 16:46 GMT - Official notice release published
11 Dec 2024, 16:46 GMT - Submission deadline changed to 10 Jan 2025, 12:00 GMT
11 Dec 2024, 16:46 GMT - Buyer information updated
11 Dec 2024, 16:46 GMT
Lots and requirements (1)
Published by the contracting authority
- Lot 1 · #1Individual lot title not publishedactivePublished value£3,400,000The Supply of a WDS equipment package to be supplied into the Hydrogen-3 Advanced Technology Facility at UKAEA’s Culham Campus. The scope of work is expected to be delivered, installed, and commissioned within an estimated duration of 36 months. The scope of the Assemblies includes final process, mechanical and EC&I design, procurement, fabrication, assembly, Factory Acceptance Testing, delivery, and installation at the Culham site, plus Site Acceptance Testing and Integrated Testing. Design – A process design has been produced for the Water Detritiation System and the proposed equipment has been separated into 10 Assemblies as manageable deliverables. The 10 Assemblies consist of process equipment mostly installed within gloveboxes, and one air extracted cabinet. Manufacturing, FAT, Delivery, Installation, SAT, Integrated Testing & Commissioning - The 10 Assemblies require manufacture, assembly within containments and installation. This includes (but not limited to): installation of the equipment; agreeing and identifying tie-points for process service and electrical distribution interfaces; agreeing and identifying other process interfaces. The Contractor must undertake Factory Acceptance Testing. The commissioning of the fully integrated subsystems shall be carried out by the UKAEA Operations team with support from the Systems Integrator and The Contractor. During inactive commissioning all operations will be tested, and the plant performance assessed under a wide range of expected operating conditions. The Contractor shall provide, People Rates for assisting with commissioning.Contract periodNot publishedEligibilityNot publishedOptions / renewalNot published
Timeline
- Procedure published
11 Dec 2024, 16:46 GMT - Submission deadline
10 Jan 2025, 12:00 GMT
Commercial outcome and competition
AwardsNo award published |
ContractsNo contract published |
Bid statisticsNo aggregate bid statistics published |
Buyer and organisations in this procedure
United Kingdom Atomic Energy Authority
Contracting authority GB-FTS-102343Documents (0)