Official UK procurement notice
Disabled Facilities Grants Building and Associated Works
Authority: Walsall Metropolitan Borough Council (Local council)
What is being bought3 lots · detail below
Published requirement descriptionThe Council wishes to procure a Contractor to provide a comprehensive Building Works Adaption Service, Handyperson Service and Repair, Refurbishment and Improvement to both occupied and unoccupied properties. Orders will be issued on an ad-hoc basis and payments will be made on completion of the works following sign off from the Councils Contract Administration Officer.It is the Council’s intention to divide these requirements into 3 (three) Lots as follows:Lot 1: Building works associated with Disabled Facility Grants and similar adaptationsLot 2: Handyperson serviceLot 3: Building works including but not limited to repair, refurbishment and improvements to housing (including empty homes) and other council stock
CPV: Access ramps · Bathrooms construction work · Building and facilities management services · Building extension work · Electrical fitting work · Electrical installation work · Electrical installation work of heating and other electrical building-equipment · Electrical services · Electrical wiring and fitting work · Electrical wiring work · Electrical-system repair services · Emergency lighting equipment · +35 more
How this framework works
From the published notice- Places
- up to 11 suppliers · 10 bids received (0.9 per place) · 8 appointed
- Framework period
- 3 yrs 11 mo from 1 May 2022, n/a
Lots and requirements (3)Procurement structure
3 lots · all with a published value · a supplier may bid for at most 3 and win at most 3 of them · same evaluation weights on every lotLot #1Building works associated with Disabled Facility Grants and similar adaptationsCancelledPublished value£6,400,000
Building works associated with Disabled Facility Grants and similar adaptations
Lot #2HandypersonCancelledPublished value£40,000
Lot #3Building works including but not limited to repair, refurbishment and improvements to housing (including empty homes) and other council stockCancelledPublished value£1,600,000
Building works including but not limited to repair, refurbishment and improvements to housing (including empty homes) and other council stock
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published sub-criteria (2)
- Non-Price Criteria: 70%
- price: 30%
Published award criteria (2)
- Non-Price Criteria: 70
- Price: 30
- Price carries 30 of 100 points: a 10% discount moves about 3 points. The method statement decides this lot, not the discount.
- “Disabled Facilities Grants Building and Associated Works” is a framework: the contest is a place on its panel, up to 11 suppliers, not a single contract.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record · publisher note attached- Procedure method
- Open procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- Yes
- First published
- 25 Jan 2022, 17:02 GMT
- Last source update
- 26 May 2022, 16:27 BST
- Award evaluation window
- 28 Feb 2022 – …
- Authority reference
WP3646- FTS notice number
2022/S 000-014792- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-030f47Find a Tender
- Review procedure
The Council will incorporate a standstill period at the point when information on the proposed award of the contract is communicated to tenderers. The standstill period, which will be for a minimum of ten calendar days, provides time for unsuccessful tenderers to challenge the award decision before the contract is entered into. Aggrieved parties who have been harmed or are at risk of harm by any breach of the Council’s obligations may take action in the High Court (England, Wales and Northern Ireland).
Publisher note: Interest in this contract process should be expressed via the Council’s e-Tendering Portal – https://in-tendhost.co.uk/walsallcouncilThe Council reserves the right to cancel the procurement and not to proceed with the contract. The Council also reserves the right not to award a contract or to award a contract for parts or part of the services only.The Council will not, under any circumstances, reimburse any expense incurred by bidders in preparing their SSQ or tender submissions.The Council notes that the award of the contract may involve a transfer of employment undertakings pursuant to the Transfer of Undertakings (Protection of Employment) Regulations 2006, and will clarify the position with the applicants during the tender process.This is a voluntary contract notice.Under this procurement the contractor is required to actively participate in the economic and social regeneration of the locality of and surrounding the place of delivery for the procurement. Accordingly contract performance conditions may relate in particular to social and environmental considerations.
How it was run
Official notice- Appointment period ends
- 25 Feb 2022, 12:00 GMT
- Submission channel
- {"written"}
- Accepted languages
- en
- Bids opened
- 28 Feb 2022, 12:00 GMT
Timeline
25 Feb 2022 → 26 May 2022 · 4 dates- Admission / appointment period endsperiod end, not a bid countdown25 Feb 2022, 12:00 GMT
- Bids opened28 Feb 2022, 12:00 GMT
- Contract starts1 May 2022, 00:00 BST
- Notice published26 May 2022, 16:27 BST
Notice history
1 event · 2 releases on Find a Tender- Status changed to complete26 May 2022, 16:27 BST
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast3 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.
Contracts
Disabled Facilities Grants Building and Associated Works
- Signed
- 11 May 2022
- Value
- £6,400,000
- Status
- active
Disabled Facilities Grants Building and Associated Works
- Signed
- 11 May 2022
- Value
- £40,000
- Status
- active
Disabled Facilities Grants Building and Associated Works
- Signed
- 11 May 2022
- Value
- £1,600,000
- Status
- active
Bid statistics published by the authority
| Bids | SME | VCSE | Valid bid range |
|---|---|---|---|
| 10bids · 10 electronic · 10 from abroad | 9 | — | — |
Contracting authority & participating public bodies
Framework contractors & participating bidders
10 commercial parties on the notice- Dolphin Lifts Midlands LtdFramework contractor
- Dolphin Lifts Midlands LtdFramework contractor
- Eden Adaptions LtdFramework contractor
- Extreme Roofing and Maintenance LtdFramework contractor
- Hardyman Group LtdFramework contractor
- Hardyman and Co LimitedFramework contractor
- Hindley Contractors LtdFramework contractor
- SRC Midlands LTDFramework contractor
- SRC Midlands LtdFramework contractor
- Starrant LtdFramework contractor
Official documents & specifications (2)
Official links; attachments are not copiedTender pack and attachments
- Economic and financial selection criteria
- Technical selection criteria