Find a Tender
planning
Official procurement procedure
Design and Supply of Fibre Reinforced Polymer (FRP) Bridges and Decking Systems
Construction work for bridges
Published value
£0
Submission deadline Not published
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: Forestry Commission: "Design and Supply of Fibre Reinforced Polymer (FRP) Bridges and Decking Systems". Published status: planning. Published value: £0. 1 published lot. Submission deadline not published. See the official notice for participation instructions.
| Contracting Authority | Forestry Commission | Scope & Categories | Not published | Submission Window | planning No deadline published |
|---|---|---|---|---|---|
| Submission Gateway | Direct notice route | Legal Basis & Regime | Standard procurement | Estimated Value (exc. VAT) | £0 |
Bidder Intelligence · Authority Profile: Forestry Commission
Market Analytics
Derived from OCDS awards & bid statistics
Published history for Forestry Commission. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Competition Density
6.2Bids / Report
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate availablePayment Terms
Check noticePublished terms
Coverage: 142 active published awards; 39 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityForestry Commission | Procedure methodNot published | Procurement categoryNot published |
Statusplanning | Framework / DPSFramework | CompetitionNot published |
Above thresholdNot published | Legal basisNot published | Tender period startsNot published |
Clarification deadlineNot published | Electronic submissionNot published | Submission languagesNot published |
Published30 Sept 2025, 12:12 BST | Last source update30 Sept 2025, 12:12 BST | Recurring procurementNot published |
ClassificationConstruction work for bridges | ||
OCIDocds-h6vhtk-05a4cb | ||
What is being bought
Design and supply of Fibre Reinforced Polymer (FRP) Bridges - Roadbridges suitable for 44Tonnes Highways Loading plus supply and design of footbridges, cycleways, bridleways and bridge decking solutions suitable for highways loading (up to 44 Tonnes).
The manufacturing process should use the resin infusion technique with a mould. This allows arrangement of fibres at different orientations to ensure maximum performance and if required fibre and resin types can be altered to suit a particular application. Foam core should also be used between the top mat and bottom mat for structural efficiency.
Ideally constructed using a proven monolithic FRP system (e.g. InfraCore or equivalent) with vacuum infusion method. This type of construction has a low maintenance requirement and subsequently features a long design life.
Elements of the bridge structures will have an expected design life of:
- Deck - 100+ years
- Surfacing 10+ years
- Parapets 30+ years
- UV protection 60+ years
Also be able to design such bridges and provide outline proposals and detailed costings. Most structures we require will need bespoke designs.
Typical projects expected to range between £50k–£250k per bridge, depending on size and specification
Be able to manufacture and supply a bridge within a short timeframe up to 3 months.
What changed
From the official release history
- tender value changed
30 Sept 2025, 12:12 BST - Status changed to planning
30 Sept 2025, 12:12 BST - Official notice release published
30 Sept 2025, 12:12 BST - Buyer information updated
30 Sept 2025, 12:12 BST
Lots and requirements (1)
Published by the contracting authority
- Lot 1 · #1Individual lot title not publishedplanningPublished valueNot publishedThe source published no individual title or description for this lot.Contract periodNot publishedEligibilityNot publishedOptions / renewalNot published
Timeline
- Pipeline notice
30 Sept 2025, 12:12 BST - Procedure published
30 Sept 2025, 12:12 BST - engagement
15 Oct 2025, 00:59 BST · scheduledWe are looking for suppliers that have the expertise to design, manufacture and supply FRP bridges. Due to site constraints the bridge deck must be of light weight construction to enable its installation without the use of cranes. Suppliers should express interest by emailing Claire Hodges at commercial.services@forestryengland.uk Interested suppliers are invited to provide information on their capability, relevant experience, and indicative lead times.
Commercial outcome and competition
AwardsNo award published |
ContractsNo contract published |
Bid statisticsNo aggregate bid statistics published |
Buyer and organisations in this procedure
Forestry Commission
Contracting authority GB-PPON-PLRM-7846-HGLGDocuments (1)
Official links; attachments are not copied
- 30 Sept 2025, 12:12 BST
Related procedures (0)
No related procedures published
Planning and rationale
Planning budgetNot published |
No-engagement rationaleNot published |
Procedure rationaleNot published |