Expiring UK Public Contracts: Retender Radar
Explore UK public contracts by expiry date, with buyers, incumbent suppliers and extension options. Estimated end dates are labelled; expiry does not guarantee a new tender.
Contracts ending in the next 12 months
Showing 1,156–1,170
- Ends · in 135 days
Retail shop refit - Tintern Abbey and Raglan Castle
Llywodraeth Cymru / Welsh Government · Central government · Wales (Cymru)
Incumbent: ARJ CRE8 Ltd
This notice confirms the award of a contract following a competitive quotation exercise for the design, supply and installation of retail shop refurbishment works at Cadw’s Raglan Castle and Tintern Abbey gift shops. The contract includes t…
- Published value
- £182k
- Annual run-rate
- —term under 6 months
- Term
- 12 Oct 2026 → 12 Mar 2027 · 5 months
- Reference
ocds-h6vhtk-078631
- Ends · in 135 days
CBC-2091-Q-SM New replacement "Exit Doors"
Central Bedfordshire Council · Local authority
Incumbent: RID Ltd
Central Bedfordshire Council has awarded a contract for the supply and installation of new exit doors across two Council sites. Works will be undertaken on an as-and-when-required basis during the contract term and will include site surveys…
- Published value
- £60k
- Annual run-rate
- —not computed
- Term
- 14 Sept 2026 → 12 Mar 2027 · 6 months
- Reference
ocds-h6vhtk-06f7f3
- Ends · in 136 days
Infrastructure Development Agreement Faverdale/Burtree Garden Village
Darlington Borough Council · Local authority · North East England
Incumbent: Homes England
Infrastructure Development Agreement Faverdale/Burtree Garden Village
- Published value
- £1.4m
- Annual run-rate
- £725kpublished value ÷ term, exc. VAT
- Term
- 14 Mar 2025 → 13 Mar 2027 · 2 yrs
- Reference
ocds-h6vhtk-0682a8
- Ends · in 136 daysExtension option · up to 13 Mar 2028
Monmouth Shire Hall - EFO - H26-0201
Monmouthshire County Council · Local authority · Wales (Cymru)
Incumbent: The Hub Build Limited · Last contest: awarded 20% over the estimate
The Monmouth Shire Hall Exhibition Works project aims to deliver an engaging, interactive visitor experience through a series of interpretive exhibits. This initiative is part of a broader heritage interpretation strategy led by Monmouthshi…
- Published value
- £745k
- Annual run-rate
- £743kpublished value ÷ term, exc. VAT
- Term
- 13 Mar 2026 → 13 Mar 2027 · 1 yr · up to 13 Mar 2028 with extensions
- Reference
ocds-h6vhtk-05eff1
- Estimated end · in 137 days
Water System Risk Assessments & Water Hygiene Monitoring
City of Bradford Metropolitan District Council · Local authority · Yorkshire and the Humber
Incumbent: Aquatrust Water and Ventilation Ltd · Last contest: 6 bids
The Council was seeking tenders from suitably qualified Water Hygiene contractors to provide the prevention, risk management and control of Legionella bacteria in water systems. This requires the undertaking of a monitoring programme of all…
- Published value
- £900k
- Annual run-rate
- —start date not published
- Term
- Estimated end 14 Mar 2027 · start not published
- Reference
ocds-h6vhtk-0416b4
- Estimated end · in 137 days
BSH/HRA Barton Hill Major Refurbishment
Bristol City Council · Local authority · South West England
Incumbent: SERS Energy Solutions Limited · Last contest: 3 bids
Barton Hill Major Refurbishment
- Published value
- £18m
- Annual run-rate
- —start date not published
- Term
- Estimated end 14 Mar 2027 · start not published
- Reference
ocds-h6vhtk-03a177
- Ends · in 137 days
Doncaster Future Parks, Grove Gardens
City of Doncaster Council · Local authority · Yorkshire and the Humber
Incumbent: BRAMBLEDOWN LANDSCAPES · Last contest: awarded 19% over the estimate
Delivery of the planned improvements to Grove Gardens green space in Doncaster as set out in this document and associated annexes.
- Published value
- £190k
- Annual run-rate
- £190kpublished value ÷ term, exc. VAT
- Term
- 15 Mar 2026 → 14 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-060218
- Estimated end · in 138 days
ANDBC Pre-Qualification Questionnaire - Works Contract for Redevelopment of Ward Park, Bangor
Ards and North Down Borough Council · Local authority · Northern Ireland
Incumbent: John McQuillan Contracts Ltd · Last contest: 5 bids (4 SME) · awarded 48% under the estimate
Ward Park is an existing park situated off Castle Street, Bangor. It is owned and managed by Ards and North Down Borough Council. The project is for the provision of restoration and improvement works to the Park. The Park will be updated to…
- Published value
- £2.3m
- Annual run-rate
- —start date not published
- Term
- Estimated end 15 Mar 2027 · start not published
- Reference
ocds-h6vhtk-04b08a
- Ends · in 138 days
GSMD Cyclical Works 2026 - 2027
The Mayor and Commonalty and Citizens of the City of London · Local authority · Greater London
Incumbent: Team Project Ltd
The City of London Corporation (the City) invited Tenders for a single‑supplier framework for the provision of a principal contractor to deliver years 2 - 5 of the five‑year cyclical works programme (CWP) for the Guildhall School of Music …
- Published value
- £2.1m
- Annual run-rate
- £3.6mpublished value ÷ term, exc. VAT
- Term
- 18 Aug 2026 → 15 Mar 2027 · 7 months
- Reference
ocds-h6vhtk-06ed76
- Ends · in 138 daysExtension option
Design and Build Works for Mains Sewer Connection at High Lodge
Forestry Commission · Other public body · East of England
Incumbent: ARTHUR CIVIL ENGINEERING LIMITED · Last contest: awarded 7% over the estimate
Connection of High Lodge Forest Centre to the mains sewer, approximately 2.4 km from the current discharge point. A Section 106 agreement with Anglian Water is already in place, and a preferred route for the connection has been identified.
- Published value
- £1.1m
- Annual run-rate
- —not computed
- Term
- 16 Sept 2026 → 15 Mar 2027 · 6 months
- Reference
ocds-h6vhtk-0661b3
- Ends · in 138 days
Specialist Ventilation Installation and Modification Works
West Suffolk NHS Foundation Trust · Central government
Incumbent: DPL Group Ltd
Provision of specialist ventilation works within Theatre 7 and Theatre 9, including the modification, installation, testing and commissioning of ventilation and associated mechanical building services systems. The works support the Trust in…
- Published value
- £350k
- Annual run-rate
- £351kpublished value ÷ term, exc. VAT
- Term
- 16 Mar 2026 → 15 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-06dd79
- Ends · in 138 days
MFF167 2025-2028 Moorland Restoration Ground Works Package 4 Westend Head Swains Greave Planting Works
Peak District National Park Authority · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands
Incumbent: UPLAND ENVIRONMENTAL LTD
1.The objective of this Contract is to deliver a suite of Moorland Restoration Works on 2 areas in the Upper Derwent Valley in the Peak District National Park. The sites are split into 6 packages of Works. The aim of the Works suites are to…
- Published value
- £113k
- Annual run-rate
- £136kpublished value ÷ term, exc. VAT
- Term
- 18 May 2026 → 15 Mar 2027 · 10 months
- Reference
ocds-h6vhtk-05594f
- Ends · in 138 days
Lot 1
Peak District National Park Authority · Other public body · Yorkshire and the Humber
Incumbent: N66 LTD
- Published value
- £70k
- Annual run-rate
- £67kpublished value ÷ term, exc. VAT
- Term
- 3 Mar 2026 → 15 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-05ea49
- Ends · in 138 days
Bathroom Look Repair
North East London NHS Foundation Trust · Central government · Nationwide (UK)
Incumbent: Mosaic Property Management Ltd
PO to rectify leak issues in female changing room - remove and replace flooring/insulation and hygiene boards in the female changing rooms
- Published value
- £17k
- Annual run-rate
- £17kpublished value ÷ term, exc. VAT
- Term
- 16 Mar 2026 → 15 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-066fcd
- Ends · in 140 daysExtension option
Ironworks Roof Project
Victoria and Albert Museum · Central government · Greater London
Incumbent: Coniston Limited
Roof refurbishment works at V&A South Kensington. Scope comprises the strip-out and disposal of existing water damaged insulation and asphalt roof covering and replacement to the Ironworks Roof area with new, alongside structural investigat…
- Published value
- £1.6m
- Annual run-rate
- —term under 6 months
- Term
- 7 Oct 2026 → 17 Mar 2027 · 5 months
- Reference
ocds-h6vhtk-0786de
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,848 contracts and agreements end within 24 months, 4,753 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,66945Construction work2,10872IT services: consulting, software, internet1,62760Transport services (except waste transport)1,54071Architectural, construction, engineering1,42150Repair and maintenance services1,40880Education and training services1,260
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.