Retender radar: UK public contracts ending soon

Every contract in the catalogue with a published end date in the future, one row per contract (lot). A contract ending is a procurement starting, unless the buyer uses a published extension option, which the row shows. Frameworks and DPS are marked: what ends there is the vehicle, not one supplier’s contract.

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

A likely retender, not a certain one.

252 contracts end within 24 months, 424 in total · £1.5bn published GBP value, exc. VAT, in the next 12 months (framework ceilings included, not a spend forecast).

  1. Next 3 months26
  2. 3–6 months71
  3. 6–12 months48
  4. 12–24 months107

By sector, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

A likely retender, not a certain one.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each.

Contracts ending in the next 12 months

Showing 681–690

  1. Ends · in 321 daysFramework re-letPanel · 2 suppliers

    Lot 2 - Supply and Installation of Electrically Powered Blinds

    ESPO · Nationwide (UK)

    Panel: Custom Group Limited, Wattrus Group Limited

    • Blinds
    • Curtain rails
    • Curtain rails and hangings
    Contract value
    £750kceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-045802
  2. Ends · in 321 daysFramework re-let

    Lot 3 - Supply and Installation of Theatre and Drama Room Equipment

    ESPO · Nationwide (UK)

    Incumbent: Custom Group Limited

    • Blinds
    • Curtain rails
    • Curtain rails and hangings
    Contract value
    £750kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    Ends 31 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-045802
  3. Ends · in 321 daysFramework re-let

    Lot 4 - Supply and Installation of Security Shutters and Grilles

    ESPO · Nationwide (UK)

    Incumbent: Custom Group Limited

    • Blinds
    • Curtain rails
    • Curtain rails and hangings
    Contract value
    £750kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    Ends 31 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-045802
  4. Ends · in 321 days

    HAR6108 Wood Wharf School

    Tower Hamlets · Other public body · Greater London

    Incumbent: Alpine Works Limited

    • Construction work for school buildings
    Contract value
    £736k
    Annual run-rate
    £565kvalue ÷ published term
    Term
    13 May 2026 → 31 Aug 2027 · 1.3 yrs
    Reference
    ocds-h6vhtk-065a8b
  5. Ends · in 321 days

    The Willows School Full Heating and Distribution Upgrade

    Milton Keynes City Council · Local authority · South East England

    Incumbent: SDG Electrical & Mechanical Engineering Ltd

    • Central-heating boilers
    • Central-heating equipment
    • Central-heating installation work
    Contract value
    £363k
    Annual run-rate
    £276kvalue ÷ published term
    Term
    8 May 2026 → 31 Aug 2027 · 1.3 yrs
    Reference
    ocds-h6vhtk-06567d
  6. Ends · in 321 daysExtension option · up to 31 Aug 2029

    Play Areas Repairs & Maintenance Works

    Wychavon District Council · Local authority · West Midlands

    Incumbent: Continental Landscapes Limited

    • Flatwork for children's play area
    • Repair and maintenance services of playground equipment
    Contract value
    £295k
    Annual run-rate
    £148kvalue ÷ published term
    Term
    1 Sept 2025 → 31 Aug 2027 · 1.9 yrs · up to 31 Aug 2029 with extensions
    Reference
    ocds-h6vhtk-0526d3
  7. Ends · in 321 daysFramework re-letPanel · 6 suppliers

    Asbestos Removal Services

    Cambridgeshire County Council · Local authority · East of England

    Panel: AA Woods, ASPECT CONTRACTS LIMITED, Asbestech Ltd +3 more

    • Asbestos removal services
    • Demolition, site preparation and clearance work
    Contract value
    Not published
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-045686
  8. Ends · in 321 daysFramework re-letPanel · 4 suppliers

    Demolition Services

    Cambridgeshire County Council · Local authority · East of England

    Panel: CAWARDEN CO. LIMITED, DSM Demolition, Jackson Environmental Ltd +1 more

    • Asbestos removal services
    • Demolition, site preparation and clearance work
    Contract value
    Not published
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-045686
  9. Ends · in 321 days

    AT1329 Wandon Park Housing Development (FTS)

    Luton Council · Local authority · Nationwide (UK), East of England

    Incumbent: Boom Construction Limited

    • Construction work
    Contract value
    Not published
    Annual run-rate
    —value not published
    Term
    Ends 31 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-04d719
  10. Ends · in 321 days

    Beckenham Car Park Housing Scheme Main Contractor

    London Borough of Bromley · Local authority · Greater London

    Incumbent: Jerram Falkus Construction Ltd

    • Construction work
    Contract value
    Not published
    Annual run-rate
    —value not published
    Term
    Ends 31 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-051cc8
How to read the radar
  • End date is the contract period end the buyer published on the notice. Contracts without an end date are not on the radar.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend instead of retendering. Hide them to see contracts that must be re-procured.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term, only for a single supplier, a term of six months or more and a plain contract (not a framework or DPS ceiling).
  • Counts are exact for the time-horizon and sector filters. With other filters, a result above 1,000 contracts shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.