Retender radar: UK public contracts ending soon

Every contract in the catalogue with a published end date in the future, one row per contract (lot). A contract ending is a procurement starting, unless the buyer uses a published extension option, which the row shows. Frameworks and DPS are marked: what ends there is the vehicle, not one supplier’s contract.

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

A likely retender, not a certain one.

252 contracts end within 24 months, 424 in total · £1.5bn published GBP value, exc. VAT, in the next 12 months (framework ceilings included, not a spend forecast).

  1. Next 3 months26
  2. 3–6 months71
  3. 6–12 months48
  4. 12–24 months107

By sector, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

A likely retender, not a certain one.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each.

Contracts ending in the next 12 months

Showing 461–470

  1. Ends · in 169 days

    CLIPSTONE HOLDINGS REDEVELOPMENT - REVISED

    Newark And Sherwood District Council · Local authority · East Midlands

    Incumbent: Torsion Construction Ltd

    • Construction work for commercial buildings
    Contract value
    Not published
    Annual run-rate
    —value not published
    Term
    Ends 31 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-0561d7
  2. Ends · in 170 days

    Domestic Safe Electrical 2023-2027

    Clackmannanshire Council · Local authority · Scotland

    Incumbent: AC Gold Electrical Services Ltd

    • Electrical installation work
    Contract value
    £6.0m
    Annual run-rate
    —start date not published
    Term
    Ends 1 Apr 2027 · start not published
    Reference
    ocds-h6vhtk-0385ff
  3. Ends · in 170 days

    009106 - Discovery Museum Roof Replacement

    Newcastle City Council · Local authority · North East England

    Incumbent: John Flowers Ltd

    • Construction work
    Contract value
    £3.3m
    Annual run-rate
    £3.2mvalue ÷ published term
    Term
    20 Mar 2026 → 1 Apr 2027 · 1 yrs
    Reference
    ocds-h6vhtk-054359
  4. Ends · in 170 days

    Supply and Installation of Door Entry Fob Readers and Fobs

    Curo Places Limited · Other public body · South West England

    Incumbent: Guardian Security (South West) Ltd

    • Electrical installation work
    Contract value
    £217kinc. VAT as published
    Annual run-rate
    £216kvalue ÷ published term
    Term
    1 Apr 2026 → 1 Apr 2027 · 1 yrs
    Reference
    ocds-h6vhtk-0562fa
  5. Ends · in 170 days

    M5 Junction 10 Improvements Scheme

    Gloucestershire County Council- · Local authority · South West England

    Incumbent: Galliford Try Construction Limited

    • Construction work
    • Construction work for buildings relating to education and research
    • Construction work for buildings relating to health and social services, for crematoriums and public conveniences
    Contract value
    Not published
    Annual run-rate
    —value not published
    Term
    Ends 1 Apr 2027 · start not published
    Reference
    ocds-h6vhtk-0348d9
  6. Ends · in 170 days

    Doris Robinson Court - Appointment of a Principal Contractor

    Stoke on Trent City Council · Local authority · West Midlands

    Incumbent: Torsion Construction Ltd

    • Works for complete or part construction and civil engineering work
    Contract value
    Not published
    Annual run-rate
    —value not published
    Term
    Ends 1 Apr 2027 · start not published
    Reference
    ocds-h6vhtk-04e7a5
  7. Ends · in 171 daysFramework re-let

    PLACE166 - Surface Dressing

    Derbyshire County Council · Local authority · East Midlands

    Incumbent: Hazell & Jefferies Ltd

    • Surface work for roads
    Contract value
    £6.0mceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    Ends 2 Apr 2027 · start not published
    Reference
    ocds-h6vhtk-039658
  8. Ends · in 171 days

    SCC - Design and Construction of 3 New Houses to Passivhaus / Future Homes Standard Principles

    Southend-on-Sea City Council · Local authority · East of England

    Incumbent: A.W. HARDY & CO. LIMITED

    • Construction work for multi-dwelling buildings and individual houses
    Contract value
    £1.1m
    Annual run-rate
    £1.2mvalue ÷ published term
    Term
    4 May 2026 → 2 Apr 2027 · 10 months
    Reference
    ocds-h6vhtk-05ea8f
  9. Ends · in 171 days

    Contract for Groundworks at Townhill, Swansea

    City & County of Swansea · Local authority · Wales (Cymru)

    Incumbent: CAMBRENSIS CIVIL ENGINEERING LIMITED

    • Excavating and earthmoving work
    Contract value
    £88k
    Annual run-rate
    £108kvalue ÷ published term
    Term
    8 Jun 2026 → 2 Apr 2027 · 9 months
    Reference
    ocds-h6vhtk-061319
  10. Ends · in 174 daysExtension option · up to 5 Apr 2030Panel · 2 suppliers

    Supply of Owner Operated Vacuum Excavator

    Derbyshire County Council · Local authority · East Midlands

    Panel: Joule Brady Limited, NEWLINE FENCING LTD

    • Construction machinery and equipment
    • Earthmoving and excavating machinery, and associated parts
    • Hire of construction and civil engineering machinery and equipment with operator
    Contract value
    £648kinc. VAT as published
    Annual run-rate
    —panel, not one supplier
    Term
    6 Apr 2026 → 5 Apr 2027 · 11 months · up to 5 Apr 2030 with extensions
    Reference
    ocds-h6vhtk-05ffbd
How to read the radar
  • End date is the contract period end the buyer published on the notice. Contracts without an end date are not on the radar.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend instead of retendering. Hide them to see contracts that must be re-procured.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term, only for a single supplier, a term of six months or more and a plain contract (not a framework or DPS ceiling).
  • Counts are exact for the time-horizon and sector filters. With other filters, a result above 1,000 contracts shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.