Retender radar: UK public contracts ending soon

Every contract in the catalogue with a published end date in the future, one row per contract (lot). A contract ending is a procurement starting, unless the buyer uses a published extension option, which the row shows. Frameworks and DPS are marked: what ends there is the vehicle, not one supplier’s contract.

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

A likely retender, not a certain one.

252 contracts end within 24 months, 424 in total · £1.5bn published GBP value, exc. VAT, in the next 12 months (framework ceilings included, not a spend forecast).

  1. Next 3 months26
  2. 3–6 months71
  3. 6–12 months48
  4. 12–24 months107

By sector, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

A likely retender, not a certain one.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each.

Contracts ending in the next 12 months

Showing 331–340

  1. Ends · in 169 daysFramework re-let

    Domestic Boiler Replacements

    Luton Council · Local authority · East of England

    Incumbent: Aaron Services Limited

    • Boiler installation work
    • Gas appliance maintenance services
    • Heating works
    Contract value
    £1.2mceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    Ends 31 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-0603d1
  2. Ends · in 169 days

    Residential Development at Mill Lane, Diddlebury

    Connexus Homes Limited · Other public body · West Midlands

    Incumbent: GP Thomas and Son Limited

    • Building construction work
    • Construction work
    • Construction work for houses
    Contract value
    £1.2minc. VAT as published
    Annual run-rate
    £1.4mvalue ÷ published term
    Term
    27 May 2026 → 31 Mar 2027 · 10 months
    Reference
    ocds-h6vhtk-05d41a
  3. Ends · in 169 days

    8 Passenger Lift Replacements at various Bromford Flagship sites.

    BROMFORD FLAGSHIP LIVEWEST LIMITED · Other public body · East of England

    Incumbent: Axel-Elex Ltd T/A Curti Lifts

    • Lift installation work
    Contract value
    £1.2minc. VAT as published
    Annual run-rate
    £1.4mvalue ÷ published term
    Term
    20 May 2026 → 31 Mar 2027 · 10 months
    Reference
    ocds-h6vhtk-05ea11
  4. Ends · in 169 daysFramework re-let

    Scarborough Electrical Inspection Condition Reports

    Beyond Housing Limited · North East England

    Incumbent: BES Group Electrical

    • Electrical services
    • Electrical wiring work
    • Technical inspection and testing services
    Contract value
    £1.1mceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    Ends 31 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-030219
  5. Ends · in 169 daysFramework re-let

    Scarborough Electrical Inspection Condition Reports

    Beyond Housing Limited · North East England

    Incumbent: Complete Electrical UK Ltd

    • Electrical services
    • Electrical wiring work
    • Technical inspection and testing services
    Contract value
    £1.1mceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    Ends 31 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-030219
  6. Ends · in 169 days

    Moorthorpe Car Park Extension

    Northern Trains Ltd · Other public body · Yorkshire and the Humber

    Incumbent: Colt Construction Ltd

    • Construction work
    Contract value
    £1.1m
    Annual run-rate
    £1.4mvalue ÷ published term
    Term
    16 Jun 2026 → 31 Mar 2027 · 9 months
    Reference
    ocds-h6vhtk-05516f
  7. Ends · in 169 daysExtension option · up to 30 Sept 2027

    B1022 - Provision of Low Carbon Heating Upgrade at Brynteg Comprehensive School (Blocks 1, 2 and 3)

    Bridgend County Borough Council · Local authority · Wales (Cymru)

    Incumbent: JackWolf Group Ltd

    • Central-heating equipment
    • Central-heating radiator valves
    • Commissioning of heating installations
    Contract value
    £940k
    Annual run-rate
    £1.7mvalue ÷ published term
    Term
    14 Sept 2026 → 31 Mar 2027 · 6 months · up to 30 Sept 2027 with extensions
    Reference
    ocds-h6vhtk-06b94d
  8. Ends · in 169 daysFramework re-let

    Scarborough reactive Heating Supply & Fix

    Beyond Housing Limited · North East England

    Incumbent: Phoenix Gas Services Ltd

    • Central-heating installation work
    Contract value
    £900kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    Ends 31 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-03026f
  9. Ends · in 169 daysFramework re-let

    Scarborough reactive Heating Supply & Fix

    Beyond Housing Limited · North East England

    Incumbent: PHS Home Solutions Limited

    • Central-heating installation work
    Contract value
    £900kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    Ends 31 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-03026f
  10. Ends · in 169 daysFramework re-let

    Redcar reactive Heating Supply & Fix

    Beyond Housing Limited · North East England

    Incumbent: Buston &Maughan Ltd

    • Central-heating installation work
    Contract value
    £869kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    Ends 31 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-03026f
How to read the radar
  • End date is the contract period end the buyer published on the notice. Contracts without an end date are not on the radar.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend instead of retendering. Hide them to see contracts that must be re-procured.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term, only for a single supplier, a term of six months or more and a plain contract (not a framework or DPS ceiling).
  • Counts are exact for the time-horizon and sector filters. With other filters, a result above 1,000 contracts shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.