Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 20,851–20,860
- Ends · in 306 days
Veeam Data Platform Subscription Licence
Police and Crime Commissioner for Gwent · Police & fire · Wales (Cymru)
Incumbent: Nexstor LTD
The purchase of a subscription licence for Veeam Data Platform which enables the protection and recovery of data across various environments.
- Published value
- £32k
- Annual run-rate
- £32kpublished value ÷ term, exc. VAT
- Term
- 31 Aug 2026 → 30 Aug 2027 · 1 yr
- Reference
ocds-h6vhtk-06eee2
- Ends · in 306 days
DDaT26242 - CMDB Subscription
UK Research and Innovation · Central government · Nationwide (UK)
Incumbent: Inteum International Ltd
***** THIS IS A CONTRACT DETAILS NOTICE, NOT A CALL FOR COMPETITION ***** This procurement is being concluded without competition due to an absence of competition for technical reasons, only a particular supplier can supply the goods, servi…
- Published value
- US$16,543
- Annual run-rate
- —not a GBP value
- Term
- 31 Aug 2026 → 30 Aug 2027 · 1 yr
- Reference
ocds-h6vhtk-068e41
- Ends · in 306 days
Invitation to Tender - Pilot Boat design and build
Peterhead Port Authority · Scotland
Incumbent not published
Peterhead Port Authority is a Trust Port and the Statutory Harbour Authority for Peterhead Port. It has a requirement for a contractor to design, build, test, and deliver a fully operational and seaworthy Pilot Boat (approx. 15m LOA) to mee…
- Published value
- Not published
- Annual run-rate
- —value not published
- Term
- Ends 30 Aug 2027 · start not published
- Reference
ocds-h6vhtk-05e2ca
- Estimated end · in 307 daysFramework recordPanel · 49 suppliers
Hire of Passenger Transport Vehicles with Driver
Bournemouth, Christchurch and Poole Council · Local authority · South West England
Panel: 24x7 Ltd, A L Bennetts Transport Ltd, A one Poole Taxi Ltd +46 more
- Published value
- £13mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 31 Aug 2027 · start not published
- Reference
ocds-h6vhtk-03b0ed
- Estimated end · in 307 daysCall-off
Responsive Repairs and Maintenance, Voids and Planned Works for Arhag Housing Association
Arhag Housing Association · Housing · Nationwide (UK), Greater London
Incumbent: MNM Property Services Ltd · Last contest: 8 bids (7 SME)
- Published value
- £7.7mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 31 Aug 2027 · start not published
- Reference
ocds-h6vhtk-02c6a7
- Estimated end · in 307 daysFramework record
Modular Storage System for Materials Management
Procurement and Logistics Service · Northern Ireland
Incumbent: STAMFORD PRODUCTS LIMITED
- Published value
- £5.0mpublished ceiling for the whole framework
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 31 Aug 2027 · start not published
- Reference
ocds-h6vhtk-03dfef
- Estimated end · in 307 days
NSS Mobile Breast Screening Units (MBSU)
The Common Services Agency (more commonly known as NHS National Services Scotland) (NSS) · NHS & health · Scotland
Incumbent: LYNTON TRAILERS (UK) LTD · Last contest: 4 bids (4 SME) · awarded 5% under the estimate
The NHS Requirement was for quantity four (4) mobile breast screening units (MBSU) to be purchased and delivered between financial years 2025/2026 to 2026/2027 at a rate of 2x MBSU per Financial Year over the 2-year period, with the award o…
- Published value
- £925k
- Annual run-rate
- —start date not published
- Term
- Estimated end 31 Aug 2027 · start not published
- Reference
ocds-h6vhtk-052b95
- Estimated end · in 307 days
Electrical Testing and Inspection
Northern Lincolnshire and Goole NHS Foundation Trust · NHS & health · Yorkshire and the Humber
Incumbent: Guardian Electrical Compliance Ltd · Last contest: 2 bids (2 SME)
In order to maintain compliance with both the 17th Edition and EaWR 1989 throughout the next five years, North Lincolnshire and Goole NHS Foundation Trust will require: 1. 100% Inspection and Thermographic Survey of each DV on an annual bas…
- Published value
- £326k
- Annual run-rate
- —start date not published
- Term
- Estimated end 31 Aug 2027 · start not published
- Reference
ocds-h6vhtk-032b8c
- Estimated end · in 307 daysCall-off
Hospital Discharge D2A P3 - Nursing (General)
NHS Cambridgeshire and Peterborough Integrated Care Board · NHS & health · West Midlands, East of England, Northern Ireland
Incumbent: BARCHESTER HEALTHCARE HOMES LTD Longueville Court · Last contest: 11 bids (1 SME)
- Published value
- £7kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 31 Aug 2027 · start not published
- Reference
ocds-h6vhtk-0292a9
- Estimated end · in 307 days
Without Escort
City of Doncaster Council · Local authority · Yorkshire and the Humber, West Midlands
Incumbent: Ward Transportation LTD · Last contest: 23 bids
- Published value
- £252
- Annual run-rate
- —start date not published
- Term
- Estimated end 31 Aug 2027 · start not published
- Reference
ocds-h6vhtk-035ea9
When contracts end i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
38,347 contracts and agreements end within 24 months, 60,865 in total · £43bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown; 23,900 of 24,034 contracts ending in this window carry a sector classification.
85Health and social work services3,60979Business services: law, marketing, consulting2,66545Construction work2,10472IT services: consulting, software, internet1,62560Transport services (except waste transport)1,54071Architectural, construction, engineering1,42150Repair and maintenance services1,40880Education and training services1,260
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.