Retender radar: UK public contracts ending soon
Every contract on Find a Tender with a published end date in the future, one row per contract (lot). A contract ending is a procurement starting — unless the buyer uses a published extension option, which the row shows. Frameworks and DPS are marked: what ends there is the vehicle, not one supplier’s contract.
When contracts end · Repair and maintenance services i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
275 contracts end within 24 months, 424 in total · £52m published GBP value, exc. VAT, in the next 12 months (framework ceilings included, not a spend forecast).
By sector, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
CPV division of the procedure; a contract with several divisions counts in each.
85Health and social work services1,17133Medical equipments, pharmaceuticals59179Business services: law, marketing, consulting48172IT services: consulting, software, internet18580Education and training services17860Transport services (except waste transport)17550Repair and maintenance services16715Food, drink, tobacco164
Contracts ending in the next 12 months
Showing 256–270
- Ends · in 265 daysFramework re-letPanel · 3 suppliers
Lot 3 - Kerb and Slab Lifters
ESPO · Nationwide (UK)
Panel: GAP Group Limited, J.B. TOOL HIRE LIMITED, Sunbelt Rentals Ltd
- Contract value
- £10mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 5 Jul 2027 · start not published
- Reference
ocds-h6vhtk-04e40c
- Ends · in 265 daysFramework re-letPanel · 8 suppliers
Lot 4 - Dumpers/Skip Loaders
ESPO · Nationwide (UK)
Panel: BALLOO HIRE CENTRE LIMITED, Clee Hill Plant Ltd, GAP Group Limited +5 more
- Contract value
- £10mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 5 Jul 2027 · start not published
- Reference
ocds-h6vhtk-04e40c
- Ends · in 265 daysFramework re-letPanel · 5 suppliers
Lot 5 - Rollers
ESPO · Nationwide (UK)
Panel: Clee Hill Plant Ltd, GAP Group Limited, J.B. TOOL HIRE LIMITED +2 more
- Contract value
- £10mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 5 Jul 2027 · start not published
- Reference
ocds-h6vhtk-04e40c
- Ends · in 265 daysFramework re-letPanel · 5 suppliers
Lot 6 - Multi-Tyred Rollers
ESPO · Nationwide (UK)
Panel: BALLOO HIRE CENTRE LIMITED, Clee Hill Plant Ltd, J.B. TOOL HIRE LIMITED +2 more
- Contract value
- £10mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 5 Jul 2027 · start not published
- Reference
ocds-h6vhtk-04e40c
- Ends · in 265 daysFramework re-letPanel · 6 suppliers
Lot 7 - Pumps
ESPO · Nationwide (UK)
Panel: BALLOO HIRE CENTRE LIMITED, CASTLEVILLE DEVELOPMENTS LIMITED (t/a Parker Hire Services), GAP Group Limited +3 more
- Contract value
- £10mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 5 Jul 2027 · start not published
- Reference
ocds-h6vhtk-04e40c
- Ends · in 265 daysFramework re-letPanel · 6 suppliers
Lot 8 - Compactors
ESPO · Nationwide (UK)
Panel: CASTLEVILLE DEVELOPMENTS LIMITED (t/a Parker Hire Services), GAP Group Limited, HSS HIRE SERVICE GROUP LIMITED +3 more
- Contract value
- £10mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 5 Jul 2027 · start not published
- Reference
ocds-h6vhtk-04e40c
- Ends · in 265 daysFramework re-letPanel · 5 suppliers
Lot 9 - Compressors and Air Tools
ESPO · Nationwide (UK)
Panel: BALLOO HIRE CENTRE LIMITED, GAP Group Limited, HSS HIRE SERVICE GROUP LIMITED +2 more
- Contract value
- £10mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 5 Jul 2027 · start not published
- Reference
ocds-h6vhtk-04e40c
- Ends · in 265 daysExtension option · up to 5 Jul 2028
Residences Low Occupancy Water Flushing
Cardiff University · Education · Wales (Cymru)
Incumbent: Rock Compliance Limited
- Contract value
- £92k
- Annual run-rate
- £92kvalue ÷ published term
- Term
- 6 Jul 2026 → 5 Jul 2027 · 11 months · up to 5 Jul 2028 with extensions
- Reference
ocds-h6vhtk-067c88
- Ends · in 267 days
HVAC Maintenance and Repair Contract
Gentoo Group Limited · North East England
Incumbent: DFP Services Ltd
- Contract value
- £208k
- Annual run-rate
- —start date not published
- Term
- Ends 7 Jul 2027 · start not published
- Reference
ocds-h6vhtk-043cdc
- Ends · in 269 daysExtension option · up to 9 Jul 2028
Mechanical Commissioning Works - Leeds Building Services
Leeds City Council · Local authority · Nationwide (UK), Yorkshire and the Humber
Incumbent: Accuflow Commissioning Ltd
- Contract value
- £40k
- Annual run-rate
- £20kvalue ÷ published term
- Term
- 10 Jul 2025 → 9 Jul 2027 · 1.9 yrs · up to 9 Jul 2028 with extensions
- Reference
ocds-h6vhtk-054f45
- Ends · in 269 daysExtension option · up to 10 Jul 2028
Mechanical Comissioning Works - Leeds Building Services
Leeds City Council · Local authority · Nationwide (UK), Yorkshire and the Humber
Incumbent: Accuflow Commissioning Ltd
- Contract value
- £50k
- Annual run-rate
- £25kvalue ÷ published term
- Term
- 10 Jul 2025 → 10 Jul 2027 · 1.9 yrs · up to 10 Jul 2028 with extensions
- Reference
ocds-h6vhtk-054f45
- Ends · in 290 daysExtension option · up to 30 Jul 2029
Dacorum Festive Lights Scheme
Dacorum Borough Council · Local authority · East of England
Incumbent: Sparkx Limited
- Contract value
- £191k
- Annual run-rate
- £197kvalue ÷ published term
- Term
- 11 Aug 2026 → 30 Jul 2027 · 11 months · up to 30 Jul 2029 with extensions
- Reference
ocds-h6vhtk-066142
- Ends · in 291 daysFramework re-letExtension option · up to 31 Jul 2034Buyer plans to re-tender 1 Nov 2026Panel · 34 suppliers
Lot 2 - Major Works (Voids and Disrepairs)
Wandle Housing Association Limited · Charity · Greater London
Panel: ALL SERVICE 4 U LIMITED, ALP GROUP LIMITED, Arvag Ltd +31 more
- Contract value
- £29mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- 1 Aug 2026 → 31 Jul 2027 · 11 months · up to 31 Jul 2034 with extensions
- Reference
ocds-h6vhtk-05a9c1
- Ends · in 291 daysFramework re-letExtension option · up to 31 Jul 2034Buyer plans to re-tender 1 Nov 2026Panel · 27 suppliers
Lot 3 - Damp and/or Mould Works and Surveys
Wandle Housing Association Limited · Charity · Greater London
Panel: ALL SERVICE 4 U LIMITED, Arvag Ltd, BURTON BUILDING CONTRACTS UK LTD +24 more
- Contract value
- £15mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- 1 Aug 2026 → 31 Jul 2027 · 11 months · up to 31 Jul 2034 with extensions
- Reference
ocds-h6vhtk-05a9c1
- Ends · in 291 daysFramework re-let
Replacement of Domestic Gas Appliances and Associated Works
Sandwell Metropolitan Borough Council · Local authority · West Midlands
Incumbent: Sureserve Compliance Northwest Ltd
- Contract value
- £14mceiling for the whole framework
- Annual run-rate
- —ceiling, not a run-rate
- Term
- Ends 31 Jul 2027 · start not published
- Reference
ocds-h6vhtk-04509c
How to read the radar
- End date is the contract period end the buyer published on Find a Tender. Contracts without an end date are not on the radar.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend instead of retendering. Hide them to see contracts that must be re-procured.
- Incumbent is the canonical supplier on the award behind the contract. A panel (several suppliers on one award) is shown as a panel — no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term, only for a single supplier, a term of six months or more and a plain contract (not a framework or DPS ceiling).
- Counts are exact from the nightly projection when you filter by horizon and sector only; any other filter shows a bounded total — exact up to 1,000 contracts, an honest “1,000+” floor above that.