Expiring UK Public Contracts: Retender Radar
Explore UK public contracts by expiry date, with buyers, incumbent suppliers and extension options. Estimated end dates are labelled; expiry does not guarantee a new tender.
Contracts ending in the next 6 months
Showing 1,066–1,080
- Ends · in 120 days
Whalley Old Road Roundabout
Blackburn With Darwen Borough Council · Local authority · North West England
Incumbent: George Cox & Sons Limited
Whalley Old Road Roundabout, Blackburn. The construction of a new, four arm roundabout to the east of the existing bus turning area on Whalley Old Road. The roundabout will provide a vehicular access to the existing Vistry Housing Developme…
- Published value
- £1.8m
- Annual run-rate
- £2.5mpublished value ÷ term, exc. VAT
- Term
- 15 Jun 2026 → 26 Feb 2027 · 8 months
- Reference
ocds-h6vhtk-06b950
- Ends · in 120 days
A4046 Cwm to Aberbeeg, Drainage and Carriageway Works
Blaenau Gwent County Borough Council · Local authority · Wales (Cymru)
Incumbent: Alun Griffiths (Contractors) Limited (a6 a8 a9 b3 b4 b5 c3 c4 c5 d2 d3) · Last contest: awarded 37% under the estimate
Works involve renewal of the highway drainage consisting of gullies, connections, carrier drain and associated manholes, kerb lines on both running lanes, re-surfacing consisting of overlay and inlay at tie ins, associated lining, signing a…
- Published value
- £1.6m
- Annual run-rate
- —term under 6 months
- Term
- 14 Sept 2026 → 26 Feb 2027 · 5 months
- Reference
ocds-h6vhtk-06bc09
- Ends · in 120 days
Abbeyfield House Refurb
Castle Point Borough Council · Local authority · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent: Indecon Building Limited
Castle Point Borough Council is seeking tenders from suitable and qualified contractors for the Conversion of Abbeyfield House Chapple Lane Hadleigh Benfleet SS72PW in accordance with the conditions of contract and requirements of this invi…
- Published value
- £1.2m
- Annual run-rate
- —term under 6 months
- Term
- 22 Sept 2026 → 26 Feb 2027 · 5 months
- Reference
ocds-h6vhtk-056513
- Ends · in 120 days
Seabrook Primary School Mobile Replacement
Kent County Council · Local authority · South East England
Incumbent: Redec Limited
The contract scope comprises of demolition of old dilapidated mobile unit and replacing it with a new building to provide like for like replacement to provide 2nr classrooms, WCs and ancillary spaces, including a log cabin to replace lost s…
- Published value
- £848k
- Annual run-rate
- £1.4mpublished value ÷ term, exc. VAT
- Term
- 18 Jul 2026 → 26 Feb 2027 · 7 months
- Reference
ocds-h6vhtk-06d604
- Ends · in 120 days
Chilled Water Main Chillers Replacement
National Oceanography Centre · Other public body · South East England
Incumbent: ARB Mechanical Engineering Ltd
The National Oceanography Centre (NOC) is undertaking works under its Long Term Maintenance (LTM) Programme, which includes the end‑of‑life replacement of three cold‑water chillers. This procurement covers the replacement of three existing …
- Published value
- £627k
- Annual run-rate
- £624kpublished value ÷ term, exc. VAT
- Term
- 25 Feb 2026 → 26 Feb 2027 · 1 yr
- Reference
ocds-h6vhtk-065c7b
- Ends · in 120 days
Feltham Centre for Health-Air Conditioning Replacement and Controls Installation
NHS Property Services Limited · NHS & health
Incumbent: ESSEX MECHANICAL SERVICES LIMITED
Contract for Feltham Centre for Health-Air Conditioning Replacement and Controls Installation
- Published value
- £619k
- Annual run-rate
- —term under 6 months
- Term
- 5 Oct 2026 → 26 Feb 2027 · 5 months
- Reference
ocds-h6vhtk-06eadf
- Ends · in 120 days
AP25138NC - High Oakham - Scaffolding
Scape Group Limited (trading as SCAPE) · Other public body · East Midlands
Incumbent: Empire Scaffolding (GB) Ltd
This Contract Details Notice is issued in compliance with the Procurement Act 2023 for a Below Threshold Procurement and is issued on behalf of Arc Property Services Partnership Limited ("Arc Partnership"). Provision of Scaffolding Services…
- Published value
- £172k
- Annual run-rate
- £105kpublished value ÷ term, exc. VAT
- Term
- 7 Jul 2025 → 26 Feb 2027 · 1.7 yrs
- Reference
ocds-h6vhtk-060650
- Ends · in 120 days
Internal Level Access Works Ewart, Shaftoe and Bramwell
Newcastle City Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: K D BUILDING SOLUTIONS LIMITED
Internal level access works to blocks Ewart, Shaftoe and Bramwell
- Published value
- £120kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 9 Nov 2026 → 26 Feb 2027 · 4 months
- Reference
ocds-h6vhtk-06f528
- Ends · in 120 days
Bus Stop Infrastructure Improvements Gwynedd - Meirionnydd 2026/27
Cyngor Gwynedd · Other public body · Nationwide (UK)
Incumbent: GT DAVIES LTD
- Published value
- £114k
- Annual run-rate
- —term under 6 months
- Term
- 14 Sept 2026 → 26 Feb 2027 · 5 months
- Reference
ocds-h6vhtk-06d806
- Ends · in 120 days
Bus Stop Infrastructure Improvements Gwynedd - Arfon 2026/27
Cyngor Gwynedd · Other public body · Nationwide (UK)
Incumbent: GT DAVIES LTD
- Published value
- £105k
- Annual run-rate
- —term under 6 months
- Term
- 14 Sept 2026 → 26 Feb 2027 · 5 months
- Reference
ocds-h6vhtk-06d804
- Ends · in 120 days
Bus Stop Infrastructure Improvements Gwynedd - Dwyfor 2026/27
Cyngor Gwynedd · Other public body · Nationwide (UK)
Incumbent: Tom James Construction services Ltd
- Published value
- £102k
- Annual run-rate
- —term under 6 months
- Term
- 14 Sept 2026 → 26 Feb 2027 · 5 months
- Reference
ocds-h6vhtk-06d80e
- Ends · in 120 days
Phase 1 and 2 Landscaping - Somerford
Greensquareaccord · Other public body · West Midlands
Incumbent: Ground Control Limited
Works - To complete Phase 1 and 2 Landscaping at Somerford Place
- Published value
- £102k
- Annual run-rate
- £59kpublished value ÷ term, exc. VAT
- Term
- 2 Jun 2025 → 26 Feb 2027 · 1.8 yrs
- Reference
ocds-h6vhtk-051a73
- Ends · in 120 days
TVCA-PROC-0777 - Gas Mains Diversion - Darlington Station
Hartlepool Development Corporation · Other public body · North East England
Incumbent: Northern Gas works
Tees Valley Combined Authority (TVCA) ('the contracting authority') have completed a Direct award to Northern Gas Works to facilitate Northern Gas work to facilitate the Darlington Station Western Gateway project on Victoria Road. This is t…
- Published value
- £85k
- Annual run-rate
- £85kpublished value ÷ term, exc. VAT
- Term
- 27 Feb 2026 → 26 Feb 2027 · 1 yr
- Reference
ocds-h6vhtk-065a2d
- Ends · in 120 days
13470 - Area-5 Paint & Repair 2026-27
Winchester City Council · Local authority · South East England
Incumbent: D R Jones Yeovil Ltd
Cyclical cleaning, repair and decoration of properties within WCC Area 5.
- Published value
- £82kinc. VAT as published
- Annual run-rate
- £134kpublished value ÷ term, inc. VAT
- Term
- 20 Jul 2026 → 26 Feb 2027 · 7 months
- Reference
ocds-h6vhtk-06c59c
- Ends · in 120 days
TVCA-PROC-0776 - Virgin Media - Darlington Station
Hartlepool Development Corporation · Other public body · North East England
Incumbent: Virgin Media
Tees Valley Combined Authority (TVCA) ('the contracting authority') have completed a Direct award to Virgin Media. Diversionary works are required to facilitate the Darlington Western Gateway Scheme on Victoria Road This is the Statutory Pr…
- Published value
- £39k
- Annual run-rate
- £39kpublished value ÷ term, exc. VAT
- Term
- 27 Feb 2026 → 26 Feb 2027 · 1 yr
- Reference
ocds-h6vhtk-065a03
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,848 contracts and agreements end within 24 months, 4,753 in total · £3.2bn published GBP values end in the next 6 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 6 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services2,00679Business services: law, marketing, consulting1,66145Construction work1,51172IT services: consulting, software, internet93771Architectural, construction, engineering89150Repair and maintenance services83480Education and training services64648Software package and information systems565
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.