Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 24 months

Showing 16,231–16,245

38,087 contracts

  1. Estimated end · in 230 days

    Planned & Preventative Maintenance

    Europa School · Education · South East England

    Incumbent: SPIE Limited · Last contest: 4 bids (2 SME)

    Europa School is currently out to tender for the provision of Planned and Preventative Maintenance, Cleaning and Grounds Maintenance.The three services have been split into three lots. Lot 1 is Planned and Preventative Maintenance, Lot 2 is…

    • Grounds maintenance services
    Published value
    £494k
    Annual run-rate
    —start date not published
    Term
    Estimated end 11 Jun 2027 · start not published
    Reference
    ocds-h6vhtk-030dfa
  2. Estimated end · in 230 days

    Contract

    Translink · Northern Ireland

    Incumbent: PUMPS FUELS INSTALLATIONS NI LIMITED · Last contest: 2 bids (1 SME) · awarded 1% over the estimate

    Inspection and Maintenance of Fluid Tanks, pumps and associated pipe work including Diesel, Antifreeze, Heavy Oil, AdBlue and Kerosene. Your response must be submitted via the relevant Call for Tender (CfT) on the eTendersNI portal. Instruc…

    • Repair and maintenance services of tanks
    Published value
    £352k
    Annual run-rate
    —start date not published
    Term
    Estimated end 11 Jun 2027 · start not published
    Reference
    ocds-h6vhtk-032b4e
  3. Estimated end · in 230 days

    MSCP Lighting Upgrade and Associated Maintenance

    Guildford Borough Council · Local authority · South East England

    Incumbent: Concrete Repairs Ltd · Last contest: 8 bids (1 SME)

    GBC are seeking to complete the replacement of all lights in our car parks, before the end of November 2022. Many of our existing LED lights will be coming to the end of their life at this time. GBC is seeking to appoint a single suitable N…

    • Lighting systems
    Published value
    £338k
    Annual run-rate
    —start date not published
    Term
    Estimated end 11 Jun 2027 · start not published
    Reference
    ocds-h6vhtk-031b28
  4. Estimated end · in 230 days

    Grounds Maintenance

    Europa School · Education · South East England

    Incumbent: Thames Valley Landscapes · Last contest: 2 bids (1 SME)

    Europa School is currently out to tender for the provision of Planned and Preventative Maintenance, Cleaning and Grounds Maintenance.The three services have been split into three lots. Lot 1 is Planned and Preventative Maintenance, Lot 2 is…

    • Grounds maintenance services
    Published value
    £227k
    Annual run-rate
    —start date not published
    Term
    Estimated end 11 Jun 2027 · start not published
    Reference
    ocds-h6vhtk-030dfa
  5. Estimated end · in 230 daysFramework recordPanel · 10 suppliers

    Peatland Action Monitoring (RMN) Surveyor Framework 2026

    Scottish Natural Heritage · Scotland

    Panel: 3E Services Ltd, Atlantic58, Babbity Environmental Limited +7 more

    • Environmental monitoring other than for construction
    Published value
    £220kpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 11 Jun 2027 · start not published
    Reference
    ocds-h6vhtk-0655b0
  6. Ends · in 231 daysFramework record

    Antimicrobial, contact kill hand shield with residual activity

    SUPPLY CHAIN COORDINATION LIMITED · Other public body · Nationwide (UK)

    Incumbent: Primel Corporation Ltd

    Published value
    £24mpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    14 Jan 2026 → 11 Jun 2027 · 1.4 yrs
    Reference
    ocds-h6vhtk-0597e6
  7. Ends · in 231 days

    WO1862 Bartlett House - groundworks

    Wiltshire Council · Local authority · South West England

    Incumbent: Rigg Construction

    Groundworks for Affordable Homes, Bartlett House, Ludgershall, Wiltshire

    Published value
    £1.5m
    Annual run-rate
    £1.2mpublished value ÷ term, exc. VAT
    Term
    16 Mar 2026 → 11 Jun 2027 · 1.3 yrs
    Reference
    ocds-h6vhtk-0583f6
  8. Ends · in 231 days

    External Advisor on Valuations

    Department for Energy Security & Net Zero · Central government · Nationwide (UK)

    Incumbent: NERA UK Limited

    • Financial and insurance services
    Published value
    £675k
    Annual run-rate
    £227kpublished value ÷ term, exc. VAT
    Term
    21 Jun 2024 → 11 Jun 2027 · 3 yrs
    Reference
    ocds-h6vhtk-05e4fa
  9. Ends · in 231 days

    STA-25005 Provision of a University Bus Service

    Royal Holloway and Bedford New College · Education · South East England

    Incumbent: Rotala Group trading as Hallmark Connections Limited · Last contest: 1 bid

    • Special-purpose road passenger-transport services
    Published value
    £634k
    Annual run-rate
    —start date not published
    Term
    Ends 11 Jun 2027 · start not published
    Reference
    ocds-h6vhtk-04add6
  10. Ends · in 231 days

    Contract title Contract for replacement of existing roofing to 20 no. flats (5 no. two storey blocks) at Beili Glas, Loughor Replacement roofing

    City & County of Swansea · Local authority · Wales (Cymru)

    Incumbent: Glamorgan Services Limited

    Replace existing tiled roofs and install new tiled roofs to porches to 5 no. blocks of flats at Beili Glas, Loughor

    Published value
    £105k
    Annual run-rate
    £123kpublished value ÷ term, exc. VAT
    Term
    3 Aug 2026 → 11 Jun 2027 · 10 months
    Reference
    ocds-h6vhtk-06a797
  11. Ends · in 231 days

    Contract for replacement of existing windows and doors to 20 no. flats (5 no. two storey blocks) at Beili Glas, Loughor

    City & County of Swansea · Local authority · Wales (Cymru)

    Incumbent: Anglian Windows Limited

    Contract for replacement of existing windows and doors to 20 no. flats (5 no. two storey blocks) at Beili Glas, Loughor

    Re-procurement openContract for the Replacement of Cavity Wall Ties and Cavity Insulation Extraction. · bids close

    Published value
    £100k
    Annual run-rate
    £116kpublished value ÷ term, exc. VAT
    Term
    3 Aug 2026 → 11 Jun 2027 · 10 months
    Reference
    ocds-h6vhtk-06b0d2
  12. Ends · in 231 days

    ITEP1188 - Thrive Learning Platform 26-27

    National Highways Limited · Central government

    Incumbent: THRIVE LEARNING LIMITED

    The National Highways People Strategy for the remainder of the RIS period is focused on three key areas, leading our people, developing our people and valuing our people. Developing our people is reliant on the L&D department having the rig…

    Published value
    £92k
    Annual run-rate
    £92kpublished value ÷ term, exc. VAT
    Term
    12 Jun 2026 → 11 Jun 2027 · 1 yr
    Reference
    ocds-h6vhtk-06af48
  13. Ends · in 231 days

    Grange Park - SARC - Refurb Works

    Police, Fire & Crime Commissioner for Staffordshire · Police & fire · Nationwide (UK)

    Incumbent: Mountain Healthcare Limited

    Feasibility for works to Grange Park to adhere to Forensic Regulations - note PFI building

    Published value
    £89k
    Annual run-rate
    £89kpublished value ÷ term, exc. VAT
    Term
    12 Jun 2026 → 11 Jun 2027 · 1 yr
    Reference
    ocds-h6vhtk-06dea4
  14. Ends · in 231 days

    Advance HE Membership

    University of Exeter · Education

    Incumbent: Advance HE

    Advance HE Membership - Year 1

    Published value
    £79k
    Annual run-rate
    £79kpublished value ÷ term, exc. VAT
    Term
    12 Jun 2026 → 11 Jun 2027 · 1 yr
    Reference
    ocds-h6vhtk-06cb4f
  15. Ends · in 231 days

    NOM4149 - EIDO Healthcare Library

    University Hospitals of North Midlands NHS Trust · Central government

    Incumbent: EIDO Healthcare Ltd

    The Authority for University Hospitals North Midlands is awarding the contract for The Provision of EIDO Healthcare Library. The duration will be for 1 Year.

    Published value
    £49k
    Annual run-rate
    £49kpublished value ÷ term, exc. VAT
    Term
    12 Jun 2026 → 11 Jun 2027 · 1 yr
    Reference
    ocds-h6vhtk-06af56

When contracts end
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

38,087 contracts and agreements end within 24 months, 60,556 in total · £70bn published GBP values end in the next 24 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months5,791
  2. 3–6 months7,972
  3. 6–12 months10,032
  4. 12–24 months14,292

By sector, next 24 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.