Morgan Sindall Construction and Infrastructure: Contract Register & Procurement Profile
Companies House: Private Limited Company·North West England·Warrington
Companies House04273754 ↗
Open now0no live notices
i
Tenders you can still bid for.
Notices at tender stage whose deadline has not passed, counted the way the search counts them: a notice shows under every code and region it names.
Notices, last 12 months0last notice 28 Jun 2022 · 20 in the catalogue
i
Notices published in the last 12 months.
Counted per tender, not per lot, against the 12 months before where shown.
Recent procedures
Latest 20 of 20 procedures where this authority buys, is the authority the work is for, or runs the procurement
| Procedure | Status | Published | Published value |
|---|---|---|---|
| PPP Bulk and Bottled Gas CivilsWorks for complete or part construction and civil engineering work | Planned | 28 Jun 2022 | — |
| Scaffolding, Insulation, PaintingConstruction work | Planned | 27 Apr 2022 | £182,000,000 |
| Design and Construct of a warehouse storage racking systemRacking | Planned | 7 Feb 2022 | — |
| *Mechanical InstallationInstallation services of machinery and equipment | Planned | 24 Jan 2022 | — |
| Design and Construct of a Services Building within the Sellafield Site.Works for complete or part construction and civil engineering work | Planned | 13 Dec 2021 | — |
| Concrete Structures, Groundworks, & BlockworkAncillary works for pipelines and cables | Planned | 7 Oct 2021 | £1,000,000,000 |
| Works for the Steam Supply from ThorpSteam and water pipes | Planned | 29 Sept 2021 | — |
| Concrete Structures, Groundwork & BlockworkAncillary works for pipelines and cables | Planned | 29 Sept 2021 | — |
| Phase 1 Habitat SurveyArchitectural | Planned | 23 Aug 2021 | — |
| Manufacture/Fabrication of discontinued cansPackaging of low level nuclear waste | Planned | 26 Jul 2021 | — |
| Manufacture & fabrication of frames, glove port covers and interlocksFabrication work | Planned | 15 Jun 2021 | — |
| Machined Premac PanelsNon-medical equipment based on the use of radiations | Planned | 15 Jun 2021 | — |
| Construction Goods and Personnel Lifts/HoistsHoists | Planned | 10 Jun 2021 | — |
| Sheet PilingSheet piling | Planned | 9 Jun 2021 | — |
| Replacement BMS SwitchroomElectrical installation work of electrical distribution apparatus | Planned | 27 May 2021 | — |
| CCTV ModificationsClosed-circuit surveillance system | Planned | 7 May 2021 | — |
| MPP Electrical & InstrumentationAlarm system and antenna installation work | Planned | 26 Mar 2021 | — |
| Multi Project Procurement – Building Interior Fit Out & FinishesBuilding completion work | Planned | 23 Feb 2021 | — |
| Multi Project Procurement – Fabrication/ManufactureFabrication work | Planned | 16 Feb 2021 | — |
| HVACAir filters | Planned | 22 Jan 2021 | — |
About this data
- Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
- One profile per authority. Different spellings and registration numbers of the same body are merged into this profile. It includes tenders the authority ran for other bodies and tenders run on its behalf; spend is credited to the body that pays.
- Values are published values. Award values are what the authority published, excluding VAT and framework ceilings. They are not a budget or total spend.
- Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.