Official UK procurement notice
Request For Information: Resilient Timing and Positioning System for Operation in Degraded GNSS Environments
Authority: Defence Science and Technology Laboratory (Central government)
The UK Defence Science and Technology Laboratory (Dstl) is seeking information from suppliers regarding commercially available and proven Positioning, Navigation and Timing (PNT) systems capable of providing accurate timing and position information in environments where Global Navigation Satellite System (GNSS) services may be degraded, denied, disrupted or manipulated. to an external system operating in contested electromagnetic environments.
What is being bought
Published requirement descriptionRequest For Information: Resilient Timing and Positioning System for Operation in Degraded GNSS Environments
- Background
The UK Defence Science and Technology Laboratory (Dstl) is seeking information from suppliers regarding commercially available and proven Positioning, Navigation and Timing (PNT) systems capable of providing accurate timing and position information in environments where Global Navigation Satellite System (GNSS) services may be degraded, denied, disrupted or manipulated.
The intended application is the provision of:
- a highly accurate UTC-referenced timing signal, and
- a static position solution
to an external system operating in contested electromagnetic environments.
This RFI is intended to identify mature technologies and assess the current state of the market. Responses will be used to inform future engagement and procurement activities. Please note: The Authority reserves the right not to undertake future procurement activities following completion of the RFI.
- Required Capability
2.1. Timing Performance
The system shall:
- Provide a 1 Pulse Per Second (1PPS) output traceable to UTC.
- Provide a 10 MHz frequency reference output.
- Maintain a timing accuracy of better than ±30 ns relative to UTC.
- Maintain timing accuracy during normal operation and throughout the required holdover period.
2.2. Positioning Performance
The system shall:
- Provide a static position solution with an accuracy better than 5 m relative to surveyed ground truth.
2.3. Holdover
The system shall:
- Maintain compliance with the timing and position accuracy requirements during a continuous 12-hour loss of all external PNT signal sources.
2.4. Resilience
The system shall:
- Continue to provide compliant timing and positioning performance in the presence of GNSS jamming and spoofing.
- Be capable of acquiring and establishing an initial timing and position solution in the presence of GNSS jamming and spoofing.
- Where non-GNSS PNT sources are utilised (e.g. LEO-PNT), the system shall demonstrate resilience to jamming and interference affecting those signal sources.
2.5. Technology Maturity
The system shall:
- Utilise proven technology with a Technology Readiness Level (TRL) of 9, or provide evidence of equivalent operational deployment and maturity.
2.6. Operational Environment
The system shall:
- Be capable of operating globally.
- Identify any dependencies on antenna siting, sky visibility or supporting infrastructure.
- State any environmental or deployment constraints that could affect performance.
- Exclusions
The proposed solution shall not:
- Depend upon fixed local infrastructure such as fibre-optic timing distribution networks.
- Require user-generated or user-provided PNT signals.
- Depend upon temporary or ad hoc reference sources that are not persistently available.
- Depend upon any ITAR-controlled components.
- Information Requested
Suppliers are requested to provide the information detailed below:
- System Description - Overview of the system architecture, operating concept and key subsystems.
- Timing Accuracy - UTC timing accuracy achieved, performance metrics used and evidence supporting claimed performance.
- Position Accuracy - Static position accuracy achieved, performance metrics used and evidence supporting claimed performance.
- Holdover Performance - Timing and position performance during complete loss of external PNT sources, including performance over a continuous 12-hour period.
- PNT Signal Sources - Details of all PNT signals utilised by the system, including GNSS constellations and alternative PNT sources.
- UTC Traceability - Description of how UTC traceability is established and maintained.
- Sensor Fusion - Description of any algorithms or techniques used to combine multiple PNT sources.
- Jamming Resilience - Description of anti-jam techniques employed and results of any relevant testing or operational use.
- Spoofing Resilience - Description of spoofing detection, mitigation and recovery mechanisms together with supporting test evidence.
- Acquisition Capability - Ability to establish an initial timing and position solution in contested environments, including any dependencies or limitations.
- Timing Outputs - Details of all timing and frequency outputs provided.
- Data Outputs - Position, navigation and status outputs available from the system together with supported interfaces and protocols.
- Oscillator Technology - Details of oscillator technology used (e.g. OCXO, DOCXO, Rubidium, CSAC), including its contribution to holdover performance.
- External Dependencies - Any requirements for external services, subscriptions, assistance data or cloud connectivity.
- Environmental Constraints - Environmental operating limits, deployment considerations and installation requirements.
- SWaP - Size, weight and power consumption.
- Unit Cost - Indicative unit pricing and any recurring costs.
- Operational Use - Details of operational deployments, customer usage, certifications or fielded applications.
- Technology Readiness - Evidence supporting the stated technology readiness level.
RFI Deadline: 9th December 2026 at 17:00
Responses should be submitted via Microsoft Word/ PDF file and include the following: a covering letter including your company details and then the proposed solution ensuring all of the above details (information requested) are covered.
Responses to this RFI are to be sent via email to the following address: [email protected]
Please use the subject title: RFI Response - Resilient Timing and Positioning System for Operation in Degraded GNSS Environments
CPV: Global navigation and positioning systems (GPS or equivalent)
The lotProcurement structure
single lot · no lot value publishedPipeline intelligence · planning stage: how this market runs before the tender is published
How Defence Science and Technology Laboratory buys Navigational instruments (CPV 3811), and who usually turns up
Defence Science and Technology Laboratory’s published record next to the market for the same work. Frameworks and DPS are left out: they draw different bid counts. Whole-market view: Navigational instruments (CPV 3811) →
How the contest usually goes
Winner shares use published awards; bid and price charts use contested lots.
i
The counts under this question show how many awards have a known supplier size.
Small firms have won here. Neither number says whether you qualify; it describes who has been winning.
i
Local means the winner is registered in the region where that award was delivered.
Most of this buyer’s recorded winners were registered in the region where that award was delivered.
i
Half of these awards have an award date within 36 days of the bid deadline.
i
Both shares are minimums: some awards have no bid count.
Direct awards or one recorded bid are common here. Check the route before spending time on a bid.
How many bids did past lots attract?
i
1 bid58% / 40%
2–38% / 40%
4–625% / 20%
7+8% / 0%
How did awards compare with estimates?
i
Below estimate49%
Within ±2%26%
Above estimate26%
Assess each lot i
i
Open a lot for its forecast, this buyer’s previous supplier and possible competitors, from published award history, not a bid list
Lot #1CPV 3811Published estimate£100k
i
Each lot shows its own forecast based on its own category; forecasts for different lots of the same notice are not comparative. The bar shows 260 past lots.
1 bid26%
2–348%
4–615%
7+11%
i
No comparable awards for this lot yet.
Who has supplied this buyer on similar work? i
i
No earlier contract of this buyer matches this lot on the published record.
Who could compete for this lot? i
i
Candidate suppliers for this notice have not been worked out yet, so this is not a verdict that nobody fits.
About this data
- Estimates, labelled. The price range, possible competitors and earlier-work matches are our estimates from past awards, not published facts, win chances or price advice. The buyer’s own record and the wider market are shown apart, never mixed.
- Source. Official UK public procurement notices (Find a Tender and Contracts Finder), reused under the Open Government Licence v3.0, updated through the day and rebuilt nightly. Not every figure uses both feeds, and each one shows how many records it rests on: see the methodology. Spotted something wrong? Tell us.
Coming up in this sector
Contracts ending within 12 months · Retender Radar, sector filter set
Procedure terms & legal framework
From the official record- Legal basis
- UKPGA · 2023/54 Procurement Act 2023
- Procurement category
- Goods
- Notice status
- Planned procurement
- Procurement threshold
- Below threshold
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Unspecified in notice
- First published
- 11 Nov 2026, 13:46 GMT
- Last source update
- 12 Nov 2026, 10:18 GMT
- Authority reference
SP4RFI- FTS notice number
2026/S 000-107427- Latest notice
- Preliminary market engagement notice (UK2)
- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-07b9acFind a Tender
How it was run
Official notice- Submission deadline
- —
Timeline
11 Nov 2026 → 4 Feb 2027 · 4 dates- Planning notice published2 days ago11 Nov 2026, 13:46 GMT
- Today14 Nov 2026
- Market engagementin 26 days10 Dec 2026, 23:59 GMT
Request For Information: Resilient Timing and Positioning System for Operation in Degraded GNSS Environments
- Background
The UK Defence Science and Technology Laboratory (Dstl) is seeking information from suppliers regarding commercially available and proven Positioning, Navigation and Timing (PNT) systems capable of providing accurate timing and position information in environments where Global Navigation Satellite System (GNSS) services may be degraded, denied, disrupted or manipulated.
The intended application is the provision of:
- a highly accurate UTC-referenced timing signal, and
- a static position solution
to an external system operating in contested electromagnetic environments.
This RFI is intended to identify mature technologies and assess the current state of the market. Responses will be used to inform future engagement and procurement activities. Please note: The Authority reserves the right not to undertake future procurement activities following completion of the RFI.
- Required Capability
2.1. Timing Performance
The system shall:
- Provide a 1 Pulse Per Second (1PPS) output traceable to UTC.
- Provide a 10 MHz frequency reference output.
- Maintain a timing accuracy of better than ±30 ns relative to UTC.
- Maintain timing accuracy during normal operation and throughout the required holdover period.
2.2. Positioning Performance
The system shall:
- Provide a static position solution with an accuracy better than 5 m relative to surveyed ground truth.
2.3. Holdover
The system shall:
- Maintain compliance with the timing and position accuracy requirements during a continuous 12-hour loss of all external PNT signal sources.
2.4. Resilience
The system shall:
- Continue to provide compliant timing and positioning performance in the presence of GNSS jamming and spoofing.
- Be capable of acquiring and establishing an initial timing and position solution in the presence of GNSS jamming and spoofing.
- Where non-GNSS PNT sources are utilised (e.g. LEO-PNT), the system shall demonstrate resilience to jamming and interference affecting those signal sources.
2.5. Technology Maturity
The system shall:
- Utilise proven technology with a Technology Readiness Level (TRL) of 9, or provide evidence of equivalent operational deployment and maturity.
2.6. Operational Environment
The system shall:
- Be capable of operating globally.
- Identify any dependencies on antenna siting, sky visibility or supporting infrastructure.
- State any environmental or deployment constraints that could affect performance.
- Exclusions
The proposed solution shall not:
- Depend upon fixed local infrastructure such as fibre-optic timing distribution networks.
- Require user-generated or user-provided PNT signals.
- Depend upon temporary or ad hoc reference sources that are not persistently available.
- Depend upon any ITAR-controlled components.
- Information Requested
Suppliers are requested to provide the information detailed below:
- System Description - Overview of the system architecture, operating concept and key subsystems.
- Timing Accuracy - UTC timing accuracy achieved, performance metrics used and evidence supporting claimed performance.
- Position Accuracy - Static position accuracy achieved, performance metrics used and evidence supporting claimed performance.
- Holdover Performance - Timing and position performance during complete loss of external PNT sources, including performance over a continuous 12-hour period.
- PNT Signal Sources - Details of all PNT signals utilised by the system, including GNSS constellations and alternative PNT sources.
- UTC Traceability - Description of how UTC traceability is established and maintained.
- Sensor Fusion - Description of any algorithms or techniques used to combine multiple PNT sources.
- Jamming Resilience - Description of anti-jam techniques employed and results of any relevant testing or operational use.
- Spoofing Resilience - Description of spoofing detection, mitigation and recovery mechanisms together with supporting test evidence.
- Acquisition Capability - Ability to establish an initial timing and position solution in contested environments, including any dependencies or limitations.
- Timing Outputs - Details of all timing and frequency outputs provided.
- Data Outputs - Position, navigation and status outputs available from the system together with supported interfaces and protocols.
- Oscillator Technology - Details of oscillator technology used (e.g. OCXO, DOCXO, Rubidium, CSAC), including its contribution to holdover performance.
- External Dependencies - Any requirements for external services, subscriptions, assistance data or cloud connectivity.
- Environmental Constraints - Environmental operating limits, deployment considerations and installation requirements.
- SWaP - Size, weight and power consumption.
- Unit Cost - Indicative unit pricing and any recurring costs.
- Operational Use - Details of operational deployments, customer usage, certifications or fielded applications.
- Technology Readiness - Evidence supporting the stated technology readiness level.
RFI Deadline: 9th December 2026 at 17:00
Responses should be submitted via Microsoft Word/ PDF file and include the following: a covering letter including your company details and then the proposed solution ensuring all of the above details (information requested) are covered.
Responses to this RFI are to be sent via email to the following address: [email protected]
Please use the subject title: RFI Response - Resilient Timing and Positioning System for Operation in Degraded GNSS Environments
- Tender notice expectedin 51 days4 Jan 2027, 23:59 GMT
- Contract startsin 81 days4 Feb 2027
Notice history
2 events · 2 releases on Find a Tender · since 11 Nov 2026- Preliminary market engagement notice published11 Nov 2026, 13:46 GMTUK2
- Preliminary market engagement notice published12 Nov 2026, 10:18 GMTUK2
Commercial outcome & contract awards
Pipeline notice- Awards (0)
- No award published
- Contracts (0)
- No contract published
- Bid statistics
- No aggregate bid statistics published
Contracting authority & participating public bodies
Official documents & specifications (2)
Official links; attachments are not copiedNotices published for this procedure
- Preliminary market engagement notice Preliminary market engagement notice on Find a Tender
- Preliminary market engagement notice Preliminary market engagement notice on Find a Tender