Official UK procurement notice
Prior Information Notice: Gritting Salt Supply, Storage and Loading – LB Brent (EPR-2122-202)
Authority: London Borough of Brent (Local council)
What is being bought
Published requirement descriptionThis is a Prior Information Notice (PIN) for information only. It is not a formal invitation to tender.
The London Borough of Brent (the Authority) intends to seek provision of gritting salt supply, storage and loading facilities to support the delivery of its Winter Maintenance Services from 1 April 2023.
CPV: Lifting, handling, loading or unloading machinery · Loading equipment · Loading or handling machinery · Road salt · Rock salt · Storage and warehousing services · Surface work for roads · Unloading equipment · Winter-maintenance materials
The lotProcurement structure
single lot · value publishedLot #1The London Borough of Brent (the Authority) is currently procuring an Integrated…PlannedRenewalPublished value£1,300,000
The London Borough of Brent (the Authority) is currently procuring an Integrated Street Cleansing, Waste Collections and Winter Maintenance Services Contract, with the new contract due to commence on 1 April 2023.
The Authority requires provision of gritting salt supply and salt storage and loading services to support the delivery of the aforementioned contract.
The services required will broadly encompass:
- The supply of gritting salt to be used by the Authority as part of its winter maintenance activities (the Authority requires the supply of 1,800t of salt during the first contract year, and for this level to be maintained / topped up during each subsequent contract year)
- The provision of a salt barn for year-round storage of gritting salt, including maintenance, pest control and security
- The provision of salt loading services at the storage facility during the Winter Services Period (means ordinarily 1st November to 31st March of each contract year) to assist with the loading of salt onto the Authority’s winter maintenance vehicles
Please note that suppliers must demonstrate they have the ability and infrastructure to supply and load salt within a timescale to enable the delivery of the winter maintenance services at short notice and in an emergency situation (i.e. adverse weather). Therefore, the salt barn must be situated within a one hour drive of the borough’s boundaries in order to allow prompt and efficient delivery of the Authority’s winter maintenance services.
Please note that this procurement does not include the requirement to spread salt or to deliver winter maintenance services within the Authority area, as these services will be delivered by the Authority’s Integrated Contractor.
Contract Term: Maximum of eight years, with an initial term of three years and the option for mutually agreeable extensions of up to five additional years.
Key Procurement Timetable Indicative Dates:
- Publication of Contract Notice and issue of SQ: 5 April 2022
- Contract Award: September 2022
Procurement procedure: Restricted procedure
Contract Value: Due to the variability in salt supply costs and service charges for storage and loading, the contract is anticipated to value between £1,200,000 and £1,400,000 over the maximum eight year term including extensions.
Please note that this notice does not commit the Council to any future competition or award.
Procedure terms & legal framework
From the official record- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Goods
- Notice status
- Past planning notice
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- Unspecified in notice
- First published
- 24 Feb 2022, 10:36 GMT
- Last source update
- 24 Feb 2022, 10:36 GMT
- Authority reference
DN597297- FTS notice number
2022/S 000-005116- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-031a98Find a Tender
How it was run
Official notice- Submission deadline
- —
Timeline
24 Feb 2022 → 5 Apr 2022 · 2 dates- Notice published24 Feb 2022, 10:36 GMT
- Tender notice expected5 Apr 2022, 00:00 BST
Commercial outcome & contract awards
Pipeline notice- Awards (0)
- No award published
- Contracts (0)
- No contract published
- Bid statistics
- No aggregate bid statistics published
Contracting authority & participating public bodies
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.