Official UK procurement notice
Planned and Responsive Works Framework - South-East England
Authority: Places for People on behalf of PfP & Anchor Hanover Group (Public body)
What is being bought4 lots · detail below
Published requirement descriptionPlaces for People wishes to establish a framework agreement for a 3-year duration with an option to extend for two further 1 year periods. Contractors are invited to apply for up to four regional lots across South East England for construction works and services as defined by the NUTS and CPV. Projects for five other regional frameworks will be advertised separately. The Planned & Responsive Works framework is intended to provide planned and responsive services across Places for People’s affordable housing stock, and to any third party organisations to whom PFP has an agreement (or may enter into such an agreement during the term) to provide such services.
CPV: Building completion work · Building installation work · Construction work · Electrical installation work · Fencing, railing and safety equipment installation work · Floor and wall covering work · Insulation work · Joinery and carpentry installation work · Mechanical installations · Other building completion work · Painting and glazing work · Plastering work · +1 more
How this framework works
From the published notice- Bids received
- 10 bids received · 4 suppliers appointed
Lots and requirements (4)Procurement structure
4 lots · all with a published value · evaluation weights differ by lotEvery one of these 2 lots carries the same published figure, £3,500,000: it is the framework's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.
Lot #1Sub - region 1Cancelledceiling above
Places for People (Places Management) are seeking three contractors to deliver planned and responsive works to 3,310 properties in the CO, IP and NR postcode regions. The Planned & Responsive Works framework is intended to provide planned and responsive services across Places for People’s affordable housing stock, and to any third party organisations to whom PFP has an agreement (or may enter into such an agreement during the term) to provide such services. PFP has its own in-house Repairs and Landscaping team, Places Management. Places Management are resourced to provide the required services in most, but not all, locations where PFP has affordable housing stock. There are currently 3 different categories for the stock included within the framework: a)“Core” stock PFP’s “Core” stock is that which can be serviced by the Places Management team within a 30 minute travel time of the base location. This forms the majority of PFP’s affordable housing stock. Core stock may change over time as Places Management’s team changes. For PFP’s Core stock, the framework is intended to provide support where Places Management does not have the required resource to undertake the works. This includes standard trades – i.e. those under the NHF Schedule of Rates for Responsive and Void Works. Ad-hoc planned works (i.e. works which falls outside our major works planned investment programme) may be included within this framework. b)“Non-Core” stock PFP’s “Non-Core” stock is that which falls outside the 30 minute travel time for the Places Management team. This forms a small proportion of PFP’s overall affordable housing stock. Non-Core stock may change over time as Places Management’s team changes. For PFP’s Non-Core stock, the framework is intended to provide all resource required to operate the responsive repairs and voids service for the standard trades. Ad-hoc planned works (i.e. works which falls outside our major works planned investment programme) may be included within this framework. In time, costs for Non-Core stock are likely to be on a cost per property basis. However, for the purposes of this tender, costs are to be on the basis of the pricing instructions. c)Third Party owned stock PFP’s Third Party owned stock is any housing stock forming part of the framework which is not affordable housing owned by PFP. At the current time, that includes housing stock owned by just one third party organisation, but this may change over time as PFP’s contractual commitments change. Additional information: To respond to this opportunity please click here: placesforpeople.delta-esourcing.com/respond/V74879JFC9 ↗
Lot #2Sub region 2AwardedPublished value£10,000,000
Places for People (Places Management) are seeking three contractors to deliver planned and responsive works to 9,852 properties in the AL, CB, CM, HP, LU, MK, PE and SG postcode regions. The Planned & Responsive Works framework is intended to provide planned and responsive services across Places for People’s affordable housing stock, and to any third party organisations to whom PFP has an agreement (or may enter into such an agreement during the term) to provide such services. PFP has its own in-house Repairs and Landscaping team, Places Management. Places Management are resourced to provide the required services in most, but not all, locations where PFP has affordable housing stock. There are currently 3 different categories for the stock included within the framework: a)“Core” stock PFP’s “Core” stock is that which can be serviced by the Places Management team within a 30 minute travel time of the base location. This forms the majority of PFP’s affordable housing stock. Core stock may change over time as Places Management’s team changes. For PFP’s Core stock, the framework is intended to provide support where Places Management does not have the required resource to undertake the works. This includes standard trades – i.e. those under the NHF Schedule of Rates for Responsive and Void Works. Ad-hoc planned works (i.e. works which falls outside our major works planned investment programme) may be included within this framework. b)“Non-Core” stock PFP’s “Non-Core” stock is that which falls outside the 30 minute travel time for the Places Management team. This forms a small proportion of PFP’s overall affordable housing stock. Non-Core stock may change over time as Places Management’s team changes. For PFP’s Non-Core stock, the framework is intended to provide all resource required to operate the responsive repairs and voids service for the standard trades. Ad-hoc planned works (i.e. works which falls outside our major works planned investment programme) may be included within this framework. In time, costs for Non-Core stock are likely to be on a cost per property basis. However, for the purposes of this tender, costs are to be on the basis of the pricing instructions. c)Third Party owned stock PFP’s Third Party owned stock is any housing stock forming part of the framework which is not affordable housing owned by PFP. At the current time, that includes housing stock owned by just one third party organisation, but this may change over time as PFP’s contractual commitments change.
Lot #3Sub-region 3AwardedPublished value£8,000,000
Places for People (Places Management) are seeking three contractors to deliver planned and responsive works to 3,552 properties in the BR, CR, E, EN, GU, HA, IG, KT, N, NW, RM, SE, SL, SM, SW, TW, UB, W and WD postcode regions. The Planned & Responsive Works framework is intended to provide planned and responsive services across Places for People’s affordable housing stock, and to any third party organisations to whom PFP has an agreement (or may enter into such an agreement during the term) to provide such services. PFP has its own in-house Repairs and Landscaping team, Places Management. Places Management are resourced to provide the required services in most, but not all, locations where PFP has affordable housing stock. There are currently 3 different categories for the stock included within the framework: a)“Core” stock PFP’s “Core” stock is that which can be serviced by the Places Management team within a 30 minute travel time of the base location. This forms the majority of PFP’s affordable housing stock. Core stock may change over time as Places Management’s team changes. For PFP’s Core stock, the framework is intended to provide support where Places Management does not have the required resource to undertake the works. This includes standard trades – i.e. those under the NHF Schedule of Rates for Responsive and Void Works. Ad-hoc planned works (i.e. works which falls outside our major works planned investment programme) may be included within this framework. b)“Non-Core” stock PFP’s “Non-Core” stock is that which falls outside the 30 minute travel time for the Places Management team. This forms a small proportion of PFP’s overall affordable housing stock. Non-Core stock may change over time as Places Management’s team changes. For PFP’s Non-Core stock, the framework is intended to provide all resource required to operate the responsive repairs and voids service for the standard trades. Ad-hoc planned works (i.e. works which falls outside our major works planned investment programme) may be included within this framework. In time, costs for Non-Core stock are likely to be on a cost per property basis. However, for the purposes of this tender, costs are to be on the basis of the pricing instructions. c)Third Party owned stock PFP’s Third Party owned stock is any housing stock forming part of the framework which is not affordable housing owned by PFP. At the current time, that includes housing stock owned by just one third party organisation, but this may change over time as PFP’s contractual commitments change.
Lot #4Sub-region 4Awardedceiling above
Places for People (Places Management) are seeking three contractors to deliver planned and responsive works to 3,009 properties in the BN, CT, DA, ME, SS and TN postcode regions. The Planned & Responsive Works framework is intended to provide planned and responsive services across Places for People’s affordable housing stock, and to any third party organisations to whom PFP has an agreement (or may enter into such an agreement during the term) to provide such services. PFP has its own in-house Repairs and Landscaping team, Places Management. Places Management are resourced to provide the required services in most, but not all, locations where PFP has affordable housing stock. There are currently 3 different categories for the stock included within the framework: a)“Core” stock PFP’s “Core” stock is that which can be serviced by the Places Management team within a 30 minute travel time of the base location. This forms the majority of PFP’s affordable housing stock. Core stock may change over time as Places Management’s team changes. For PFP’s Core stock, the framework is intended to provide support where Places Management does not have the required resource to undertake the works. This includes standard trades – i.e. those under the NHF Schedule of Rates for Responsive and Void Works. Ad-hoc planned works (i.e. works which falls outside our major works planned investment programme) may be included within this framework. b)“Non-Core” stock PFP’s “Non-Core” stock is that which falls outside the 30 minute travel time for the Places Management team. This forms a small proportion of PFP’s overall affordable housing stock. Non-Core stock may change over time as Places Management’s team changes. For PFP’s Non-Core stock, the framework is intended to provide all resource required to operate the responsive repairs and voids service for the standard trades. Ad-hoc planned works (i.e. works which falls outside our major works planned investment programme) may be included within this framework. In time, costs for Non-Core stock are likely to be on a cost per property basis. However, for the purposes of this tender, costs are to be on the basis of the pricing instructions. c)Third Party owned stock PFP’s Third Party owned stock is any housing stock forming part of the framework which is not affordable housing owned by PFP. At the current time, that includes housing stock owned by just one third party organisation, but this may change over time as PFP’s contractual commitments change.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Lots publish different evaluation splits; there is no single procedure weighting.
| Lot | Quality | Price | Split |
|---|---|---|---|
| 2 · Sub region 2 | 65% | 35% | |
| 3 · Sub-region 3 | 65% | 35% |
- Price carries 35 points on every lot: a 10% discount moves about 3.5 points.
- “Planned and Responsive Works Framework - South-East England” is a framework: the contest is a place on its panel, not a single contract.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record · publisher note attached- Procedure method
- Open procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- No (one-off requirement)
- First published
- 13 Dec 2022, 12:05 GMT
- Last source update
- 25 May 2023, 16:05 BST
- Award evaluation window
- 24 Jan 2023 – …
- FTS notice number
2023/S 000-014973- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-038ceaFind a Tender
- Review procedure
The Contracting Authority will observe a standstill period following the award of the framework agreement and conduct itself in respect of any appeals in accordance with the Public Contracts Regulations 2015.
Publisher note: Under the Public Services (Social Value) Act 2012 the contracting authority must consider: (a)How what is proposed to be procured might improve the economic, social and environmental well-being of the area where it exercises its functions; and (b)How, in conducting the process of procurement, it might act with a view to securing that improvement. Accordingly, the subject matter of the framework agreement has been scoped to take into account the priorities of the contracting authority relating to economic, social and environmental well-being. These priorities are described in the procurement documents. To view this notice, please click here: <a href="https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=781868557" target="_blank">https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=781868557</a> GO Reference: GO-2023525-PRO-23048176
How it was run
Official notice- Appointment period ends
- 24 Jan 2023, 12:00 GMT
- Submission channel
- {"electronicSubmission","written"}
- Accepted languages
- en
- Bid validity
- 180 days from the deadline
- Bids opened
- 24 Jan 2023, 12:00 GMT
Timeline
24 Jan 2023 → 25 May 2023 · 3 dates- Admission / appointment period endsperiod end, not a bid countdown24 Jan 2023, 12:00 GMT
- Bids opened24 Jan 2023, 12:00 GMT
- Notice published25 May 2023, 16:05 BST
Notice history
1 event · 2 releases on Find a Tender- Status changed to complete25 May 2023, 16:05 BST
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast4 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.
Contracts
All 2 of these contracts carry the same published figure, £3,500,000, the framework's maximum for the whole notice, not each contract's own value. They are not eleven separate sums.
Sub - region 1
- Signed
- 21 Mar 2023
- Value
- ceiling above
- Status
- active
Sub Region 2
- Signed
- 21 Mar 2023
- Value
- £10,000,000
- Status
- active
Sub Region 3
- Signed
- 21 Mar 2023
- Value
- £8,000,000
- Status
- active
Sub Region 4
- Signed
- 21 Mar 2023
- Value
- ceiling above
- Status
- active
Bid statistics published by the authority
| Lot | Bids | SME | VCSE | Valid bid range |
|---|---|---|---|---|
| 2 · Sub region 2 | 10bids | — | — | — |
| 3 · Sub-region 3 | 10bids | — | — | — |
| 4 · Sub-region 4 | 10bids | — | — | — |
| Whole notice | 10bids | — | — | — |
Contracting authority & participating public bodies
Dispute resolution & review bodies
- Cabinet OfficeReview contact point
- High Court of England and WalesMediation bodyReview body
Framework contractors & participating bidders
5 commercial parties on the notice- Argent FMFramework contractor
- Bell Decorating GroupFramework contractor
- Bell Decorating Group LimitedFramework contractor
- Mullen Property ServicesFramework contractor
- Re-Gen (UK) Construction LtdFramework contractor
Official documents & specifications (2)
Official links; attachments are not copiedTender pack and attachments
- Economic and financial selection criteria
- Technical selection criteria