Find a TenderAwardedContract award notice
Published 21 Jan 2026, 09:45 GMT

Official UK procurement notice

Liquid Waste Removal and Drainage Services

Official notice

Authority: Northern Trains Ltd (Public body)

Framework agreementServicesCompetitive flexible procedureAbove thresholdUtilitiesSME suitable
Framework ceiling (notional)£2,600,000framework ceiling, not attributable revenue · 1 value update
Submissions closed 16 Mar 2026awarded 11 Aug 2026
Award (standstill) to Adler and Allan Ltd2 awards
Framework period 4 yrsends 1 Jul 2030 · up to 1 Jul 2034 with extensions · starts 1 Jul 2026

What is being bought

Published requirement description

Northern Trains Limited ("NTL") has completed a procurement process for the provision of Liquid Waste Removal and Drainage Services across its network.

The procurement has established a single supplier Framework Agreement to support NTL's requirements for liquid waste management and drainage services across its train maintenance facilities.

NTL undertakes train maintenance activities across a number of locations. At the time of award, services are required across 11 maintenance sites, although the number of locations covered by the Framework Agreement may increase or decrease during the term of the agreement.

The awarded supplier will provide services including, but not limited to:

  • Removal of liquid waste from waste tanks containing fluids drained from trains, including coolant and oil;
  • Emptying and management of oil/water separators, including sludge, water and oil;
  • Septic tank emptying and waste management;
  • Drainage maintenance and associated services.

The scope of the Framework Agreement also includes:

  • Drain jetting, drain clearance and CCTV surveys in accordance with NTL's lease obligations;
  • Maintaining drainage systems within TrainCare Centre ("TCC") maintenance areas to ensure they remain free from sediment, including sand, and support ongoing engineering operations;
  • Supporting NTL's environmental objectives, including the reduction of waste sent to landfill.

The awarded supplier is responsible for assessing, classifying and managing waste in accordance with applicable waste and hazardous waste regulations, including:

  • Assignment of the appropriate European Waste Catalogue (EWC) code and waste description;
  • Identification and documentation of transportation hazards and associated control measures;
  • Provision of all information required to complete waste consignment notes and waste transfer documentation.

For each waste collection, the supplier shall arrange laboratory analysis of samples through a UKAS-accredited laboratory. The results of the analysis shall be used to support the preparation of the relevant waste consignment documentation and must be provided to the relevant NTL site representative together with the completed consignment note prior to removal of the waste.

  • How the procedure runs: The Tender stages will be run as follows: Stage 1 All interested suppliers may apply to participate in this procurement via https://www.delta‑esourcing.com using Tenderbox Reference: BDGN4R5X52. Optional site visits may be undertaken where applicable. Following submission, Tender Responses will initially be checked for compliance, including that all required returnables for the response have been submitted. If NTL does not consider a Tender Response compliant, it reserves the right not to carry out any further evaluation and eliminate the supplier from the procurement. Compliant Tender Responses will be evaluated in line with the published criteria: Technical Quality (40%), Pricing (50%), and Social Value (10%). NTL will undertake a comprehensive evaluation process to determine the Most Advantageous Tender (MAT). NTL may, at any stage, request clarification on any aspect of a supplier's Tender Response, though it is not obliged to do so. Notwithstanding the foregoing, at any stage following the submission of a Tender Response, NTL may require Negotiation Meetings in which the supplier may be required to present their Tender Response for the purposes of verifying any aspect of that Tender Response. The supplier will be required to make suitable personnel available to NTL in order to resolve NTL's queries. Any clarification discussed at such meetings will be agreed by NTL and the supplier, documented, and submitted by the supplier through the message centre on Delta. Stage 2 (Optional) - Following evaluation of the ITN, NTL may invite the 3 highest‑scoring Tenderers to submit Best and Final Offers (BAFOs). - BAFOs must follow instructions issued via Delta and be based on final Specification, Contract, and Pricing documents. - No amendments to the final‑form contract documents are permitted. - BAFOs will be evaluated using the same criteria and methodology as the original Tender Responses. - Whilst NTL may request BAFOs, suppliers should not rely on any potential subsequent opportunities for providing improved commercial offers.

CPV: Radioactive-, toxic-, medical- and hazardous waste services · Refuse disposal and treatment · Sewage services · Sewerage work

How this framework works

From the published notice
Type
Closed framework
Call-offs
call-offs are awarded directly to appointed suppliers, without further competition
Places
up to 1 suppliers · 3 bids received (3.0 per place) · 1 appointed (full)
Framework period
4 yrs · up to 8 yrs from 1 Jul 2026
Published description of the framework

This framework agreement will be established as a single-supplier arrangement.

NTL will have the ability to directly award contracts to the appointed supplier.

Framework pricing will be based on the successful supplier's final tender submission and will constitute the applicable charges under the agreement.

The lotProcurement structure

single lot · value published
Lot #1AwardedRenewal 4 yrsSMEPublished value£2,600,000
Contract period: 1 Jul 2026 – 1 Jul 2030 (4 yrs) · up to 1 Jul 2034 with extensionsValue: £2,600,000 exc. VAT · £3,120,000 inc. VAT
Delivery: North East, North West, Yorkshire & HumberEligibility: SME eligible
Extensions: NTL may request additional deliverables or services that are not explicitly listed in the scope of this procurement. Where such requirements arise, pricing will be agreed within the relevant work order, subject to the following conditions: -Any pricing related to design, build, or management services must remain consistent with the rates set out in the framework. -All agreed prices must be clearly linked to comparable items already included in the framework pricing schedule. -The appointed supplier will be required to provide supporting evidence to justify the proposed pricing. · The Contract will be let for an initial term of four (4) years. Following the expiry of the initial term, NTL may, at its sole discretion, exercise up to two (2) extension options of two (2) years each (a potential maximum contract duration of eight (8) years). Extensions may be considered where: Service performance has consistently met or exceeded the required KPIs, including compliance, responsiveness, environmental standards, and reporting obligations. Operational continuity is desirable to avoid service disruption, particularly where ongoing site‑specific knowledge or specialist waste-handling expertise is beneficial. Value for money can be demonstrated, including benchmarking or a review showing that the extension period remains commercially advantageous. Regulatory compliance continues to be maintained, with the supplier remaining appropriately licensed for handling, transporting, and disposing of liquid waste. Business needs remain unchanged, and the scope and volume of liquid waste removal services are still required in line with the existing specification. If both extension options are applied, the breakdown is as follows: Initial Term: 4 years Extension Option 1: 2 years Extension Option 2: 2 years Maximum Contract Duration: 8 years total

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored
Quality: 40%Price: 50%Social value: 10%
Published sub-criteria (3)
  • Technical (Quality): 40%
  • Cost: 50%
  • Social Value: 10%
Published award criteria (3)
  • Cost
  • Technical (Quality)
  • Social Value
What this means for your bid
  • Price carries 50 of 100 points: a 10% discount moves about 5 points. This one is won on the number: sharpen the price before polishing the prose.
  • “Liquid Waste Removal and Drainage Services” is a framework: the contest is a place on its panel, up to 1 suppliers, not a single contract, and call-offs are awarded directly: getting appointed is the whole game.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Competitive flexible procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Services
Notice status
Awarded
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Utilities
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
21 Jan 2026, 09:45 GMT
Last source update
11 Aug 2026, 14:45 BST
Award evaluation window
Submission end – 20 May 2026
FTS notice number
2026/S 000-009104
Latest notice
Contract award notice (UK6)
Classification (CPV)
Radioactive-, toxic-, medical- and hazardous waste servicesRefuse disposal and treatmentSewage servicesSewerage work
Delivery area
North East (UKC)North West (UKD)Yorkshire & Humber (UKE)
Official registry OCID
ocds-h6vhtk-060a98 Find a Tender
How it runs

The Tender stages will be run as follows:

Stage 1

All interested suppliers may apply to participate in this procurement via www.xn--deltaesourcing-962h.com ↗ using Tenderbox Reference: BDGN4R5X52.

Optional site visits may be undertaken where applicable.

Following submission, Tender Responses will initially be checked for compliance, including that all required returnables for the response have been submitted. If NTL does not consider a Tender Response compliant, it reserves the right not to carry out any further evaluation and eliminate the supplier from the procurement.

Compliant Tender Responses will be evaluated in line with the published criteria: Technical Quality (40%), Pricing (50%), and Social Value (10%). NTL will undertake a comprehensive evaluation process to determine the Most Advantageous Tender (MAT).

NTL may, at any stage, request clarification on any aspect of a supplier's Tender Response, though it is not obliged to do so. Notwithstanding the foregoing, at any stage following the submission of a Tender Response, NTL may require Negotiation Meetings in which the supplier may be required to present their Tender Response for the purposes of verifying any aspect of that Tender Response. The supplier will be required to make suitable personnel available to NTL in order to resolve NTL's queries.

Any clarification discussed at such meetings will be agreed by NTL and the supplier, documented, and submitted by the supplier through the message centre on Delta.

Stage 2 (Optional)

  • Following evaluation of the ITN, NTL may invite the 3 highest‑scoring Tenderers to submit Best and Final Offers (BAFOs).
  • BAFOs must follow instructions issued via Delta and be based on final Specification, Contract, and Pricing documents.
  • No amendments to the final‑form contract documents are permitted.
  • BAFOs will be evaluated using the same criteria and methodology as the original Tender Responses.
  • Whilst NTL may request BAFOs, suppliers should not rely on any potential subsequent opportunities for providing improved commercial offers.

How it was run

Official notice
Run through: Delta eSourcing · Who buys & how to bid on Delta
Public notice page · account needed to bidElectronic submission allowedLanguage: EN
Access & registration note: Free Select account; no DUNS asked at signup
Appointment period ends
16 Mar 2026, 17:00 GMT
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

www.delta-esourcing.com ↗

Tenderbox Reference: BDGN4R5X52

Timeline

21 Jan 2026 → 20 Aug 2026 · 9 dates
  1. Planning notice published273 days ago
    21 Jan 2026, 09:45 GMT
  2. Next notice expected268 days ago
    26 Jan 2026, 23:59 GMT
  3. Tender notice published261 days ago
    2 Feb 2026, 15:52 GMT
  4. Admission / appointment period ends219 days ago · period end, not a bid countdown
    16 Mar 2026, 17:00 GMT
  5. Award decision expected by154 days ago
    20 May 2026, 23:59 BST
  6. Contract starts113 days ago
    1 Jul 2026, 00:00 BST
  7. Assessment summaries sent72 days ago
    11 Aug 2026, 00:00 BST
  8. Latest notice published71 days ago
    11 Aug 2026, 14:45 BST
  9. Standstill ends62 days ago
    20 Aug 2026, 23:59 BST

Notice history

9 events · 3 releases on Find a Tender · since 21 Jan 2026
  1. Preliminary market engagement notice published
    21 Jan 2026, 09:45 GMT
    UK2
  2. Tender notice published
    2 Feb 2026, 15:52 GMT
    UK4
  3. Published value published: £2,600,000
    2 Feb 2026, 15:52 GMT
  4. Status changed to active
    2 Feb 2026, 15:52 GMT
  5. Procurement method changed
    2 Feb 2026, 15:52 GMT
  6. Deadline published: 16 Mar 2026, 17:00 GMT
    2 Feb 2026, 15:52 GMT
  7. Contract award notice published
    11 Aug 2026, 14:45 BST
    UK6
  8. Status changed to complete
    11 Aug 2026, 14:45 BST
  9. Contract signature expected
    27 Aug 2026, 23:59 BST
    scheduled

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awarded toValueDateStatus
Adler and Allan LtdLiquid Waste Management and Drainage Services - Framework31 Aug 2026 – 30 Aug 2030 · up to 30 Aug 2034Extensions: The Contract will be let for an initial term of four (4) years. Following the expiry of the initial term, NTL may, at its sole discretion, exercise up to two (2) extension options of two (2) years each (a potential maximum contract duration of eight (8) years). Extensions may be considered where: Service performance has consistently met or exceeded the required KPIs, including compliance, responsiveness, environmental standards, and reporting obligations. Operational continuity is desirable to avoid service disruption, particularly where ongoing site‑specific knowledge or specialist waste-handling expertise is beneficial. Value for money can be demonstrated, including benchmarking or a review showing that the extension period remains commercially advantageous. Regulatory compliance continues to be maintained, with the supplier remaining appropriately licensed for handling, transporting, and disposing of liquid waste. Business needs remain unchanged, and the scope and volume of liquid waste removal services are still required in line with the existing specification. If both extension options are applied, the breakdown is as follows: Initial Term: 4 years Extension Option 1: 2 years Extension Option 2: 2 years Maximum Contract Duration: 8 years total · Options: NTL may request additional deliverables or services that are not explicitly listed in the scope of this procurement. Where such requirements arise, pricing will be agreed within the relevant work order, subject to the following conditions: - Any pricing related to design, build, or management services must remain consistent with the rates set out in the framework. - All agreed prices must be clearly linked to comparable items already included in the framework pricing schedule. - The appointed supplier will be required to provide supporting evidence to justify the proposed pricing.£3,912,63011 Aug 2026standstill to 20 Aug 2026Standstill
Adler and Allan LtdLiquid Waste Management and Drainage Services - Call-Off Contract31 Aug 2026 – 30 Aug 2030 · up to 30 Aug 2034Extensions: Extensions may be considered where: Service performance has consistently met or exceeded the required KPIs, including compliance, responsiveness, environmental standards, and reporting obligations. Operational continuity is desirable to avoid service disruption, particularly where ongoing site‑specific knowledge or specialist waste-handling expertise is beneficial. Value for money can be demonstrated, including benchmarking or a review showing that the extension period remains commercially advantageous. Regulatory compliance continues to be maintained, with the supplier remaining appropriately licensed for handling, transporting, and disposing of liquid waste. Business needs remain unchanged, and the scope and volume of liquid waste removal services are still required in line with the existing specification. If both extension options are applied, the breakdown is as follows: Initial Term: 4 years Extension Option 1: 2 years Extension Option 2: 2 years Maximum Contract Duration: 8 years total£3,007,12411 Aug 2026standstill to 20 Aug 2026Standstill

Bid statistics published by the authority

BidsSMEVCSEValid bid range
3final-stage tenders · 5 at stage one20—

Contracting authority & participating public bodies

NORTHERN TRAINS LIMITED

Contracting authorityPublic authority - central government GB-COH: 03076444 · GB-PPON: PZCJ-2164-HJQZ George Stephenson House, York, Yorkshire & Humber, YO1 6JTContact email

Framework contractors & participating bidders

1 commercial party on the notice
  • ADLER & ALLAN LIMITEDFramework contractorGB-COH: 00318460GB-PPON: PHNV-5313-VNXP 80 Station Parade, North Yorkshire, Yorkshire & Humber, HG1 1HQContact email

Official documents & specifications (4)

Official links; attachments are not copied

Notices published for this procedure