Find a TenderAwardedContract details notice
Published 10 Jul 2025, 22:46 BST

Official UK procurement notice

Housing Solutions - Supply and installation of Kitchens and Bathrooms

Official notice

Authority: Housing Solutions (Housing)

WorksOpen procedureAbove thresholdSME suitable
Published estimate£5,200,000≈ £1.7m / year · £6,500,000 inc. VAT
Submissions closed 26 Aug 2025awarded 19 Dec 2025
Awarded to Kincraig Construction Limited
Contract term 3 yrsends 31 Mar 2029 · up to 31 Mar 2031 with extensions · starts 1 Apr 2026

What is being bought

Published requirement description

Scope and delivery of the work

The work consists of replacement kitchens and bathrooms. A local and professional contractor has been sought to supply and fit these consistent with the specification attached and in the case of kitchen replacements, liaise with both Housing Solutions and the kitchen supplier to carry out joint design surveys. We currently install Howdens kitchens (Greenwich Range) and will most likely continue to fit these. However, an alternative pricing option has also been collected for non-Howdens Kitchens (see Appendix 6 - Commercial Response 1 & 2). We do not have a direct relationship with any kitchen manufacturer and expect successful supplier to negotiate their own prices with Howdens and another, being sure to allow for the supply in their basket rates. They will be expected to engage a Resident Liaison Officer (RLO) and will liaise directly with the residents regarding, surveys, installation dates, general updates, correspondents, access arrangements and any issues that arise before, during and after the works.

Programme scale and duration

We intend appointing for an initial contract period of 3 years with the option to extend for a further two years on a 1 + 1 basis. We estimate the value of the contract to be up to £6.5m over the max term of the contract.

Geographical distribution

Housing Solutions was originally formed from transferred Local Authority homes in Maidenhead. These still form the majority of our homes, although there are post-1995 developments in Reading, High Wycombe, Slough, Bracknell, Farnborough, Wokingham, and other locations in Berkshire and Buckinghamshire. Each year, our programme will consist of approximately 200-500 homes across our estate (depending on each year's agreed budget). Around 70% of our stock are within the Maidenhead area, however as above there are some homes in other areas like Reading, Farnborough, Wokingham, Slough, Windsor, Bracknell.

Programming

Generally, we expect to leave programming of the work to the contractor. We may have a small number of high-priority cases needing to be done earlier, but in general we would give them our address list for each

financial year (April to March) and they can determine their own programme to deliver it. We expect that once work on an individual property have commenced, they are completed within 10 working days for kitchens and 8 working days for bathrooms where practicable and these

targets will form part of the KPI suite. The priority is to give the tenant clear timescales, which are met. We would expect essential services (kitchen sink, heating, electricity gas and water) to be restored at the end of each working day.

CDM

We will appoint the Quoin Consultancy as Principal Designer, the successful supplier will be appointed Principal Contractor. They will be expected to prepare the key documents and Quoin will check them against the regulations.

Pricing Model

Works will be priced on basket rates per the attached specification and pricing matrix with variation on M3NHF SOR Version 7.0. As above, there is also a requirement to put forward an additional 'alternative bid' that features another brand (not Howdens).

Pricing:

All relevant pricing is to be submitted via the Pricing Matrix (Appendix 6) as all-inclusive (meaning they must include all aspects required to supply and install full kitchens and bathrooms). To ensure a fair and like-for-like comparison; Tender prices are to be offered and agreed on the basis that pricing will be fixed for the first 2 years of the contract.

Ordering and payment

  • Works will be issued on an individual order and variations must be approved in line with the variations process before they are actioned. Final invoiced amounts must be raised within 2 months of completion, to avoid a backlog of invoices.
  • Invoices will not be processed until all certification has been received (Uploaded into a portal or drop box) including, but not limited to electrical certification (installation & minor works), gas safety certificate, kitchen designs, customers selection surveys and customer satisfaction surveys.
  • You will also be expected to update our works portal (Connect) so the progress of all works can be monitored throughout the duration of the contract.

Form of contract

The form of contract will be the JCT Measured Term Contract (MTC2024)

KPIs

  • Completed Works Programme
  • Install Timeframe
  • Resident Satisfaction
  • Using Agreed Pricing
  • Aftercare (Snagging)
  • Client Handover Pass Rate
  • Client Health & Safety
  • Documents & Compliance Certifications
  • No preliminary market engagement: The project team had anticipated this contracting opportunity to have been advertised in Dec-24 / Jan-25 before PA23 came in. Some initial pre-market engagement conversations took place with existing suppliers for fire and/or H&S related services and some provided feedback on intended approach + draft Service Specification and Pricing Matrix docs. The team therefore felt that no further value would be gleaned by postponing the procurement to undertake any additional pre-market engagement activities in order to produce Notice.

CPV: Articles for the bathroom and kitchen · Bathroom furniture · Bathrooms construction work · Construction work for multi-dwelling buildings and individual houses · Fitted kitchens · Installation of fitted kitchens

The lotProcurement structure

single lot · value published
Lot #1AwardedRenewal 3 yrsSMEPublished value£5,200,000
Contract period: 1 Apr 2026 – 31 Mar 2029 (3 yrs) · up to 31 Mar 2031 with extensionsValue: £5,200,000 exc. VAT · £6,500,000 inc. VAT
Delivery: South EastEligibility: SME eligible
Extensions: Additional remedials, repairs, replacements may be found when on site. There is also an expectation that our DLO will take on approx 50% of overall K&B requirements. However, if their activity level falls below this, more spend is likely to go to the successful bidder/Contractor. · Initial term of 3 years with a option to extend for two further 12 month periods (Max term 5 years).
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    The following Insurances will need to be in place in order for the contract to be awarded:

    Public Liability - £10m

    Employers Liability - £5m

    Professional Indemnity - £1m

    Requirement to adhere to GDPR Regulations.

    Draft JCT contract has been provided in attachments (Appendix 11).

    Financial Capacity will be tested. Please see attached ‘PSQ Economic & Financial Standing Mechanism’ + ‘PSQ Financial Standing Guide’ for how this will be assessed.

  • Technical & professional ability

    The PSQ contains the following Conditions of Participation (Pass/Fail):

    1. Minimum installation experience (5yrs)
    2. Requirement for Contractor (and any Sub-Contractor) to deliver all services under contract inline with Housing Solutions’ Approved Contractor Standards.
    3. Integration with Housing Solutions’ job management system (Connect)
    4. Relevant experience and contract examples.
    5. Requirement to be able to deliver services across HS estate (predominantly Maidenhead) with local office/depot and mobilise quickly.
    6. Requirement to have a Safeguarding Policy in place for Children & Vulnerable Adults.
    7. Requirement to provide assurance on continuity of supply/service from your critical supply-chain (providing at least one of the following: a Business Continuity / Disaster Recovery / Risk Management Plan).
    8. Requirement CDM Regulations adherence & SSIP Membership.
    9. Requirement for 3rd party accreditation - Gas Safe and NICEIC (or equivalent).
    10. Requirement Bribery Act adherence.
    11. Modern Slavery Act adherence.
    12. Requirement to Pass Conflict of Interest checks & Sign PSQ.

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored
Quality: 40%Price: 60%
Published award criteria (2)
  • Quality: 40% weighting has been assigned across 10 x Quality Questions (See ITT Document & Appendix 4B for more information)
  • Price: 60% weighting has been assigned across 6 x Price Categories (See ITT Document & Appendix 6 for more information)
Conditions of participation2
  • Economic & financial standing

    The following Insurances will need to be in place in order for the contract to be awarded:

    Public Liability - £10m

    Employers Liability - £5m

    Professional Indemnity - £1m

    Requirement to adhere to GDPR Regulations.

    Draft JCT contract has been provided in attachments (Appendix 11).

    Financial Capacity will be tested. Please see attached ‘PSQ Economic & Financial Standing Mechanism’ + ‘PSQ Financial Standing Guide’ for how this will be assessed.

  • Technical & professional ability

    The PSQ contains the following Conditions of Participation (Pass/Fail):

    1. Minimum installation experience (5yrs)
    2. Requirement for Contractor (and any Sub-Contractor) to deliver all services under contract inline with Housing Solutions’ Approved Contractor Standards.
    3. Integration with Housing Solutions’ job management system (Connect)
    4. Relevant experience and contract examples.
    5. Requirement to be able to deliver services across HS estate (predominantly Maidenhead) with local office/depot and mobilise quickly.
    6. Requirement to have a Safeguarding Policy in place for Children & Vulnerable Adults.
    7. Requirement to provide assurance on continuity of supply/service from your critical supply-chain (providing at least one of the following: a Business Continuity / Disaster Recovery / Risk Management Plan).
    8. Requirement CDM Regulations adherence & SSIP Membership.
    9. Requirement for 3rd party accreditation - Gas Safe and NICEIC (or equivalent).
    10. Requirement Bribery Act adherence.
    11. Modern Slavery Act adherence.
    12. Requirement to Pass Conflict of Interest checks & Sign PSQ.
What this means for your bid
  • Price carries 60 of 100 points: a 10% discount moves about 6 points. This one is won on the number: sharpen the price before polishing the prose.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Open procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Works
Notice status
Awarded
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
10 Jul 2025, 22:46 BST
Last source update
25 Feb 2026, 09:14 GMT
Award evaluation window
Submission end – 22 Dec 2025
Authority reference
KB2025
FTS notice number
2025/S 000-039100
Latest notice
Contract details notice (UK7)
Classification (CPV)
Articles for the bathroom and kitchenBathroom furnitureBathrooms construction workConstruction work for multi-dwelling buildings and individual housesFitted kitchensInstallation of fitted kitchens
Delivery area
South East (UKJ)
Official registry OCID
ocds-h6vhtk-055d42 Find a Tender
Review and risk notes
Risks

Budgets are approved on an annual basis, and replacement activity / spend could go up or down during the life of the contract. HS will aim to work closely with the successful bidder/Contractor + plan a year in advance.

The DLO is anticipated to cover approx 50% of the overall K&B requirements. However, if their activity level falls below this, additional spend/activity is likely to go to the successful bidder/Contractor.

How it was run

Official notice
Run through: mytenders · Who buys & how to bid on myTenders
Supplier login requiredElectronic submission allowedLanguage: EN
Access & registration note: Free publication showcase; bidding happens on buyer portals
Submission deadline
26 Aug 2025, 12:00 BST
Clarification deadline
15 Aug 2025, 12:00 BST
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

Timeline

10 Jul 2025 → 1 Apr 2026 · 8 dates
  1. Tender notice published
    10 Jul 2025, 22:46 BST
  2. Clarification questions by
    15 Aug 2025, 12:00 BST
  3. Submission deadline
    26 Aug 2025, 12:00 BST
  4. Assessment summaries sent308 days ago
    19 Dec 2025
  5. Award decision expected by304 days ago
    22 Dec 2025, 23:59 GMT
  6. Standstill ends290 days ago
    5 Jan 2026, 23:59 GMT
  7. Latest notice published240 days ago
    25 Feb 2026, 09:14 GMT
  8. Contract starts205 days ago
    1 Apr 2026, 00:00 BST

Notice history

5 events · 3 releases on Find a Tender · since 10 Jul 2025
  1. Tender notice published
    10 Jul 2025, 22:46 BST
    UK4
  2. Contract award notice published
    19 Dec 2025, 16:57 GMT
    UK6
  3. Status changed to complete
    19 Dec 2025, 16:57 GMT
  4. Contract signature expected
    30 Jan 2026, 23:59 GMT
    scheduled
  5. Contract details notice published
    25 Feb 2026, 09:14 GMT
    UK7

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awards 1
Awarded value £5,200,0001 award exc. VAT
Bids received 106 from SMEs
Named bidders 10published on the award notice
Contracts signed 1latest 29 Jan 2026
Awarded toValueDateStatus
Kincraig Construction LimitedSME1 Apr 2026 – 31 Mar 2029 · up to 31 Mar 2031Extensions: The initial term is expected to be 3 years with an option to extend for a further 2 x 12 month periods (5 years max term) · Options: 1) Pricing was collected on a Howdens and Non-Howdens Kitchen basis. As the successful tenderer scored the highest in both scenarios, HS reserves the right to use both pricing options in contract and will explore these options throughout the term of the contract. 2) All kitchen and bathroom replacement works should fall within the scope of this contract. Additionally, there may be instances where the appointed contractor may also deliver additional installation services to cover void properties as and when required (which are at this time an unknown variable). 3) In order to calculate the estimated contract value across the maximum term of 5yrs, we initially took a forecast from our 5yr business plan which indicated around £13m of spend required for all activities over the desired term, with Director intentions confirmed as allocating half to in-house provision via our DLO. This produced a max term contract value of £6,500,000 (inclusive of VAT). Whilst this is our current intention, it is subject to successful recruitment exercises and achieving an increase in our DLO resource (otherwise, contract spend is likely to increase to accommodate more replacements).£5,200,00019 Dec 2025Awarded

Contracts

  • Housing Solutions - Supply and installation of Kitchens and Bathrooms · Kincraig Construction LimitedSME

    Signed
    29 Jan 2026
    Value
    £5,200,000
    Period
    1 Apr 2026 – 31 Mar 2029 · up to 31 Mar 2031 with extensions
    Status
    active
    Extensions
    The initial term is expected to be 3 years with an option to extend for a further 2 x 12 month periods (5 years max term)
    Options
    The right to additional purchases while the contract is valid. 1) Pricing was collected on a Howdens and Non-Howdens Kitchen basis. As the successful tenderer scored the highest in both scenarios, HS reserves the right to use both pricing options in contract and will explore these options throughout the term of the contract. 2) All kitchen and bathroom replacement works should fall within the scope of this contract. Additionally, there may be instances where the appointed contractor may also deliver additional installation services to cover void properties as and when required (which are at this time an unknown variable). 3) In order to calculate the estimated contract value across the maximum term of 5yrs, we initially took a forecast from our 5yr business plan which indicated around £13m of spend required for all activities over the desired term, with Director intentions confirmed as allocating half to in-house provision via our DLO. This produced a max term contract value of £6,500,000 (inclusive of VAT). Whilst this is our current intention, it is subject to successful recruitment exercises and achieving an increase in our DLO resource (otherwise, contract spend is likely to increase to accommodate more replacements).
    8 agreed KPIs: Completed Works Programme · Install Timeframe · Resident Satisfaction …
    • Completed Works Programme
    • Install Timeframe
    • Resident Satisfaction
    • Using Agreed Pricing
    • Aftercare (Snagging)
    • Client Handover Pass Rate
    • Client Health and Safety
    • Documents & Compliance Certifications

Bid statistics published by the authority

BidsSMEVCSEValid bid range
10final-stage tenders · 14 at stage one60—

Who bid

Bidders as named on the Procurement Act 2023 award notice. “Won” means the bidder holds an award on this notice.

Contracting authority & participating public bodies

Housing Solutions

Contracting authorityPublic undertaking GB-PPON: PGDY-4627-RBZL Crown House, Crown Square, Berkshire, South East, SL6 8BYContact name, email, phone

Bidders & participating suppliers

10 commercial parties on the notice · 1 awarded
  • Ash Contracting LtdBidder / tendererGB-PPON: PZLL-6191-RJMD Unit 4, The Courtyard Business Centre, Birling Road, WEST MALLING, South East, ME19 5AA
  • D R Jones Yeovil LtdBidder / tendererGB-PPON: PVVC-9833-HHJZ Willow House - Artillery Road, Yeovil, South West, BA22 8RP
  • Eric Group LtdBidder / tendererGB-PPON: PPJM-5577-BCVN 4 Snowford Close, Luton, East of England, LU3 3XU
  • Hankinson Whittle LtdBidder / tendererGB-PPON: PZRY-6721-ZWXT Unit 2 - North Cheshire Trading Estate, Prenton Way, , Prenton, North West, CH43 3EA
  • Kincraig Construction LtdAwarded supplierGB-PPON: PBHJ-3267-ZRYY ST Nicholas House - 4-6 Portesbery Road, Camberley, South East, GU15 3TAContact email
  • Mullen Property Services LtdBidder / tendererGB-PPON: PGVT-5685-MMWD Terminal House, Shepperton, South East, TW17 8AS
  • PFL Electrical LtdBidder / tendererGB-PPON: PMZG-7678-VCML 130 Shaftesbury Avenue, London, London, W1D 5EU
  • PiLon LtdBidder / tendererGB-PPON: PJRR-7678-ZPWD Suite 4b, Columbia, Bracknell, South East, RG12 1LP
  • R.Benson Property Maintenance LtdBidder / tendererGB-PPON: PPGV-7628-XQNM Unit 1 Anglo Business Park, Asheridge Road, Chesham, South East, HP5 2QA
  • Topcoat Construction Limited T/A TCL GroupBidder / tendererGB-PPON: PZDN-9888-RDRM Unit A Melville Court, Spilsby Road, Harold Hill, Romford, London, RM3 8SB

Official documents & specifications (31)

Official links; attachments are not copied

Tender pack and attachments

Show 18 more documents

Notices published for this procedure

  • Contract details notice contractContract details noticeUK7Contract details notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender

2 further documents are listed in the JSON mirror.