Find a TenderAwardedContract details notice
Published 1 May 2025, 10:44 BST

Official UK procurement notice

Framework for Applied Science Technology Engineering Requirements (FASTER)

Official notice

Authority: Met Office (Central government)

Open framework scheme5 lotsServicesOpen procedureAbove thresholdSME suitable
Sectors: Research & Development (R&D) (73) Delivery: UK
Framework ceiling (notional)£45,600,000total for 5 lots · framework ceiling, not attributable revenue · 1 value update
Submissions closed 3 Dec 2025awarded 1 Apr 2026
Awarded to Imperial College Projects Ltd +18 more5 awards
Framework period 3 yrsends 31 Mar 2029 · up to 31 Mar 2034 with extensions · starts 1 Apr 2026

What is being bought5 lots · detail below

Published requirement description

A services framework. The FASTER will be the principal mechanism by which the Met Office seeks to secure skills and capacity from Industrial and Academic Institutions in support of the delivery of Met Office requirements relating to the application of weather and climate science. FASTER covers the use of scientific techniques and knowledge alongside technology solutions to explore and understand real world questions and challenges experienced by customers and end users of our weather and climate information and subsequently develop mitigation approaches and prototype solutions.

  • The authority expects to re-tender this requirement around 1 Sept 2028, 23:59 BST.

CPV: Design and execution of research and development · Research and experimental development services

How this framework works

From the published notice
Type
Closed framework · open framework scheme (admission reopens)
Call-offs
every call-off is a further competition among the appointed suppliers
Bids received
42 bids on the busiest of 5 lots · 44 suppliers appointed
Framework period
3 yrs · up to 8 yrs from 1 Apr 2026
Scheme runs until
23 Apr 2034
Supplier levy on call-offs (max %)
NA
Published description of the framework

FASTER must be re-opened within the first 3-year period in line with the indicative timetable below:

Establishment of FASTER 24 April 2026

FASTER is reopened for the first time 1st September 2028 FASTER stage 2 Goes Live 24 April 2029

FASTER is reopened for the second time 1st September 2031 FASTER stage 3 Goes Live 24 April 2032

Framework Ceases 23 April 2034

**Noting that the framework re-opening procurement process time is estimated to be approx. 6 months.

Call-offs published through it3

Notices that name this framework as their framework in the official record. Many call-offs are never published, so this is a floor, not utilisation.

Lots and requirements (5)Procurement structure

5 lots · all with a published value · same conditions of participation on every lot · same evaluation weights on every lot

Every one of these 5 lots carries the same published figure, £45,600,000: it is the framework's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.

Lot #1ObservationsAwardedRenewal 3 yrsSMEceiling above

The source published no individual description for this lot.

Contract period: 1 Apr 2026 – 31 Mar 2029 (3 yrs) · up to 31 Mar 2034 with extensions
Delivery: UKEligibility: SME eligible
Extensions: Met Office intends to re-open FASTER twice during the 8-year (maximum) life of the framework which is a new option available under PA23. FASTER will be re-opened within the first 3-year period in line with the indicative timetable below: Establishment of FASTER 1st April 2026 FASTER is reopened for the first time 1st September 2028 FASTER stage 2 Goes Live 1st April 2029 FASTER is reopened for the second time 1st September 2031 FASTER stage 3 Goes Live 1 April 2032 Framework Ceases 31 March 2034 **Noting that the framework re-opening procurement process time is estimated to be approx. 6 months. The Open Framework will operate as follows: Suppliers who are already on the Framework 1. A supplier on the existing framework will not be required to submit a new bid on the re-opening of the procurement (unless it opts to do so). However the supplier will be required to confirm that the original bid submitted is still valid including the PSQ and ITT information (in line with s.22 of the Act). If not, valid suppliers will be required to update and resubmit the relevant information for review at each Framework opening stage. 2. A supplier may submit a new bid for any of the Framework Lots it is not already on, which will be assessed with the other bids when the Framework re-opens. 3. A supplier can elect to be removed from existing Lots or the existing framework entirely. 4. A supplier has the opportunity to re-submit hourly rates if they want to remain on the framework, these will be evaluated in the same way as the process of gaining a place on the FASTER framework and the previous technical scores will be used unless a new bid is submitted. PQP will apply and a score of 6 or less will ensure the supplier remains on the framework. New Suppliers to the Framework If early market engagement is deemed appropriate a PME notice will be issued. A tender notice (UK:4) will be issued each time the Framework is opened (twice in the life of FASTER) and this will be linked to the unique identifier (UI) used in the Procurement of the original FASTER Framework within the Central Digital Platform (CPD). Any new bids will be evaluated on the same basis as the original PSQ and Evaluation criteria (Technical, Commercial and Social Value) the same weightings and questions will apply. It is not anticipated that any changes to the evaluation criteria will be required in line with PA23 which states that there should be no substantial amendments to the award criteria. Debarment checks will also be required in line with the original process. FASTER will be live throughout any opening process. Once the re-opening process has been completed and awarded the second stage of FASTER will commence.
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    See PSQ

  • Technical & professional ability

    Technical ability is covered in the tender

Lot #2Prediction and ProjectionAwardedRenewal 3 yrsSMEceiling above

The source published no individual description for this lot.

Contract period: 1 Apr 2026 – 31 Mar 2029 (3 yrs) · up to 31 Mar 2034 with extensions
Delivery: UKEligibility: SME eligible
Extensions: Met Office intends to re-open FASTER twice during the 8-year (maximum) life of the framework which is a new option available under PA23. FASTER will be re-opened within the first 3-year period in line with the indicative timetable below: Establishment of FASTER 1st April 2026 FASTER is reopened for the first time 1st September 2028 FASTER stage 2 Goes Live 1st April 2029 FASTER is reopened for the second time 1st September 2031 FASTER stage 3 Goes Live 1 April 2032 Framework Ceases 31 March 2034 **Noting that the framework re-opening procurement process time is estimated to be approx. 6 months. The Open Framework will operate as follows: Suppliers who are already on the Framework 1. A supplier on the existing framework will not be required to submit a new bid on the re-opening of the procurement (unless it opts to do so). However the supplier will be required to confirm that the original bid submitted is still valid including the PSQ and ITT information (in line with s.22 of the Act). If not, valid suppliers will be required to update and resubmit the relevant information for review at each Framework opening stage. 2. A supplier may submit a new bid for any of the Framework Lots it is not already on, which will be assessed with the other bids when the Framework re-opens. 3. A supplier can elect to be removed from existing Lots or the existing framework entirely. 4. A supplier has the opportunity to re-submit hourly rates if they want to remain on the framework, these will be evaluated in the same way as the process of gaining a place on the FASTER framework and the previous technical scores will be used unless a new bid is submitted. PQP will apply and a score of 6 or less will ensure the supplier remains on the framework. New Suppliers to the Framework If early market engagement is deemed appropriate a PME notice will be issued. A tender notice (UK:4) will be issued each time the Framework is opened (twice in the life of FASTER) and this will be linked to the unique identifier (UI) used in the Procurement of the original FASTER Framework within the Central Digital Platform (CPD). Any new bids will be evaluated on the same basis as the original PSQ and Evaluation criteria (Technical, Commercial and Social Value) the same weightings and questions will apply. It is not anticipated that any changes to the evaluation criteria will be required in line with PA23 which states that there should be no substantial amendments to the award criteria. Debarment checks will also be required in line with the original process. FASTER will be live throughout any opening process. Once the re-opening process has been completed and awarded the second stage of FASTER will commence.
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    See PSQ

  • Technical & professional ability

    Technical ability is covered in the tender

Lot #3Post Processing and AnalysisAwardedRenewal 3 yrsSMEceiling above

The source published no individual description for this lot.

Contract period: 1 Apr 2026 – 31 Mar 2029 (3 yrs) · up to 31 Mar 2034 with extensions
Delivery: UKEligibility: SME eligible
Extensions: Met Office intends to re-open FASTER twice during the 8-year (maximum) life of the framework which is a new option available under PA23. FASTER will be re-opened within the first 3-year period in line with the indicative timetable below: Establishment of FASTER 1st April 2026 FASTER is reopened for the first time 1st September 2028 FASTER stage 2 Goes Live 1st April 2029 FASTER is reopened for the second time 1st September 2031 FASTER stage 3 Goes Live 1 April 2032 Framework Ceases 31 March 2034 **Noting that the framework re-opening procurement process time is estimated to be approx. 6 months. The Open Framework will operate as follows: Suppliers who are already on the Framework 1. A supplier on the existing framework will not be required to submit a new bid on the re-opening of the procurement (unless it opts to do so). However the supplier will be required to confirm that the original bid submitted is still valid including the PSQ and ITT information (in line with s.22 of the Act). If not, valid suppliers will be required to update and resubmit the relevant information for review at each Framework opening stage. 2. A supplier may submit a new bid for any of the Framework Lots it is not already on, which will be assessed with the other bids when the Framework re-opens. 3. A supplier can elect to be removed from existing Lots or the existing framework entirely. 4. A supplier has the opportunity to re-submit hourly rates if they want to remain on the framework, these will be evaluated in the same way as the process of gaining a place on the FASTER framework and the previous technical scores will be used unless a new bid is submitted. PQP will apply and a score of 6 or less will ensure the supplier remains on the framework. New Suppliers to the Framework If early market engagement is deemed appropriate a PME notice will be issued. A tender notice (UK:4) will be issued each time the Framework is opened (twice in the life of FASTER) and this will be linked to the unique identifier (UI) used in the Procurement of the original FASTER Framework within the Central Digital Platform (CPD). Any new bids will be evaluated on the same basis as the original PSQ and Evaluation criteria (Technical, Commercial and Social Value) the same weightings and questions will apply. It is not anticipated that any changes to the evaluation criteria will be required in line with PA23 which states that there should be no substantial amendments to the award criteria. Debarment checks will also be required in line with the original process. FASTER will be live throughout any opening process. Once the re-opening process has been completed and awarded the second stage of FASTER will commence.
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    See PSQ

  • Technical & professional ability

    Technical ability is covered in the tender

Lot #4Production & Customer DeliveryAwardedRenewal 3 yrsSMEceiling above

The source published no individual description for this lot.

Contract period: 1 Apr 2026 – 31 Mar 2029 (3 yrs) · up to 31 Mar 2034 with extensions
Delivery: UKEligibility: SME eligible
Extensions: Met Office intends to re-open FASTER twice during the 8-year (maximum) life of the framework which is a new option available under PA23. FASTER will be re-opened within the first 3-year period in line with the indicative timetable below: Establishment of FASTER 1st April 2026 FASTER is reopened for the first time 1st September 2028 FASTER stage 2 Goes Live 1st April 2029 FASTER is reopened for the second time 1st September 2031 FASTER stage 3 Goes Live 1 April 2032 Framework Ceases 31 March 2034 **Noting that the framework re-opening procurement process time is estimated to be approx. 6 months. The Open Framework will operate as follows: Suppliers who are already on the Framework 1. A supplier on the existing framework will not be required to submit a new bid on the re-opening of the procurement (unless it opts to do so). However the supplier will be required to confirm that the original bid submitted is still valid including the PSQ and ITT information (in line with s.22 of the Act). If not, valid suppliers will be required to update and resubmit the relevant information for review at each Framework opening stage. 2. A supplier may submit a new bid for any of the Framework Lots it is not already on, which will be assessed with the other bids when the Framework re-opens. 3. A supplier can elect to be removed from existing Lots or the existing framework entirely. 4. A supplier has the opportunity to re-submit hourly rates if they want to remain on the framework, these will be evaluated in the same way as the process of gaining a place on the FASTER framework and the previous technical scores will be used unless a new bid is submitted. PQP will apply and a score of 6 or less will ensure the supplier remains on the framework. New Suppliers to the Framework If early market engagement is deemed appropriate a PME notice will be issued. A tender notice (UK:4) will be issued each time the Framework is opened (twice in the life of FASTER) and this will be linked to the unique identifier (UI) used in the Procurement of the original FASTER Framework within the Central Digital Platform (CPD). Any new bids will be evaluated on the same basis as the original PSQ and Evaluation criteria (Technical, Commercial and Social Value) the same weightings and questions will apply. It is not anticipated that any changes to the evaluation criteria will be required in line with PA23 which states that there should be no substantial amendments to the award criteria. Debarment checks will also be required in line with the original process. FASTER will be live throughout any opening process. Once the re-opening process has been completed and awarded the second stage of FASTER will commence.
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    See PSQ

  • Technical & professional ability

    Technical ability is covered in the tender

Lot #5Customer ExperienceAwardedRenewal 3 yrsSMEceiling above

The source published no individual description for this lot.

Contract period: 1 Apr 2026 – 31 Mar 2029 (3 yrs) · up to 31 Mar 2034 with extensions
Delivery: UKEligibility: SME eligible
Extensions: Met Office intends to re-open FASTER twice during the 8-year (maximum) life of the framework which is a new option available under PA23. FASTER will be re-opened within the first 3-year period in line with the indicative timetable below: Establishment of FASTER 1st April 2026 FASTER is reopened for the first time 1st September 2028 FASTER stage 2 Goes Live 1st April 2029 FASTER is reopened for the second time 1st September 2031 FASTER stage 3 Goes Live 1 April 2032 Framework Ceases 31 March 2034 **Noting that the framework re-opening procurement process time is estimated to be approx. 6 months. The Open Framework will operate as follows: Suppliers who are already on the Framework 1. A supplier on the existing framework will not be required to submit a new bid on the re-opening of the procurement (unless it opts to do so). However the supplier will be required to confirm that the original bid submitted is still valid including the PSQ and ITT information (in line with s.22 of the Act). If not, valid suppliers will be required to update and resubmit the relevant information for review at each Framework opening stage. 2. A supplier may submit a new bid for any of the Framework Lots it is not already on, which will be assessed with the other bids when the Framework re-opens. 3. A supplier can elect to be removed from existing Lots or the existing framework entirely. 4. A supplier has the opportunity to re-submit hourly rates if they want to remain on the framework, these will be evaluated in the same way as the process of gaining a place on the FASTER framework and the previous technical scores will be used unless a new bid is submitted. PQP will apply and a score of 6 or less will ensure the supplier remains on the framework. New Suppliers to the Framework If early market engagement is deemed appropriate a PME notice will be issued. A tender notice (UK:4) will be issued each time the Framework is opened (twice in the life of FASTER) and this will be linked to the unique identifier (UI) used in the Procurement of the original FASTER Framework within the Central Digital Platform (CPD). Any new bids will be evaluated on the same basis as the original PSQ and Evaluation criteria (Technical, Commercial and Social Value) the same weightings and questions will apply. It is not anticipated that any changes to the evaluation criteria will be required in line with PA23 which states that there should be no substantial amendments to the award criteria. Debarment checks will also be required in line with the original process. FASTER will be live throughout any opening process. Once the re-opening process has been completed and awarded the second stage of FASTER will commence.
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    See PSQ

  • Technical & professional ability

    Technical ability is covered in the tender

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored · same split on all 5 lots
Quality: 90%Social value: 10%
Published sub-criteria (6)
  • Technical Competence: 30%
  • Approach to Delivery: 30%
  • Contract Management and Managing Risk: 15%
  • Driving efficiencies in contracts: 15%
  • Social Value MAC 4b: 5%
  • Social Value MAC 8a: 5%
Published award criteria (6)
  • Technical Competence
  • Approach to Delivery
  • Contract Management and Managing Risk
  • Driving efficiencies in contracts
  • Social Value MAC 4b
  • Social Value MAC 8a
Lot distribution rule: Suppliers can bid for any number of Lots
Conditions of participation · identical on every lot2
  • Economic & financial standing

    See PSQ

  • Technical & professional ability

    Technical ability is covered in the tender

What this means for your bid
  • “Framework for Applied Science Technology Engineering Requirements…” is a framework: the contest is a place on its panel, not a single contract: each call-off is a further competition, so the pricing contest starts after appointment.

Procedure terms & legal framework

From the official record
Procedure method
Open procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Services
Notice status
Awarded
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Standard
Commercial structure
Open framework scheme
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
Yes · next expected 1 Sept 2028
First published
1 May 2025, 10:44 BST
Last source update
18 May 2026, 18:29 BST
Award evaluation window
Submission end – 1 Apr 2026
Authority reference
DN772326
FTS notice number
2025/S 000-067355
Latest notice
Contract details notice (UK7)
Classification (CPV)
Design and execution of research and developmentResearch and experimental development services
Delivery area
UK
Official registry OCID
ocds-h6vhtk-050b18 Find a Tender

How it was run

Official notice
Run through: ProContract (Due North) · Who buys & how to bid on ProContract
Supplier login requiredElectronic submission allowedLanguage: EN
Access & registration note: Free · short registration with manual review; public opportunity list
Appointment period ends
3 Dec 2025, 12:00 GMT
Clarification deadline
21 Nov 2025, 12:00 GMT
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Supplier levy on call-offs (max %)
call-off levy · NA
Detailed submission instructions & authority contactsFrom official release

Tenders must be submitted through the Proactis/ProContract tendering portal. Tender documents can also be found here:

procontract.due-north.com/Opportunities/Index ↗

Select Met Office portal on the top left hand side of the screen and then look for the FASTER opportunity. Click on this express your interest and you will be able to acess the tender documents.

Timeline

1 May 2025 → 18 May 2026 · 10 dates
  1. Planning notice published
    1 May 2025, 10:44 BST
  2. Market engagement385 days ago
    30 Sept 2025, 23:59 BST

    Met Office is about to commence market engagement activities to shape its thinking relating to sourcing the Framework for Applied Science Technology & Engineering Requirements (FASTER).

    The Proactis EOI stage, through Proactis will go live on the 9 May 2025.

    Any interested suppliers are asked to register their organisation on Proactis if they haven't already

    procontract.due-north.com/Advert ↗

    Suppliers need to register their interest by pressing the EOI button once the EOI is live (7 May). There will be an on-line event via MS Teams on 5 June 9am -12 Noon to provide an overview of the Framework requirements. This will also be a chance for suppliers to ask questions. All Q&A will be submitted through the Proactis Portal.

    Once an EOI is submitted please provide via the Proactis messaging system who will be attending from your organisation (up to 2 representatives) or by completing the box in the form and sending the form back to us through Proactis. This session will be run via MS Teams. If for any reason you cannot make the session we will collate an anonymised transcript and Q&A and make this available to all interested suppliers through the Proactis Portal.

    The intention is also to have a Face to Face event in the Autumn 2025. Exact details of this will be issued in due course through the Proactis Portal.

  3. Tender notice published363 days ago
    22 Oct 2025, 10:14 BST
  4. Next notice expected353 days ago
    31 Oct 2025, 23:59 GMT
  5. Clarification questions by333 days ago
    21 Nov 2025, 12:00 GMT
  6. Admission / appointment period ends321 days ago · period end, not a bid countdown
    3 Dec 2025, 12:00 GMT
  7. Assessment summaries sent203 days ago
    1 Apr 2026, 00:00 BST
  8. Contract starts203 days ago
    1 Apr 2026, 00:00 BST
  9. Award decision expected by202 days ago
    1 Apr 2026, 23:59 BST
  10. Latest notice published155 days ago
    18 May 2026, 18:29 BST

Notice history

13 events · 8 releases on Find a Tender · since 1 May 2025
  1. Pipeline notice published
    1 May 2025, 10:44 BST
    UK1
  2. Preliminary market engagement notice published
    2 May 2025, 09:15 BST
    UK2
  3. Preliminary market engagement notice published
    7 May 2025, 14:27 BST
    UK2
  4. Pipeline notice published
    13 May 2025, 14:58 BST
    UK1
  5. Preliminary market engagement notice published
    13 May 2025, 15:03 BST
    UK2
  6. Tender notice published
    22 Oct 2025, 10:14 BST
    UK4
  7. Published value updated to £45,600,000
    22 Oct 2025, 10:14 BST
    was £27,000,000
  8. Status changed to active
    22 Oct 2025, 10:14 BST
  9. Deadline published: 3 Dec 2025, 12:00 GMT
    22 Oct 2025, 10:14 BST
  10. Contract award notice published
    8 Apr 2026, 10:09 BST
    UK6
  11. Status changed to complete
    8 Apr 2026, 10:09 BST
  12. Contract signature expected
    23 Apr 2026, 23:59 BST
    scheduled
  13. Contract details notice published
    18 May 2026, 18:29 BST
    UK7
Published amendments (2)

1. A link has now been included linking directly to Proactis - copy this link and paste into your search engine to take you directly to the opportunity to register your interest and download the EME document.

Removed UK

Routine re-releases (8)
  • 2025-05: 5 releases · 1 May 2025, 13 May 2025

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Suppliers appointed 445 awards · see the list ↓
Bids received 4213 from SMEs · busiest of 5 lots
Named bidders 56published on the award notice
Contracts signed 5latest 23 Apr 2026

£9,120,000 is the framework's published maximum, restated by the publisher on 5 award rows. It is one ceiling, not 5 separate sums, and no share per lot is published; those rows read “ceiling above”.

Awarded toValueDateStatus
Lot 1 · Observations1 award
Imperial College Projects LtdSME, Mirion Technologies (CANBERRA UK) LtdSMEVCSE, National Oceanography Centre Innovations LimitedSME, THE UNIVERSITY OF LEEDS, UCL Consultants Limited, UNIVERSITY OF READING +11 more24 Apr 2026 – 23 Apr 2029 · up to 23 Apr 2034Extensions: FASTER must be re-opened within the first 3-year period in line with the indicative timetable below: Establishment of FASTER 24 April 2026 FASTER is reopened for the first time 1st September 2028 FASTER stage 2 Goes Live 24 April 2029 FASTER is reopened for the second time 1st September 2031 FASTER stage 3 Goes Live 24 April 2032 Framework Ceases 23 April 2034 **Noting that the framework re-opening procurement process time is estimated to be approx. 6 months.ceiling above1 Apr 2026Awarded
Lot 2 · Prediction and Projection1 award
HR Wallingford Ltd, Jeremy Benn Associates LtdSME, National Oceanography Centre Innovations LimitedSME, THE UNIVERSITY OF LEEDS, The Alan Turing Institute, UCL Consultants Limited +14 more24 Apr 2026 – 23 Apr 2029 · up to 23 Apr 2034Extensions: FASTER must be re-opened within the first 3-year period in line with the indicative timetable below: Establishment of FASTER 24 April 2026 FASTER is reopened for the first time 1st September 2028 FASTER stage 2 Goes Live 24 April 2029 FASTER is reopened for the second time 1st September 2031 FASTER stage 3 Goes Live 24 April 2032 Framework Ceases 23 April 2034 **Noting that the framework re-opening procurement process time is estimated to be approx. 6 months.ceiling above1 Apr 2026Awarded
Lot 3 · Post Processing and Analysis1 award
BAE Systems Applied Intelligence Limited, HR Wallingford Ltd, Imperial College Projects LtdSME, Jeremy Benn Associates LtdSME, THE UNIVERSITY OF LEEDS, UNIVERSITY OF READING +25 more24 Apr 2026 – 23 Apr 2029 · up to 23 Apr 2034Extensions: FASTER must be re-opened within the first 3-year period in line with the indicative timetable below: Establishment of FASTER 24 April 2026 FASTER is reopened for the first time 1st September 2028 FASTER stage 2 Goes Live 24 April 2029 FASTER is reopened for the second time 1st September 2031 FASTER stage 3 Goes Live 24 April 2032 Framework Ceases 23 April 2034 **Noting that the framework re-opening procurement process time is estimated to be approx. 6 months.ceiling above1 Apr 2026Awarded
Lot 4 · Production & Customer Delivery1 award
BAE Systems Applied Intelligence Limited, HR Wallingford Ltd, Jeremy Benn Associates LtdSME, National Oceanography Centre Innovations LimitedSME, Oxidian Ltd, THE UNIVERSITY OF LEEDS +16 more24 Apr 2026 – 23 Apr 2029 · up to 23 Apr 2034Extensions: FASTER must be re-opened within the first 3-year period in line with the indicative timetable below: Establishment of FASTER 24 April 2026 FASTER is reopened for the first time 1st September 2028 FASTER stage 2 Goes Live 24 April 2029 FASTER is reopened for the second time 1st September 2031 FASTER stage 3 Goes Live 24 April 2032 Framework Ceases 23 April 2034 **Noting that the framework re-opening procurement process time is estimated to be approx. 6 months.ceiling above1 Apr 2026Awarded
Lot 5 · Customer Experience1 award
Axion Solutions LtdSME, BAE Systems Applied Intelligence Limited, CACI Ltd, Frazer-Nash Consultancy Limited, Hitch Marketing LtdSME, Jeremy Benn Associates LtdSME +5 more24 Apr 2026 – 23 Apr 2029 · up to 23 Apr 2034Extensions: FASTER must be re-opened within the first 3-year period in line with the indicative timetable below: Establishment of FASTER 24 April 2026 FASTER is reopened for the first time 1st September 2028 FASTER stage 2 Goes Live 24 April 2029 FASTER is reopened for the second time 1st September 2031 FASTER stage 3 Goes Live 24 April 2032 Framework Ceases 23 April 2034 **Noting that the framework re-opening procurement process time is estimated to be approx. 6 months.ceiling above1 Apr 2026Awarded

Contracts

All 5 of these contracts carry the same published figure, £9,120,000, the framework's maximum for the whole notice, not each contract's own value. They are not eleven separate sums.

Bid statistics published by the authority

LotBidsSMEVCSEValid bid range
1 · Observations26final-stage tenders80—
2 · Prediction and Projection35final-stage tenders80—
3 · Post Processing and Analysis42final-stage tenders130—
4 · Production & Customer Delivery28final-stage tenders80—
5 · Customer Experience21final-stage tenders70—

Who bid

Bidders as named on the Procurement Act 2023 award notice. “Won” means the bidder holds an award on this notice.

Contracting authority & participating public bodies

Met Office

Contracting authorityPublic authority - central government GB-PPON: PVZW-3234-DTLY Met Office, Exeter, South West, EX1 3PBContact email

Framework contractors & participating bidders

56 commercial parties on the notice · 40 awarded

The first 50 of 56 commercial parties (by name); the JSON mirror lists them all.

  • AFRY Soulutions UK LtdFramework contractorGB-PPON: PLDG-4388-CJYH 920 Birchwood Boulevard, Warrington, North West, WA3 7QSContact email
  • Advai-LtdFramework contractorGB-PPON: PNLC-3435-LCMD 20-22 Wenlock Road, London, London, N1 7GUContact email
  • Aeris-UK LimitedFramework contractorGB-PPON: PXMR-7876-ZMCH 107 Hartswood Road, London, London, W12 9NGContact email
  • Aspinall InstrumentsFramework contractorGB-PPON: PZHL-4854-JXLN 5 Leach House Lane, Lancaster, North West, LA2 0RTContact email
  • Assimila LimitedFramework contractorGB-PPON: PBHL-3867-TDLT Enterprise Centre University Of Reading Earley Gate, Reading, South East, RG6 6BUContact email
  • AtkinsRealis LimitedFramework contractorGB-PPON: PLLV-1772-YDYN Woodcote Grove, Ashley Road, Surrey, South East, KT18 5BWContact email
  • Axion Solutions LtdFramework contractorGB-PPON: PYHJ-4293-NMBL 63 Mill Lane, London, London, NW6 1NBContact email
  • BAE Systems Applied IntelligenceFramework contractorGB-PPON: PNQT-3914-QNQH Surrey Research Park, Guildford, South East, GU2 7RQContact email
  • CACI LtdFramework contractorGB-PPON: PHWT-4231-YGQG Caci House Kensington Village, London, London, W14 8TSContact email
  • CAMBRIDGE CONSULTANTS LIMITEDBidder / tendererGB-PPON: PTGW-7862-TJML Unit 29 Science Park, Cambridge, East of England, CB4 0DW
Show 40 more suppliers
  • CFMS Services LimitedBidder / tendererGB-PPON: PHDG-1713-JJBG 43 Queen Square, Bristol, South West, BS1 4QP
  • CU Services LtdFramework contractorGB-PPON: PHJB-7661-NVQH Coventry University, Priory Street, Coventry, West Midlands, CV1 5FBContact email
  • Cambridge UniversityFramework contractorGB-PPON: PWLY-1265-BRCD The Old Schools, Trinity Lane, Cambridge, East of England, CB2 1TNContact email
  • Cirrus Software SolutionsFramework contractorGB-PPON: PXGQ-3794-LHTQ Midway House Herrick Way, Cheltenham, South West, GL51 6TQContact email
  • ESRI (UK) LimitedFramework contractorGB-PPON: PMLQ-6842-CHYG Millennium House, 65 Walton Street, Aylesbury, South East, HP21 7QGContact email
  • Fraser-Nash Consultancy LtdFramework contractorGB-PPON: PVXN-4166-QPYR Hill Park Court, Leatherhead, South East, KT22 7NLContact email
  • Fullwood Engineering LtdFramework contractorGB-PPON: PXPX-7881-WTBP Unit 303 Jc Albyn Complex, Sheffield, Yorkshire & Humber, S3 8BZContact email
  • HR WallingfordFramework contractorGB-PPON: PMRC-5959-JXMH Howbery Park, Wallingford, Oxfordshire, South East, OX10 8BAContact email
  • Hitch Marketing LimitedFramework contractorGB-PPON: PHCJ-4352-WDBL 255 Poulton Road, Wallasey, North West, CH44 4BTContact email
  • Imperial College Projects LimitedFramework contractorGB-PPON: PXJN-2398-RRXZ The Faculty Building Level 1 Imperial College London, London, London, SW7 2AZContact email
  • IndividualFramework contractorGB-PPON: PBXY-3232-WNHZ STFC RAL, Polaris House, North Star Avenue, Swindon, South West, SN2 1SZContact email
  • IndividualFramework contractorGB-PPON: PDQJ-7126-JDHG STFC Hartree Centre, Polaris House, North Star Avenue, Swindon, South West, SN2 1SZContact email
  • IndividualFramework contractorGB-PPON: PGYY-2165-QXNQ British Antarctic Survey, Polaris House, North Star Avenue, Swindon, South West, SN2 1SZContact email
  • IndividualBidder / tendererGB-PPON: PMGL-5552-GJZX British Antarctic Survey, Polaris House, North Star Avenue, Swindon, South West, SN2 1SZ
  • Integrate Systems Consulting LtdBidder / tendererGB-PPON: PLNW-1138-RWMY 34/36 Fore Street, Newton Abbot, South West, TQ13 9AE
  • JBA ConsultingFramework contractorGB-PPON: PQBC-8538-JPBV 1 Broughton Park Old Lane North, Skipton, Yorkshire & Humber, BD23 3FDContact email
  • Lancaster UniversityFramework contractorGB-PPON: PHYT-3516-XDZY Bailrigg, Lancaster, North West, LA1 4YWContact email
  • METEOMATICS LIMITEDBidder / tendererGB-PPON: PCMR-6149-MCQG Sigma House Oak View Close, Torquay, South West, TQ2 7FF
  • Menapia LtdFramework contractorGB-PPON: PDMP-1192-YDLV Unit 4, Flexspace Albion Park, Leeds, Yorkshire & Humber, LS12 2EJContact email
  • Montvieux LtdFramework contractorGB-PPON: PJTJ-7546-MVYQ Monahans Chartered Accountants, Lennox House, 3 Pierrepont Street, Bath, South West, BA1 1LBContact email
  • National Oceanography CentreFramework contractorGB-PPON: PYLV-3456-PMCQ National Oceanography Centre, Southampton, South East, SO14 3ZHContact email
  • Northumbria University Business and EnterpriseFramework contractorGB-PPON: PCCM-8851-PBTR Sutherland Building, College Road, Newcastle upon Tyne, North East, NE1 8STContact email
  • OpenWeather LTDFramework contractorGB-PPON: PWHH-4934-XWHD 30 St. Mary's Axe, London, London, EC3A 8BFContact email
  • Ove Arup & Partners LtdFramework contractorGB-PPON: PZJN-8211-DBBV 8 Fitzroy Street, London, London, W1T 4BJContact email
  • Oxidian LtdFramework contractorGB-PPON: PRRL-9192-HWJX 7 Bell Yard, London, London, WC2A 2JRContact email
  • Queen Mary University of LondonBidder / tendererGB-PPON: PZRH-9379-HRWX Business Development, Queen Mary University of London, Dept W, 81 Mile End Road, London, London, E1 4UJ
  • SLR Consulting LtdFramework contractorGB-PPON: PWWL-5899-NCVW Third Floor Summit House, London, London, WC1R 4QHContact email
  • Sayers and PartnersFramework contractorGB-PPON: PWTT-4417-HWCT 24a High Street, Watlington, South East, OX49 5PYContact email
  • Sparta GlobalBidder / tendererGB-PPON: PTQM-6568-WYPW 125 London Wall, London, London, EC2Y 5AS
  • The Alan Turing InstituteFramework contractorGB-PPON: PDMN-1698-RTJM British Library, London, London, NW1 2DBContact email
  • The University of Edinburgh (EPCC)Bidder / tendererGB-PPON: PGGY-6115-PNHD Old College, South Bridge, Edinburgh, Scotland, EH8 9YL
  • UCL ConsultantsFramework contractorGB-PPON: PCHQ-1231-DMXG 90 Tottenham Court Road, London, London, W1T 4TJContact email
  • University of BathBidder / tendererGB-PPON: PNGV-7869-ZHZQ Claverton Down, Bath, South West, BA2 7AY
  • University of BirminghamFramework contractorGB-PPON: PHCQ-3464-LVTM Edgbaston, Birmingham, West Midlands, B15 2TTContact email
  • University of ExeterFramework contractorGB-PPON: PZYG-2396-XCRZ Northcote House, Queens Drive, Exeter, South West, EX4 4QJContact email
  • University of LancashireBidder / tendererGB-PPON: PXZY-8464-ZLQL Adelphi Street, Preston, North West, PR1 2HE
  • University of LeedsFramework contractorGB-PPON: PDVB-8476-PXMZ University of Leeds, Leeds, Yorkshire & Humber, LS2 9LUContact email
  • University of PlymouthFramework contractorGB-PPON: PQHL-4825-PGGL Drakes Circus, Plymouth, South West, PL4 8AAContact email
  • University of ReadingFramework contractorGB-PPON: PCDD-8171-GCYQ Whiteknights, PO Box 217, Reading, South East, RG6 6AHContact email
  • University of SouthamptonFramework contractorGB-PPON: PLJL-3977-CCGG University Road, Highfield, Southampton, South East, SO17 1BJContact email

Official documents & specifications (16)

Official links; attachments are not copied

Notices published for this procedure

  • Contract details notice contractContract details noticeUK7Contract details notice on Find a Tender
  • Contract details notice contractContract details noticeUK7Contract details notice on Find a Tender
  • Contract details notice contractContract details noticeUK7Contract details notice on Find a Tender
  • Contract details notice contractContract details noticeUK7Contract details notice on Find a Tender
  • Contract details notice contractContract details noticeUK7Contract details notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
Show 8 more notices