Official UK procurement notice
DfE - Invest NI - Energy and Resource Efficiency Consultancy Framework
Authority: InvestNI·Consortium: 3 public authorities
What is being bought9 lots · detail below
Published requirement descriptionInvest NI wishes to establish a framework of
Contractors to undertake projects relating to Energy and Resource Efficiency.
The Framework will be divided into 9 Lots/Sectors. A framework list with multiple
contractors will be established for each of the Sectors/Lots below: There is no
restriction on the number of successful contractors per lot. Successful
tenderers listed on the framework will be invited to tender for individual
contracts through a Secondary competition process.
CPV: Architectural, construction, engineering and inspection services · Business services: law, marketing, consulting, recruitment, printing and security · Consultative engineering and construction services · Energy and related services · Energy-efficiency consultancy services · Energy-management services · Enterprise resource planning software development services · Environmental management · Environmental quality control services · Environmental services · Industrial quality control services · Monitoring and control services · +10 more
How this framework works
From the published notice- Places
- up to 99 suppliers · 33 bids on the busiest of 9 lots (0.3 per place) · 29 appointed
Lots and requirements (9)Procurement structure
9 lots · all with a published value · a supplier may bid for at most 9 of them · same evaluation weights on every lotEvery one of these 9 lots carries the same published figure, £333,333: it is the framework's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.
Lot #1Resource Efficiency and Waste Management SystemsAwardedceiling above
Invest NI wishes to establish a framework of Contractors to undertake
projects relating to Energy and Resource Efficiency. The Framework will be
divided into 9 Lots/Sectors. A framework list with multiple contractors will be
established for each of the Sectors/Lots below: There is no restriction on
the number of successful contractors per lot. Successful tenderers listed on
the framework will be invited to tender for individual contracts through a
Secondary competition process.
Lot #2Efficient Technology/Processing SystemsAwardedceiling above
Invest NI wishes to establish a framework of Contractors to undertake
projects relating to Energy and Resource Efficiency. The Framework will be
divided into 9 Lots/Sectors. A framework list with multiple
contractors will be established for each of the Sectors/Lots below:
There is no restriction on the
number of successful contractors per lot. Successful tenderers listed on
the framework will be invited to tender for individual contracts through a
Secondary competition process.
Lot #3Renewable Technology SystemsAwardedceiling above
Invest NI wishes to establish a framework of Contractors to undertake
projects relating to Energy and Resource Efficiency. The Framework will be
divided into 9 Lots/Sectors. A framework list with multiple
contractors will be established for each of the Sectors/Lots below: There is no restriction on
the number of successful contractors per lot. Successful tenderers listed on
the framework will be invited to tender for individual contracts through a
Secondary competition process.
Lot #4Energy Management and EfficiencyAwardedceiling above
Invest NI wishes to establish a framework of Contractors to undertake
projects relating to Energy and Resource Efficiency. The Framework will be
divided into 9 Lots/Sectors. A framework list with multiple
contractors will be established for each of the Sectors/Lots below: There is no restriction on
the number of successful contractors per lot. Successful tenderers listed on
the framework will be invited to tender for individual contracts through a
Secondary competition process.
Lot #5Investigation of New TechnologiesAwardedceiling above
Invest NI wishes to establish a framework of Contractors to undertake
projects relating to Energy and Resource Efficiency. The Framework will be
divided into 9 Lots/Sectors. A framework list with multiple contractors will be
established for each of the Sectors/Lots below: There is no restriction on
the number of successful contractors per lot. Successful tenderers listed on
the framework will be invited to tender for individual contracts through a
Secondary competition process.
Lot #6Packaging SolutionsAwardedceiling above
Invest NI wishes to establish a framework of Contractors to undertake
projects relating to Energy and Resource Efficiency. The Framework will be
divided into 9 Lots/Sectors. A framework list with multiple
contractors will be established for each of the Sectors/Lots below: There is no restriction on
the number of successful contractors per lot. Successful tenderers listed on
the framework will be invited to tender for individual contracts through a
Secondary competition process.
Lot #7Standards, Accreditations and SystemsAwardedceiling above
Invest NI wishes to establish a framework of Contractors to undertake
projects relating to Energy and Resource Efficiency. The Framework will be
divided into 9 Lots/Sectors. A framework list with multiple
contractors will be established for each of the Sectors/Lots below: There is no restriction on
the number of successful contractors per lot. Successful tenderers listed on
the framework will be invited to tender for individual contracts through a
Secondary competition process.
Lot #8Transport and Logistics EfficiencyAwardedceiling above
Invest NI wishes to establish a framework of Contractors to undertake
projects relating to Energy and Resource Efficiency. The Framework will be
divided into 9 Lots/Sectors. A framework list with multiple
contractors will be established for each of the Sectors/Lots below: There is no restriction on
the number of successful contractors per lot. Successful tenderers listed on
the framework will be invited to tender for individual contracts through a
Secondary competition process.
Lot #9Sustainable Business CollaborationsAwardedceiling above
Invest NI wishes to establish a framework of Contractors to undertake
projects relating to Energy and Resource Efficiency. The Framework will be
divided into 9 Lots/Sectors. A framework list with multiple
contractors will be established for each of the Sectors/Lots below: There is no restriction on
the number of successful contractors per lot. Successful tenderers listed on
the framework will be invited to tender for individual contracts through a
Secondary competition process.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published sub-criteria (2)
- QUALITY: 70%
- COST: 30%
Published award criteria (2)
- QUALITY: 70
- COST: 30
- Price carries 30 of 100 points: a 10% discount moves about 3 points. The method statement decides this lot, not the discount.
- “DfE - Invest NI - Energy and Resource Efficiency Consultancy Framework” is a framework: the contest is a place on its panel, up to 99 suppliers, not a single contract.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record · publisher note attached- Procedure method
- Open procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Services
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- No (one-off requirement)
- First published
- 20 Jul 2023, 13:24 BST
- Last source update
- 20 Oct 2023, 15:48 BST
- Award evaluation window
- 7 Aug 2023 – …
- Authority reference
ID4640545- FTS notice number
2023/S 000-031087- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-03e3d4Find a Tender
- Electronic trading
- e-invoicing allowed · electronic ordering · electronic payment
- Review procedure
. CPD complied with the Public Contracts Regulations 2015 (as. amended) and incorporated a standstill period (i.e. a minimum of 10. calendar days) at the point information on the award of contract was. communicated to tenderers. That notification provided full information on the award. decision. This provided time for the unsuccessful tenderers to challenge the. award decision before the contract was entered into..
Publisher note: . Contractors not delivering on contract requirements is a serious matter.. It means the public purse is not getting what it is paying for. If... a. contractor fails to reach satisfactory levels of contract performance they. will be given a specified time to improve. If, after the specified... time, they. still fail to reach satisfactory levels of contract performance, the matter will. be escalated to senior management in CPD for... further action. If this occurs and. your performance does not improve to satisfactory levels within the specified. period, this can be... considered grounds for.. termination of the contract at. your expense as provided for in the Conditions of Contract In lieu of. termination,... CPD may issue a Notice.of Written Warning or a Notice of Unsatisfactory. Performance. A supplier in receipt of multiple Notices of Written... Warning or a Notice. of Unsatisfactory Performance may, in accordance with The Public Contracts. Regulations 2015. (as. amended) be... excluded from future public procurement. competitions for a period of up to three years. The figure stated in V.2.4 is a. maximum. that.. can. be spent through the framework over the full term and does not give any. guarantee of any level of business that may. be awarded.. under. the agreement..
How it was run
Official notice- Appointment period ends
- 7 Aug 2023, 15:00 BST
- Submission channel
- {"written"}
- Accepted languages
- en
- Bids opened
- 7 Aug 2023, 15:30 BST
Timeline
7 Aug 2023 → 5 Nov 2023 · 4 dates- Admission / appointment period endsperiod end, not a bid countdown7 Aug 2023, 15:00 BST
- Bids opened7 Aug 2023, 15:30 BST
- Notice published20 Oct 2023, 15:48 BST
- Bids must remain valid until5 Nov 2023, 23:59 GMT
Notice history
1 event · 2 releases on Find a Tender- Status changed to complete20 Oct 2023, 15:48 BST
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast9 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.
Contracts
All 8 of these contracts carry the same published figure, £330,000, the framework's maximum for the whole notice, not each contract's own value. They are not eleven separate sums.
Resource Efficiency and Waste Management Systems
- Signed
- 16 Oct 2023
- Value
- ceiling above
- Status
- active
Efficient Technology/Processing Systems
- Signed
- 16 Oct 2023
- Value
- £333,000
- Status
- active
Renewable Technology Systems
- Signed
- 16 Oct 2023
- Value
- ceiling above
- Status
- active
Energy Management and Efficiency
- Signed
- 16 Oct 2023
- Value
- ceiling above
- Status
- active
Investigation of New Technologies
- Signed
- 16 Oct 2023
- Value
- ceiling above
- Status
- active
Packaging Solutions
- Signed
- 16 Oct 2023
- Value
- ceiling above
- Status
- active
Standards, Accreditations and Systems
- Signed
- 16 Oct 2023
- Value
- ceiling above
- Status
- active
Transport and Logistics Efficiency
- Signed
- 16 Oct 2023
- Value
- ceiling above
- Status
- active
Sustainable Business Collaborations
- Signed
- 16 Oct 2023
- Value
- ceiling above
- Status
- active
Bid statistics published by the authority
| Lot | Bids | SME | VCSE | Valid bid range |
|---|---|---|---|---|
| 1 · Resource Efficiency and Waste Management Systems | 33bids · 33 electronic · 10 from abroad | 9 | — | — |
| 2 · Efficient Technology/Processing Systems | 33bids · 33 electronic · 10 from abroad | 9 | — | — |
| 3 · Renewable Technology Systems | 33bids · 33 electronic · 11 from abroad | 10 | — | — |
| 4 · Energy Management and Efficiency | 33bids · 33 electronic · 12 from abroad | 11 | — | — |
| 5 · Investigation of New Technologies | 33bids · 33 electronic · 11 from abroad | 10 | — | — |
| 6 · Packaging Solutions | 33bids · 33 electronic · 3 from abroad | 2 | — | — |
| 7 · Standards, Accreditations and Systems | 33bids · 33 electronic · 19 from abroad | 16 | — | — |
| 8 · Transport and Logistics Efficiency | 33bids · 33 electronic · 9 from abroad | 7 | — | — |
| 9 · Sustainable Business Collaborations | 33bids · 33 electronic · 8 from abroad | 7 | — | — |
Contracting authority & participating public bodies
2 public bodies on the noticeConsortium members and other public bodies
- Invest Northern IrelandContracting authority
Framework contractors & participating bidders
29 commercial parties on the notice- AD SUSTAINABILITY CONSULTANCY LTDFramework contractor
- ADLER ALLAN LIMITEDFramework contractor
- AECOM LTDFramework contractor
- AETHERGY LTDFramework contractor
- Action RenewablesFramework contractor
- B9 ENERGY STORAGE LTDFramework contractor
- B9 SOLUTIONS LIMITEDFramework contractor
- CAMBIUM UK LLPFramework contractor
- CARBONFIT LTDFramework contractor
- CLOSE FOCUS LIMITEDFramework contractor
Show 19 more suppliers
- CONTINU LTDFramework contractor
- Circular Resource Specialists CRS LtdFramework contractor
- DOHERTY CONSULTING LTDFramework contractor
- ELEMENT CONSULTANTS LTDFramework contractor
- FATHOM ENERGY ENVIRONMENT LTDFramework contractor
- FPM ACCOUNTANTS LTDFramework contractor
- GIRAFFE ASSOCIATES LtdFramework contractor
- GM ENERGY MANAGEMENT LTDFramework contractor
- INTERNATIONAL SYNERGIES NORTHERN IRELAND LTDFramework contractor
- Mabbett Associates LtdFramework contractor
- NAVIGATE H2 LTDFramework contractor
- Net zero IrelandFramework contractor
- Operations Excellence ConsultingFramework contractor
- Quadra LtdFramework contractor
- RESOURCEABLE LTDFramework contractor
- SDS ENERGY LTDFramework contractor
- STEER DAVIES GLEAVE LIMITEDFramework contractor
- STEPHEN CLARKE CONSULTING LIMITEDFramework contractor
- SYNERGIE ENVIRON LIMITEDFramework contractor
Official documents & specifications (2)
Official links; attachments are not copiedTender pack and attachments
- Economic and financial selection criteria
- Technical selection criteria