Find a TenderClosed
Published 26 Sept 2024, 19:49 BST

Official UK procurement notice

Design, Installation, Operation & Maintenance of a District Heat Network within Hull City Centre

Official notice

Authority: Kingston Upon Hull City Council (Local council)

Framework agreementWorksCompetitive procedure with negotiation
Framework ceiling (notional)£125,000,000framework ceiling, not attributable revenue
Submissions closed 15 Nov 2024
Framework period 9 yrsends 28 Feb 2034 · starts 1 Mar 2025

What is being bought

Published requirement description

The Authority intends to appoint a Contractor to design and build (and to subsequently Operate and Maintain) a low carbon heat network and associated energy centre in the city of Hull. The heat network is intended to be expanded in future Phases. The requirements relate to Phase 1 of the Heat Network and the Energy Centre. Kingston upon Hull City Council is conducting the procurement using the Negotiated Procedure with prior call for competition in accordance with the requirements of Regulation 47 of the Utilities Contracts Regulations 2016 (SI 2016 . 274) ) (UCR 2016). The Authority reserves the right to proceed with the award of the contract following the initial tender submission should it determine, at its sole discretion, that the bids received can be accepted without proceeding with the negotiated stage. It is intended to appoint a principal contractor for these works to start in early 2025, and for Phase 1 of the network fully completed by March 2028.

CPV: Construction works for power plants and heating plants · District heating · District heating boiler · District-heating plant construction work · Heating plant construction work · Network infrastructure · Works for complete or part construction and civil engineering work

How this framework works

From the published notice
Places
up to 1 suppliers
Framework period

9 yrs from 1 Mar 2025, This procurement is for a significant piece of infrastructure to support the Authority's carbon reduction strategy. The initial works to deliver Phase 1 (Design & Build) of the Heat Network will take 3 years to complete, and the successful contractor will also be appointed to take over the Operation & Maintenance of the Heat Network for up to the first 9 - 10 years (only).

The lotProcurement structure

single lot · value published
Lot #1The Authority intends to appoint a Contractor to design and build (and to subsequently… 9 yrsPublished value£125,000,000

The Authority intends to appoint a Contractor to design and build (and to subsequently Operate and Maintain) a low carbon heat network and associated energy centre in the city of Hull (the Project). The heat network is intended to be expanded in future Phases. The Project requirements relate to Phase 1 of the Heat Network and the Energy Centre. Within the Phase 1 design, there are four key components of the Project infrastructure:

  • A waste heat exchange facility and associated infrastructure
  • The Energy Centre, a new building housing blended heat generation plant, pumping and thermal storage plant located within the city at the Trippett Street Car Park.
  • The Heat Network, a buried pre-insulated two-pipe low temperature flow and return distribution network consisting of mains, branches and building connections.
  • Building heat interface connections, plate heat exchangers / heat interface units (HIU) plant and equipment located within customer plant rooms serving customer secondary heating and hot water systems. Kingston upon Hull City Council (the Authority) is conducting the procurement using the Negotiated Procedure with prior call for competition in accordance with the requirements of Regulation 47 of the Utilities Contracts Regulations 2016 (SI 2016 . 274) ) (UCR 2016) for the purpose of procuring the works and services described in the Specification documents (Works and Services). The Authority reserves the right to proceed with the award of the contract following the initial tender submission should it determine, at its sole discretion, that the bids received can be accepted without proceeding with the negotiated stage. It is intended to appoint a principal contractor for these requirements in late 2024, with works to start in early 2025, and for Phase 1 of the network fully completed by March 2028.
Contract period: 1 Mar 2025 – 28 Feb 2034 (9 yrs)
Delivery: Yorkshire & Humber · Kingston upon Hull
Variant bids: not allowed

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
Conditions of participation3
  • Suitability

    Requirements detailed within the tender documentation relating to demonstration of capability and professional qualifications / competency.

  • Economic & financial standing

    Requirements detailed within the tender documentation, Invitation to Tender document and Standard Selection Questionnaire.

  • Technical & professional ability

    Requirements detailed within the tender documentation relating to demonstration of capability and professional qualifications / competency.

What this means for your bid
  • “Design, Installation, Operation & Maintenance of a District Heat…” is a framework: the contest is a place on its panel, up to 1 suppliers, not a single contract.

Procedure terms & legal framework

From the official record
Procedure method
Competitive procedure with negotiation
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Works
Notice status
Closed
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
No (one-off requirement)
First published
26 Sept 2024, 19:49 BST
Last source update
26 Sept 2024, 19:49 BST
Authority reference
90247
FTS notice number
2024/S 000-030884
Classification (CPV)
Construction works for power plants and heating plantsDistrict heatingDistrict heating boilerDistrict-heating plant construction workHeating plant construction workNetwork infrastructureWorks for complete or part construction and civil engineering work
Delivery area
Yorkshire & Humber (UKE11)
Official registry OCID
ocds-h6vhtk-04a35a Find a Tender
Contract terms
Electronic trading
e-invoicing allowed · electronic ordering · electronic payment

How it was run

Official notice
Run through: EU-Supply (CTM) · Who buys & how to bid on EU-Supply
Public notice page · account needed to bidLanguage: EN
Access & registration note: Free · 5–10 minutes
Appointment period ends
15 Nov 2024, 12:00 GMT
Submission channel
{"electronicSubmission","written"}
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

Timeline

26 Sept 2024 → 15 May 2025 · 4 dates
  1. Notice published
    26 Sept 2024, 19:49 BST
  2. Admission / appointment period endsperiod end, not a bid countdown
    15 Nov 2024, 12:00 GMT
  3. Contract starts
    1 Mar 2025
  4. Bids must remain valid until
    15 May 2025, 23:59 BST

Contracting authority & participating public bodies

Hull City Council

Contracting authorityLocal CouncilRegional or local authorityGeneral public services 168524345 The Guildhall, Alfred Gelder Street, Hull, Yorkshire & Humber, HU1 2AAContact name, email, phone Published organisation website ↗

Dispute resolution & review bodies

  • Town Clerk, Hull City CouncilReview body Hull

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.