Design, Installation, Operation & Maintenance of a District Heat Network within Hull City Centre

Construction works for power plants and heating plants
District heating
District heating boiler
+4 more
Published value
£125,000,000
Submission deadline 15 Nov 2024, 12:00 GMT
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: Hull City Council: "Design, Installation, Operation & Maintenance of a District Heat Network within Hull City Centre". Published status: active. Published value: £125,000,000. 1 published lot. Recorded submission deadline: 15 Nov 2024, 12:00 GMT. See the official notice for participation instructions.
Contracting AuthorityHull City CouncilScope & CategoriesNot publishedSubmission Window
Closed
15 Nov 2024, 12:00 GMT
Submission GatewayDirect notice routeLegal Basis & RegimeStandard procurementEstimated Value (exc. VAT)£125,000,000
Bidder Intelligence · Authority Profile: Hull City Council
Market Analytics
View Authority Profile →
Derived from OCDS awards & bid statistics
Published history for Hull City Council. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Requires at least 5 comparable procedures
Competition Density
3.5Bids / Report
41.6% of reports have one bid
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate available
Payment Terms
Check noticePublished terms
Payment obligations depend on the applicable regime and contract. Consult the official documents.
Coverage: 202 active published awards; 202 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityHull City Council
Procedure methodNot published
Procurement categoryNot published
Statusactive
Framework / DPSFramework
CompetitionNot published
Above thresholdNot published
Legal basisNot published
Tender period startsNot published
Clarification deadlineNot published
Electronic submissionNot published
Submission languagesNot published
Published26 Sept 2024, 19:49 BST
Last source update26 Sept 2024, 19:49 BST
Recurring procurementNo
ClassificationConstruction works for power plants and heating plants, District heating, District heating boiler, District-heating plant construction work, Heating plant construction work, Network infrastructure, Works for complete or part construction and civil engineering work
OCIDocds-h6vhtk-04a35a
What is being bought
The Authority intends to appoint a Contractor to design and build (and to subsequently Operate and Maintain) a low carbon heat network and associated energy centre in the city of Hull. The heat network is intended to be expanded in future Phases. The requirements relate to Phase 1 of the Heat Network and the Energy Centre. Kingston upon Hull City Council is conducting the procurement using the Negotiated Procedure with prior call for competition in accordance with the requirements of Regulation 47 of the Utilities Contracts Regulations 2016 (SI 2016 . 274) ) (UCR 2016). The Authority reserves the right to proceed with the award of the contract following the initial tender submission should it determine, at its sole discretion, that the bids received can be accepted without proceeding with the negotiated stage. It is intended to appoint a principal contractor for these works to start in early 2025, and for Phase 1 of the network fully completed by March 2028.
What changed
From the official release history
  1. Published value updated to £125,000,000
    26 Sept 2024, 19:49 BST
  2. Status changed to active
    26 Sept 2024, 19:49 BST
  3. Official notice release published
    26 Sept 2024, 19:49 BST
  4. Submission deadline changed to 15 Nov 2024, 12:00 GMT
    26 Sept 2024, 19:49 BST
  5. Buyer information updated
    26 Sept 2024, 19:49 BST
Lots and requirements (1)
Published by the contracting authority
  • Lot 1 · #1
    Individual lot title not published
    active
    Published value£125,000,000
    The Authority intends to appoint a Contractor to design and build (and to subsequently Operate and Maintain) a low carbon heat network and associated energy centre in the city of Hull (the Project). The heat network is intended to be expanded in future Phases. The Project requirements relate to Phase 1 of the Heat Network and the Energy Centre. Within the Phase 1 design, there are four key components of the Project infrastructure: • A waste heat exchange facility and associated infrastructure • The Energy Centre, a new building housing blended heat generation plant, pumping and thermal storage plant located within the city at the Trippett Street Car Park. • The Heat Network, a buried pre-insulated two-pipe low temperature flow and return distribution network consisting of mains, branches and building connections. • Building heat interface connections, plate heat exchangers / heat interface units (HIU) plant and equipment located within customer plant rooms serving customer secondary heating and hot water systems. Kingston upon Hull City Council (the Authority) is conducting the procurement using the Negotiated Procedure with prior call for competition in accordance with the requirements of Regulation 47 of the Utilities Contracts Regulations 2016 (SI 2016 . 274) ) (UCR 2016) for the purpose of procuring the works and services described in the Specification documents (Works and Services). The Authority reserves the right to proceed with the award of the contract following the initial tender submission should it determine, at its sole discretion, that the bids received can be accepted without proceeding with the negotiated stage. It is intended to appoint a principal contractor for these requirements in late 2024, with works to start in early 2025, and for Phase 1 of the network fully completed by March 2028.
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
Timeline
  1. Procedure published
    26 Sept 2024, 19:49 BST
  2. Submission deadline
    15 Nov 2024, 12:00 GMT
Commercial outcome and competition
AwardsNo award published
ContractsNo contract published
Bid statisticsNo aggregate bid statistics published
Buyer and organisations in this procedure

Hull City Council

Contracting authority GB-FTS-44387
View buyer profile
Documents (0)
Official links; attachments are not copied
No data
No linked documents are published
Related procedures (0)
No data
No related procedures published