Find a TenderOpen admission Tender notice
Published 2 Oct 2026, 13:59 BST

Official UK procurement notice

DCWW 2113 - Low Value Small Works

Authority: Dwr Cymru Cyfyngedig (Public body)

Framework agreement8 lotsWorksCompetitive flexible procedureAbove thresholdUtilitiesSME suitable
Framework ceiling (notional)£52,800,000envelope for 8 lots · framework ceiling, not attributable revenue
Admission open until 27 Oct 202617:00 GMT · period end, not a bid countdown
Lots 8see the lot list below
Framework period 2 yrsup to 8 yrs with extensions · starts 1 Apr 2027
Bids per lot · this authority 5division 45 · n=8 · competition analysis ↓

What is being bought8 lots · detail below

Published requirement description

DCC is seeking to establish a framework for the delivery of Low Value Small Works across its operational and non-operational estate throughout Wales. The framework will cover low-value construction, repair, maintenance and improvement works across four specialist areas: Domestic Building Maintenance, Civils, Mechanical and Electrical.

The framework will be divided into two geographical regions, North Wales and South Wales, with each region containing the four specialist sub-lots. DCC intends to appoint up to three suppliers to each sub-lot. Works may be planned or reactive and will be instructed on an individual job basis, with a proposed maximum value of £20,000 per job.

  • How the procedure runs: DCC intends to conduct a Competitive Flexible Procedure comprising an initial Conditions of Participation stage, followed by an Invitation to Tender for suppliers that meet the required conditions and minimum thresholds. Tenders will be evaluated against the published award criteria and assessment methodology. DCC may seek more…clarifications and, where provided for in the procurement documents, undertake further tender rounds or refine aspects of the procurement. Following final evaluation, DCC intends to appoint up to three suppliers to each specialist sub-lot.

CPV: Building completion work · Building construction work · Electrical installation work · Electrical wiring and fitting work · Engineering works and construction works · Mechanical engineering installation works · Mechanical installations · Other building completion work · Other electrical installation work · Plumbing and sanitary works · Refurbishment work · Site preparation work

How this framework works

From the published notice
Type
Closed framework
Call-offs
call-offs are awarded directly to appointed suppliers, without further competition
Framework period
2 yrs · up to 8 yrs from 1 Apr 2027
Published description of the framework

Call-off contracts will be awarded without further competition to the supplier appointed to the relevant sub-lot whose registered business location or operational depot is geographically closest to the site at which the works are required. Where that supplier is unable to undertake the works within DCC’s required timescales, does not have sufficient capacity, or is otherwise unable to meet the requirements of the call-off, DCC may award the call-off contract to another supplier appointed to the relevant sub-lot. In determining the alternative supplier, DCC may take into account relevant factors including proximity to the works location, available capacity, previous contract performance and value for money. The price payable under each call-off contract will be determined in accordance with the pricing mechanism established under the Framework Agreement. This will include the applicable framework hourly labour rates, materials charged at cost plus the agreed contractual mark-up, and the pre-agreed rates for plant and equipment.

Lots and requirements (8)Procurement structure

8 lots · all with a published value · same evaluation weights on every lot

Every one of these 8 lots carries the same published figure, £52,800,000: it is the framework's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.

Lot #1Building Maintenance (Domestic) - NorthRenewal 2 yrsSMEceiling above
Provision of low-value general building maintenance, repair and improvement works across DCC’s operational and non-operational estate in the North of the operating area.
Contract period: 1 Apr 2027 — 31 Mar 2029 (2 yrs) · up to 8 yrs with extensionsEligibility: SME eligibleDelivery: West Midlands, Wales
Extensions
The framework will have an initial term of two years, with the option to extend for up to a further six years in three separate two-year periods (2+2+2+2). Any extension will be at DCC’s discretion and will be subject to factors including continued business need, supplier performance, value for money and ongoing suitability of the framework.
45210000 Building construction work45400000 Building completion work45450000 Other building completion work45453100 Refurbishment work

Who is likely to bid for this lot ↓

Lot #2Civil Works - NorthRenewal 2 yrsSMEceiling above
Provision of low-value civil engineering, groundworks, repair and minor infrastructure works across DCC’s operational and non-operational estate in the North of the operating area.
Contract period: 1 Apr 2027 — 31 Mar 2029 (2 yrs) · up to 8 yrs with extensionsEligibility: SME eligibleDelivery: West Midlands, Wales
Extensions
The framework will have an initial term of two years, with the option to extend for up to a further six years in three separate two-year periods (2+2+2+2). Any extension will be at DCC’s discretion and will be subject to factors including continued business need, supplier performance, value for money and ongoing suitability of the framework.
45100000 Site preparation work45200000 Works for complete or part construction and civil engineering work45220000 Engineering works and construction works

Who is likely to bid for this lot ↓

Lot #3Mechanical Works - NorthRenewal 2 yrsSMEceiling above
Provision of low-value mechanical installation, maintenance, repair and improvement works across DCC’s operational and non-operational estate in the North of the operating area.
Contract period: 1 Apr 2027 — 31 Mar 2029 (2 yrs) · up to 8 yrs with extensionsEligibility: SME eligibleDelivery: West Midlands, Wales
Extensions
The framework will have an initial term of two years, with the option to extend for up to a further six years in three separate two-year periods (2+2+2+2). Any extension will be at DCC’s discretion and will be subject to factors including continued business need, supplier performance, value for money and ongoing suitability of the framework.
45330000 Plumbing and sanitary works45350000 Mechanical installations45351000 Mechanical engineering installation works

Who is likely to bid for this lot ↓

Lot #4Electrical Works - NorthRenewal 2 yrsSMEceiling above
Provision of low-value electrical installation, maintenance, repair and improvement works across DCC’s operational and non-operational estate in the North of the operating area.
Contract period: 1 Apr 2027 — 31 Mar 2029 (2 yrs) · up to 8 yrs with extensionsEligibility: SME eligibleDelivery: West Midlands, Wales
Extensions
The framework will have an initial term of two years, with the option to extend for up to a further six years in three separate two-year periods (2+2+2+2). Any extension will be at DCC’s discretion and will be subject to factors including continued business need, supplier performance, value for money and ongoing suitability of the framework.
45310000 Electrical installation work45311000 Electrical wiring and fitting work45317000 Other electrical installation work

Who is likely to bid for this lot ↓

Lot #5Building Maintenance (Domestic) - SouthRenewal 2 yrsSMEceiling above
Provision of low-value general building maintenance, repair and improvement works across DCC’s operational and non-operational estate in the South of the operating area.
Contract period: 1 Apr 2027 — 31 Mar 2029 (2 yrs) · up to 8 yrs with extensionsEligibility: SME eligibleDelivery: West Midlands, Wales
Extensions
The framework will have an initial term of two years, with the option to extend for up to a further six years in three separate two-year periods (2+2+2+2). Any extension will be at DCC’s discretion and will be subject to factors including continued business need, supplier performance, value for money and ongoing suitability of the framework.
45210000 Building construction work45400000 Building completion work45450000 Other building completion work45453100 Refurbishment work

Who is likely to bid for this lot ↓

Lot #6Civil Works - SouthRenewal 2 yrsSMEceiling above
Provision of low-value civil engineering, groundworks, repair and minor infrastructure works across DCC’s operational and non-operational estate in the South of the operating area.
Contract period: 1 Apr 2027 — 31 Mar 2029 (2 yrs) · up to 8 yrs with extensionsEligibility: SME eligibleDelivery: West Midlands, Wales
Extensions
The framework will have an initial term of two years, with the option to extend for up to a further six years in three separate two-year periods (2+2+2+2). Any extension will be at DCC’s discretion and will be subject to factors including continued business need, supplier performance, value for money and ongoing suitability of the framework.
45100000 Site preparation work45200000 Works for complete or part construction and civil engineering work45220000 Engineering works and construction works

Who is likely to bid for this lot ↓

Lot #7Mechanical Works - SouthRenewal 2 yrsSMEceiling above
Provision of low-value mechanical installation, maintenance, repair and improvement works across DCC’s operational and non-operational estate in the South of the operating area.
Contract period: 1 Apr 2027 — 31 Mar 2029 (2 yrs) · up to 8 yrs with extensionsEligibility: SME eligibleDelivery: West Midlands, Wales
Extensions
The framework will have an initial term of two years, with the option to extend for up to a further six years in three separate two-year periods (2+2+2+2). Any extension will be at DCC’s discretion and will be subject to factors including continued business need, supplier performance, value for money and ongoing suitability of the framework.
45330000 Plumbing and sanitary works45350000 Mechanical installations45351000 Mechanical engineering installation works

Who is likely to bid for this lot ↓

Lot #8Electrical Works - SouthRenewal 2 yrsSMEceiling above
Provision of low-value electrical installation, maintenance, repair and improvement works across DCC’s operational and non-operational estate in the South of the operating area.
Contract period: 1 Apr 2027 — 31 Mar 2029 (2 yrs) · up to 8 yrs with extensionsEligibility: SME eligibleDelivery: West Midlands, Wales
Extensions
The framework will have an initial term of two years, with the option to extend for up to a further six years in three separate two-year periods (2+2+2+2). Any extension will be at DCC’s discretion and will be subject to factors including continued business need, supplier performance, value for money and ongoing suitability of the framework.
45310000 Electrical installation work45311000 Electrical wiring and fitting work45317000 Other electrical installation work

Who is likely to bid for this lot ↓

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published — the tender pack may add more
How bids are scored · same split on all 8 lots
Quality: 40%Price: 60%
Published sub-criteria (2)
  • Quality — 40%
  • Commercial — 60%

Competition analysis · published record, not a forecast of who will bid

How Dwr Cymru Cyfyngedig buys Electrical installation work (CPV 4531) — and who usually turns up

Dwr Cymru Cyfyngedig’s own published record, next to the West Midlands market for the same work. This notice is a framework or DPS, so only frameworks and DPS are compared. Whole-market view: Electrical installation work (CPV 4531) →

1

How the contest usually goes

Left: this authority. Right: the market where the work is delivered. Bids and award-vs-estimate pairs are per lot, from contested frameworks and DPS only — direct awards (including PA 2023 transparency notices) report one bid by definition and are left out. On Procurement Act 2023 notices the count is the tenders assessed at the final stage, not every submission received; pairs compare like with like (VAT-exclusive, or VAT-inclusive on both sides). Empty means nothing was published, not filled in from elsewhere.

This authority

Dwr Cymru Cyfyngedig

framework/DPS notices in 36 months: 6 in division 45 · 9 in all categories

Bids per lot
i

How many companies usually bid for work like this.

Middle value of published bid counts, one per lot, for this buyer or this region in the same sector.

Based on this buyer’s tenders in this industry (CPV 45), last 36 months: 8 lots. All 8 lots are from older notices, which count bids received.

Nothing is filled in from UK-wide numbers. An empty tile means nothing usable was published.

5division 45 · 36m · n=8 lots
Single-bid lots
i

How often only one company bid.

Share of lots that received exactly one bid, on the same competitions as the bids figure.

Based on this buyer’s tenders in this industry (CPV 45), last 36 months: 8 lots.

High means a thin market or an incumbent that is hard to beat.

0%division 45 · 36m · n=8 lots
Award vs estimate
i

Do awards for work like this land above or below the estimate.

Estimate against award per lot, for this buyer or this region in the same sector.

Based on this buyer’s tenders in all categories, last 24 months: 3 pairs.

A past pattern, not a price to bid.

13% aboveall categories · 24m · n=3 pairs
Deadline → award date
i

How long buyers here take to decide after bids close.

Middle value in days from the deadline to the first award notice, on competitions that published both dates.

Based on this buyer’s tenders in all categories, last 36 months: 1 notices. Small sample.

Only decided tenders count, so slow ones still waiting are not in.

Last 36 months.

136dall categories · 36m · n=1 notices
Notice updates
i

How often this buyer changes a notice after publishing it.

Middle number of amendments per notice. Deadline extensions and corrections both count.

Based on this buyer’s tenders in all categories, last 24 months: 14 notices.

Last 24 months.

0all categories · 24m · n=14 notices
Awarded without competition
i

How often this buyer awards without a competition.

Direct or limited awards as a share of its notices that say which procedure was used. These routes are legal in defined cases. This is just the record.

Based on this buyer’s tenders in this industry (CPV 45), last 36 months: 6 notices.

Last 36 months.

0%division 45 · 36m · n=6 notices
Bids per lot · history, not this notice’s lots robust · n=8
i

How the number of bidders is spread across lots.

Each lot with a published bid count is put in a band: one bid, two to three, four to six, seven or more. Real competitions only.

Based on 8 lots on 2 contested notices · division 45, last 36 months.

  • 1 bid 0%
  • 2–3 0%
  • 4–6 88%
  • 7+ 13%

Middle value 5 · 8 lots on 2 contested notices · division 45.

How procedures are run robust · n=6
i

Which procedures buyers here use.

Notices by the procedure they declare: open, selective, limited or direct. Open and selective are competitions; limited and direct are not.

Based on 6 notices · division 45, last 36 months.

  • Open 17%
  • Selective 83%
  • Limited 0%
  • Direct 0%

6 notices · division 45. Open and selective are competed (they feed the bid and price figures above); limited and direct are not; notices publishing no route are outside all four.

The market · delivery region

West Midlands · Electrical installation work (CPV 4531)

framework/DPS notices delivered in West Midlands in 36 months: 82 in CPV 4531 (64 competed, 16 route not published) · 404 in division 45 (330 competed, 66 route not published)

Bids per lot
i

How many companies usually bid for work like this.

Middle value of published bid counts, one per lot, for this buyer or this region in the same sector.

Based on this region’s tenders in this sector (CPV 4531), last 36 months: 62 lots. 18 lots are from Procurement Act 2023 notices (bids assessed, middle 9.5) and 44 from older notices (bids received, middle 7.5).

Nothing is filled in from UK-wide numbers. An empty tile means nothing usable was published.

8CPV 4531 · 36m · n=62 lots
Single-bid lots
i

How often only one company bid.

Share of lots that received exactly one bid, on the same competitions as the bids figure.

Based on this region’s tenders in this sector (CPV 4531), last 36 months: 62 lots.

High means a thin market or an incumbent that is hard to beat.

3%CPV 4531 · 36m · n=62 lots
Award vs estimate
i

Do awards for work like this land above or below the estimate.

Estimate against award per lot, for this buyer or this region in the same sector.

Nothing published for this region in this sector: not measured on frameworks — a panel award is a ceiling, not a price.

A past pattern, not a price to bid.

—not measured on frameworks — a panel award is a ceiling, not a price
Deadline → award date
i

How long buyers here take to decide after bids close.

Middle value in days from the deadline to the first award notice, on competitions that published both dates.

Based on this region’s tenders in this sector (CPV 4531), last 36 months: 11 notices.

Only decided tenders count, so slow ones still waiting are not in.

Last 36 months.

45dCPV 4531 · 36m · n=11 notices
SME bidders
i

How much of this market goes to small and medium firms.

SME bidders where buyers published the split, otherwise SME winners.

Based on this region’s tenders in this sector (CPV 4531), last 36 months: 50 lots.

Last 36 months.

69%CPV 4531 · 36m · n=50 lots
Winners based in the region
i

How much work like this goes to companies based in the delivery region.

Awards in this category delivered here where the winner’s registered address is in the region.

Based on this region’s tenders in this sector (CPV 4531), last 36 months: 237 awards.

Registered address, so a national firm with a local branch counts as outside.

Last 36 months.

95%CPV 4531 · 36m · n=237 awards
Bids per lot · history, not this notice’s lots robust · n=62
i

How the number of bidders is spread across lots.

Each lot with a published bid count is put in a band: one bid, two to three, four to six, seven or more. Real competitions only.

Based on 62 lots on 29 contested notices · CPV 4531, last 36 months.

  • 1 bid 3%
  • 2–3 23%
  • 4–6 21%
  • 7+ 53%

Middle value 8 · 62 lots on 29 contested notices · CPV 4531.

How procedures are run robust · n=66
i

Which procedures buyers here use.

Notices by the procedure they declare: open, selective, limited or direct. Open and selective are competitions; limited and direct are not.

Based on 82 notices · CPV 4531, last 36 months.

  • Open 62%
  • Selective 35%
  • Limited 3%
  • Direct 0%

82 notices · CPV 4531. Open and selective are competed (they feed the bid and price figures above); limited and direct are not; notices publishing no route are outside all four.

moderate · n=3
i

Where this tender’s estimate would land if the usual pattern repeats.

We apply the buyer’s usual movement between estimate and award (or the region’s) to the estimate on this notice.

This notice gives one total for several lots, so we show the percentage but do not turn it into pounds.

A benchmark, not a price to bid.

The middle award in Dwr Cymru Cyfyngedig (all categories, n=3 pairs) lands 13% above. Too few pairs to turn into a pound figure with any confidence — read the percentage as a rough direction, not this notice’s estimate converted.
Coverage and what to read with care
  • Each tile explains itself. The on a figure says what it is, how it is counted and which scope this notice’s own record came from (class, division, all categories, or the authority’s 24-month row). The two columns are never blended and nothing is filled from a UK-wide figure; an empty tile means the source published nothing usable. Long form: Methodology.
  • Coverage. Roughly 40 % of notices publish a bid count; about half publish an ITL1 delivery location, so the market column reads the authority’s registered region when the notice has none (labelled). About 30 % of award-vs-estimate pairs are exact matches — the buyer published the award at the estimate. n is on every figure; a thin sample is muted, never hidden.
  • “Match” and “relevance” are model scores from the nightly matcher, not published facts. Find a Tender does not publish who is bidding. Never shown: contact details, payment behaviour, or a recommended price.

Procedure terms & legal framework

From the official record
Procedure method
Competitive flexible procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Works
Notice status
Open admission
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Utilities
Commercial structure
Framework agreement
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
No (one-off requirement)
First published
2 Oct 2026, 13:59 BST
Last source update
2 Oct 2026, 13:59 BST
Award evaluation window
Submission end — 18 Feb 2027, 23:59 GMT
Latest notice
Tender notice (UK4)
Classification (CPV)
Building completion workBuilding construction workElectrical installation workElectrical wiring and fitting workEngineering works and construction worksMechanical engineering installation worksMechanical installationsOther building completion workOther electrical installation workPlumbing and sanitary works+2 more
Delivery area
West Midlands (UKG11)Wales (UKL)
Official registry OCID
ocds-h6vhtk-077fca Find a Tender
How it runs
DCC intends to conduct a Competitive Flexible Procedure comprising an initial Conditions of Participation stage, followed by an Invitation to Tender for suppliers that meet the required conditions and minimum thresholds. Tenders will be evaluated against the published award criteria and assessment methodology. DCC may seek clarifications and, where provided for in the procurement documents, undertake further tender more…rounds or refine aspects of the procurement. Following final evaluation, DCC intends to appoint up to three suppliers to each specialist sub-lot.

How to participate & submission route

Official notice Apply via Jaggaer
Submission portal named on this notice: Jaggaer · Who buys & how to bid on JAGGAER
Supplier login requiredElectronic submission allowedLanguage: EN
Access & registration note: Free; latest Chrome/Edge/Firefox only — corporate browsers fail
Expression of interest (EOI)
—
Appointment period ends
27 Oct 2026, 17:00 GMT
Clarification deadline
—
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release
https://dwrcymru-welshwater.bravosolution.co.uk Participation instructions — how to express an interest in this opportunity. 1) Register your organisation on the DCC eSourcing Portal (this is only required once so please check whether there is an existing account registered for your organisation — multiple users can be added as required); 2) Express an interest in the opportunity: — log in to the portal with your username and password, — click the 'PQQs/ ITTs Open to all more…Suppliers' link, — click on the relevant PQQ/ ITT to access the content, — click the 'Express Interest' button at the top of the page — this will move the PQQ/ ITT into your 'My PQQs/ITTs' page (this is a secure area reserved for your projects only), — you can now access any attachments by clicking 'Attachments' in the 'PQQ/ ITT details' box. 3) Responding to the Opportunity — click 'My Response' under 'PQQ/ ITT details'. You can choose to 'Create response' or 'Decline to Respond', — you can now use the messaging function to communicate with the buyer and seek any clarification, — note the deadline for completion and follow the onscreen instructions to complete your response — there may be a mixture of online and offline actions for you to perform, — you must then submit your reply using the 'Submit Response' button at the top of the page. Please Note the following — you must download the documents yourself after you have expressed interest, they will not be sent to you, — expressions of Interest will ONLY be accepted through the eSourcing Portal — all documentation must be returned electronically via the eSourcing Portal, — if you require any further assistance please consult the online help, or contact the eSourcing helpdesk using the contract information provided on the home page.

Timeline

4 published dates · Europe/London
  1. Tender notice publishedearlier today
    2 Oct 2026, 13:59 BST
  2. Admission / appointment period endsin 25 days · period end, not a bid countdown
    27 Oct 2026, 17:00 GMT
  3. Award decision expected byin 139 days
    18 Feb 2027, 23:59 GMT
  4. Contract startsin 180 days
    1 Apr 2027, 00:00 BST

Commercial outcome & contract awards

Nothing awarded yet
Awards (0)
No award published
Contracts (0)
No contract published
Bid statistics
No aggregate bid statistics published

Notice history

1 event · 1 release on Find a Tender
  1. Tender notice published
    2 Oct 2026, 13:59 BSTUK4

Contracting authority & participating public bodies

Dwr Cymru Cyfyngedig

Contracting authorityPrivate utility GB-COH: 02366777 Linea, Fortran Road,, Cardiff, Wales, CF3 0LT

Official documents & specifications (2)

Official links; attachments are not copied

Tender pack and attachments

  • Conflict of interest declarationtenderConflict of interest declarationNot published

Notices published for this procedure

  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender