Find a TenderPlanned procurementPreliminary market engagement notice
Published 2 Jul 2026, 15:26 BST

Official UK procurement notice

Construction Framework - Depot & Stations Infrastructure Works

Authority: Northern Trains Ltd (Public body)

Framework agreementWorksAbove thresholdUtilitiesSME suitable
Planned pipeline value£300,000,000pipeline notice, not a live tender
Tender notice expected Date not publishedfrom the planned procurement notice
Framework period 5 yrsends 1 Mar 2032 · up to 28 Feb 2035 with extensions · starts 1 Mar 2027

What is being bought

Published requirement description

Northern Trains Limited (NTL) intends to establish a Construction Framework Agreement to support the delivery of infrastructure works across its Train Care Centre estate and Stations. This Framework will form a key component of NTL's asset management and capital delivery strategy, enabling the efficient, consistent, and compliant delivery of works through a pre-qualified and capable supplier base.

The Framework will be structured across a number of specialist lots to ensure the appropriate alignment of contractor capability with the diverse and technically complex requirements of depot environments. The proposed lots are as follows:

-Lot 1- Internal Building Fit Outs

Comprises of:

  • Fit Out

-Storage & Spares

-Waste Security

-Fire Systems

-Heating & Ventilation

-Lot 2 Access and Component Movement Solutions

Comprises of:

-Access Solutions

-Component Removal & Movement

-Lot 3 Multi-discipline Railway Solutions and Integrated Major Projects

Comprises of:

-Fitout

-Access Solutions

-Component Removal & Movement

-Storage & Spares

-Waste Security

-Fire Systems

-Heating & Ventilation

-Servicing Facilities: CET, Tanking, Sanding, Fuel, Ad Blue, Screen -wash, Oils, Fluids

-Cleaning

-Special Tooling

-Electrification Works

-Track/ permanent Way

-Power, Mechanical and Electrical Installation

-HV

-Signalling

-Telecoms

-Civils & Buildings construction

-Geotechnical

-Environmental inc. Energy Drainage

-Highways/ Road Transport/ Walkways

-Systems

-Assurance

-Lot 4 Design & Build Specialist Train Servicing and Maintenance Solutions

Comprises of:

-Servicing Facilities: CET, Tanking, Sanding, Fuel, Ad Blue, Screen wash, Oils, Fluids

-Cleaning

-Special Tooling

-Environmental inc. Energy

The Framework is designed to facilitate the call-off of works packages on both a programme and project basis, providing flexibility, scalability, and value for money across a geographically dispersed portfolio of operational Train Care Centres and stations. Contractors will be required to deliver works in accordance with defined performance standards, operational constraints, and all applicable statutory and regulatory obligations, including those specific to the rail environment.

Suppliers appointed to the Framework will be expected to apply industry best practice and draw upon their technical expertise to achieve the following key objectives:

-Quality and Value Delivery: Deliver works to a high and consistent standard, ensuring cost efficiency and demonstrable value for money across all call-off contracts.

-Flexible and Scalable Delivery Model: Provide a responsive service capable of delivering a range of works packages of varying complexity, scale, and location, including the ability to support concurrent delivery across multiple depots.

-Safe and Operationally Compliant Execution: Ensure all activities are undertaken in full compliance with health and safety legislation, railway standards, and NTL operational requirements, maintaining a safe working environment within live depot settings.

-Operational Continuity: Deliver works in a manner that minimises disruption to depot operations and supports the continued availability and reliability of rolling stock.

-Asset Integrity and Longevity: Maintain and enhance depot assets in line with statutory requirements, relevant industry standards, and manufacturer guidance to ensure durability and whole-life performance.

-Performance and Continuous Improvement: Operate within a structured performance management regime, contributing to continuous improvement, innovation, and efficiencies across the Framework term.

NTL is seeking to establish collaborative, long-term relationships with Framework Contractors, underpinned by strong governance, effective contract management, and a shared commitment to delivering high-quality outcomes across its works infrastructure portfolio.

CPV: Construction work

How this framework works

From the published notice
Framework period
5 yrs · up to 8 yrs from 1 Mar 2027

The lotProcurement structure

single lot · no lot value published
Lot #1PlannedRenewal 5 yrsSME
Contract period: 1 Mar 2027 – 1 Mar 2032 (5 yrs) · up to 28 Feb 2035 with extensions
Delivery: North East, North West, Yorkshire & HumberEligibility: SME eligible
Extensions: Extension options published

Who is likely to bid for this lot ↓

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
What this means for your bid
  • “Construction Framework - Depot & Stations Infrastructure Works” is a framework: the contest is a place on its panel, not a single contract.

Pipeline intelligence · planning stage: how this market runs before the tender is published

How Northern Trains Limited buys Construction work (CPV 45), and who usually turns up

Northern Trains Limited’s own published record, next to the published market for the same work. This notice is a framework or DPS, so only frameworks and DPS are compared. Whole-market view: Construction work (CPV 45) →

1

How the contest usually goes

Winner shares use published awards; bid and price charts use contested lots.

Question for the bid
This buyerNorthern Trains Limited · all categories
The marketConstruction work (CPV 45) · Yorkshire and the Humber
What to do with it
How often do SMEs win?
i

How often small and medium firms win.

Share of awards where the winner’s size is known.

The counts under this question show how many awards have a known supplier size.

Last 36 months.

Buyer: 0 of 3 known-size awards · market: division 45 · Yorkshire and the Humber, n=172
0 of 375%

No small-firm winners recorded among this authority’s published awards in this sample.

How often do local suppliers win?
i

How often local firms win similar work.

Winners with a registered address in the delivery region, out of awards with a known address.

Here, local means registered in Yorkshire and the Humber.

A local branch does not count if the registered address is elsewhere.

Last 36 months.

Buyer: 2 of 3 known-location awards · market: division 45 · Yorkshire and the Humber, n=205
2 of 373%

Most of this buyer’s recorded winners are registered in Yorkshire and the Humber.

How long to a decision?
i

How long buyers here take to decide after bids close.

Middle value in days from the deadline to the first award notice, on competitions that published both dates.

Only decided tenders count, so slow ones still waiting are not in.

Last 36 months.

Buyer: 9 decided notices · market: division 45 · Yorkshire and the Humber, n=23
52 days89 days

Half of these awards were announced within 52 days of the bid deadline.

How often single-bid or direct?
i

How often work is awarded with no recorded rival.

Direct awards and tenders where every published lot count shows one bid.

The market share is a minimum: some awards have no bid count.

Thin markets produce this too; it is not proof of a tailored specification.

Last 36 months.

Buyer: exactly 0 of 2 procurements with awards had no recorded rival · market: division 45 · Yorkshire and the Humber, n=35
0 of 29%

Missing bid counts may hide more single-bid awards. This share is a minimum.

How many bids did past lots attract?

i

How many bids past lots received.

Each colour is a bid-count range. Only competed lots with a published count are included.

Past bids do not predict this tender.

Last 36 months.

This buyer3 lots with bid counts · all categories · too few to chart
The market136 lots with bid counts · division 45 · Yorkshire and the Humber
4% had one bid
Market · select a colour for counts
1 bid4%
Market: 6 of 136 lots with published bid counts.
2–310%
Market: 13 of 136 lots with published bid counts.
4–621%
Market: 28 of 136 lots with published bid counts.
7+65%
Market: 89 of 136 lots with published bid counts.

How did awards compare with estimates?

i

Where winning prices landed against estimates.

Each colour shows awards below, close to or above the published estimate, one lot at a time.

On a framework or DPS, prices are agreed when work is called off.

Past prices are a guide, not a bid price.

Last 36 months.

Not comparable on a framework or DPS. The notice sets up a supplier panel and a ceiling value; what the work actually costs is agreed later, on each call-off or mini-competition, and those publish as contract notices of their own. The award-vs-estimate record of this market therefore sits on the call-offs; this page shows it on the contracts, not on the panel that frames them.

2

Assess each lot
i

What past awards tell you about each lot.

See the forecast, this buyer’s earlier suppliers and firms with relevant wins.

No supplier is confirmed as a bidder.

Open a lot for its forecast, this buyer’s previous supplier and possible competitors, from published award history, not a bid list

Our matching links this notice to “Framework for Pre-Construction Services” of this authority, but none of the 12 panel members sit in a category matching this notice.

Lot #160 monthsSME suitablePublished estimate£300m
Expected competition
i

How many bids this lot may attract.

The forecast uses similar past competitions. The bar shows either that forecast or past bid counts; the line below says which.

Each lot shows its own forecast based on its own category; forecasts for different lots of the same notice are not comparative. The bar shows 136 past lots.

A forecast, not a list of bidders.

—No model forecast yet4% single-bid risk
Past bids on 136 similar lots
1 bid4%
6 of 136 similar past lots received 1 bid (4%).
2–310%
13 of 136 similar past lots received 2–3 (10%).
4–621%
28 of 136 similar past lots received 4–6 (21%).
7+65%
89 of 136 similar past lots received 7+ (65%).
Comparable past lots usually drew 9 bids.
Commercial price forecast
i

Where the award price may land.

The forecast uses similar awards and the buyer’s estimate. The band covers the middle half of likely prices.

No comparable awards for this lot yet.

A statistical guide from past awards, not a price to bid.

—Priced at call-off
On a framework or DPS the price is agreed on each call-off, so there is no award price to forecast here: the published figure is a ceiling.

Who has supplied this buyer on similar work?
i

Who has done similar work for this buyer.

Past contracts are matched by buyer, title and type of work.

A past supplier may not bid again.

No earlier contract of this buyer matches this lot on the published record.

Who could compete for this lot?
i

Who could compete for this lot?

Firms with relevant past wins. On a framework, we show firms on that agreement.

None is confirmed as a bidder.

Candidate suppliers for this notice have not been worked out yet, so this is not a verdict that nobody fits.

About this data
  • Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
  • Two views, kept apart. The authority’s own track record and the wider market for the same kind of work sit side by side and are never mixed. Where the local picture is too thin, a figure widens to a broader market and says which one it used.
  • Forecasts are labelled. The price forecast and its range, possible competitors and the earlier-work matches are our estimates from past awards: not published facts, not win chances and not price advice. Official notices do not say who is bidding.
  • Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.

What this replaces
i

Who has done similar work for this buyer.

Past contracts are matched by buyer, title and type of work.

40% title match.

A past supplier may not bid again.

The prior contract this notice most likely re-tenders · matched by title and category (40% title match), the holder is not guaranteed to re-bid

Framework for Pre-Construction Services — held by SNC-Lavalin Rail & Transit Limited and STRZALA ARCHITECTS LIMITED (+1 more); no contract end date published.

Procedure terms & legal framework

From the official record
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Works
Notice status
Planned procurement
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Utilities
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
2 Jul 2026, 15:26 BST
Last source update
3 Jul 2026, 08:08 BST
FTS notice number
2026/S 000-062552
Latest notice
Preliminary market engagement notice (UK2)
Classification (CPV)
Construction work
Delivery area
North East (UKC)North West (UKD)Yorkshire & Humber (UKE)
Official registry OCID
ocds-h6vhtk-06c2a4 Find a Tender

How it was run

Official notice
Appointment period ends
—

Timeline

2 Jul 2026 → 1 Mar 2027 · 3 dates
  1. Planning notice published111 days ago
    2 Jul 2026, 15:26 BST
  2. Market engagement98 days ago
    14 Jul 2026, 23:59 BST

    Northern Trains Limited ("NTL") is seeking to undertake early market engagement with suitably qualified and experienced Suppliers in advance of a forthcoming procurement to establish a Train Care Centre & Stations Construction Framework.

    The proposed Framework will support the delivery of a programme of works across NTL's Train Care Cantres & Stations, including (but not limited to) civil, structural, mechanical, electrical, and associated infrastructure upgrades required to facilitate current operations and the introduction of new rolling stock.

    NTL invites interested Suppliers to attend a virtual Pre-Market Engagement session, which will be held on:

    14th July 2026 at 10:00am via Microsoft Teams

    The session will include a presentation delivered by the Project and Procurement Teams, outlining the strategic objectives of the Framework, the anticipated scope of works, and the proposed procurement approach.

    The session will provide insight into the following areas:

    -Overview of the Train Care Centres & Stations Construction Framework and programme objectives

    -Scope of works and technical requirements across the Train Care Centres & Stations

    -Anticipated lotting structure and delivery model (where applicable)

    -Procurement route, timelines, and key milestones

    NTL is also seeking feedback from the market to help inform the development of the procurement strategy, including:

    -Proposed contracting model (e.g. framework structure, call-off -mechanisms)

    -Packaging and subcontracting opportunities

    -Pricing approaches and cost management mechanisms

    -Commercial terms and risk allocation

    Following the engagement session, participating Suppliers will be invited to complete a short questionnaire to capture feedback on the proposed approach.

    NTL may also invite Suppliers to participate in one-to-one follow-up meetings, which are expected to take place shortly after the session. These meetings will provide an opportunity to explore feedback in greater detail, including views on constructability, delivery risks, and optimal commercial arrangements. Selection for these sessions will be at NTL's sole discretion.

    This pre-market engagement is being undertaken to inform NTL's approach and does not constitute a commitment to commence a procurement process.

    To express interest in attending the Pre-Market Engagement session, please email:

    Please include your organisation's name, contact details and the name of attendees. A calendar invitation with joining details will follow.

    Suppliers should note that there is no obligation to take part in this preliminary market engagement exercise and that if they do not take part, it will not preclude them from the subsequent related procurement process. Engaging Suppliers will not receive preferential treatment in any procurement tender process, and this is in no way an indication of the selection of any organisation or a guarantee of future work.

  3. Today
    21 Oct 2026
  4. Contract startsin 131 days
    1 Mar 2027

Notice history

2 events · 2 releases on Find a Tender · since 2 Jul 2026
  1. Preliminary market engagement notice published
    2 Jul 2026, 15:26 BST
    UK2
  2. Preliminary market engagement notice published
    3 Jul 2026, 08:08 BST
    UK2
Published amendments (1)

Email address has been updated to express interest for the Pre Market Engagement.

Commercial outcome & contract awards

Pipeline notice
Awards (0)
No award published
Contracts (0)
No contract published
Bid statistics
No aggregate bid statistics published

Contracting authority & participating public bodies

NORTHERN TRAINS LIMITED

Contracting authorityPublic authority - central government GB-COH: 03076444 · GB-PPON: PZCJ-2164-HJQZ George Stephenson House, York, Yorkshire & Humber, YO1 6JTContact email

Official documents & specifications (2)

Official links; attachments are not copied

Notices published for this procedure