Construction Framework - Depot & Stations Infrastructure Works
Authority: Northern Trains Ltd (Public body)
What is being bought
Published requirement descriptionNorthern Trains Limited (NTL) intends to establish a Construction Framework Agreement to support the delivery of infrastructure works across its Train Care Centre estate and Stations. This Framework will form a key component of NTL's asset management and capital delivery strategy, enabling the efficient, consistent, and compliant delivery of works through a pre-qualified and capable supplier base.
The Framework will be structured across a number of specialist lots to ensure the appropriate alignment of contractor capability with the diverse and technically complex requirements of depot environments. The proposed lots are as follows:
-Lot 1- Internal Building Fit Outs
Comprises of:
- Fit Out
-Storage & Spares
-Waste Security
-Fire Systems
-Heating & Ventilation
-Lot 2 Access and Component Movement Solutions
Comprises of:
-Access Solutions
-Component Removal & Movement
-Lot 3 Multi-discipline Railway Solutions and Integrated Major Projects
Comprises of:
-Fitout
-Access Solutions
-Component Removal & Movement
-Storage & Spares
-Waste Security
-Fire Systems
-Heating & Ventilation
-Servicing Facilities: CET, Tanking, Sanding, Fuel, Ad Blue, Screen -wash, Oils, Fluids
-Cleaning
-Special Tooling
-Electrification Works
-Track/ permanent Way
-Power, Mechanical and Electrical Installation
-HV
-Signalling
-Telecoms
-Civils & Buildings construction
-Geotechnical
-Environmental inc. Energy Drainage
-Highways/ Road Transport/ Walkways
-Systems
-Assurance
-Lot 4 Design & Build Specialist Train Servicing and Maintenance Solutions
Comprises of:
-Servicing Facilities: CET, Tanking, Sanding, Fuel, Ad Blue, Screen wash, Oils, Fluids
-Cleaning
-Special Tooling
-Environmental inc. Energy
The Framework is designed to facilitate the call-off of works packages on both a programme and project basis, providing flexibility, scalability, and value for money across a geographically dispersed portfolio of operational Train Care Centres and stations. Contractors will be required to deliver works in accordance with defined performance standards, operational constraints, and all applicable statutory and regulatory obligations, including those specific to the rail environment.
Suppliers appointed to the Framework will be expected to apply industry best practice and draw upon their technical expertise to achieve the following key objectives:
-Quality and Value Delivery: Deliver works to a high and consistent standard, ensuring cost efficiency and demonstrable value for money across all call-off contracts.
-Flexible and Scalable Delivery Model: Provide a responsive service capable of delivering a range of works packages of varying complexity, scale, and location, including the ability to support concurrent delivery across multiple depots.
-Safe and Operationally Compliant Execution: Ensure all activities are undertaken in full compliance with health and safety legislation, railway standards, and NTL operational requirements, maintaining a safe working environment within live depot settings.
-Operational Continuity: Deliver works in a manner that minimises disruption to depot operations and supports the continued availability and reliability of rolling stock.
-Asset Integrity and Longevity: Maintain and enhance depot assets in line with statutory requirements, relevant industry standards, and manufacturer guidance to ensure durability and whole-life performance.
-Performance and Continuous Improvement: Operate within a structured performance management regime, contributing to continuous improvement, innovation, and efficiencies across the Framework term.
NTL is seeking to establish collaborative, long-term relationships with Framework Contractors, underpinned by strong governance, effective contract management, and a shared commitment to delivering high-quality outcomes across its works infrastructure portfolio.
CPV: Construction work
How this framework works
From the published notice- Framework period
- 5 yrs · up to 8 yrs from 1 Mar 2027
The lotProcurement structure
single lot · no lot value publishedLot #1PlannedRenewal
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
- “Construction Framework - Depot & Stations Infrastructure Works” is a framework: the contest is a place on its panel, not a single contract.
Pipeline intelligence · planning stage: how this market runs before the tender is published
How Northern Trains Limited buys Construction work (CPV 45), and who usually turns up
Northern Trains Limited’s own published record, next to the published market for the same work. This notice is a framework or DPS, so only frameworks and DPS are compared. Whole-market view: Construction work (CPV 45) →
How the contest usually goes
Winner shares use published awards; bid and price charts use contested lots.
i
How often small and medium firms win.
Share of awards where the winner’s size is known.
The counts under this question show how many awards have a known supplier size.
No small-firm winners recorded among this authority’s published awards in this sample.
i
How often local firms win similar work.
Winners with a registered address in the delivery region, out of awards with a known address.
Here, local means registered in Yorkshire and the Humber.
A local branch does not count if the registered address is elsewhere.
Most of this buyer’s recorded winners are registered in Yorkshire and the Humber.
i
How long buyers here take to decide after bids close.
Middle value in days from the deadline to the first award notice, on competitions that published both dates.
Only decided tenders count, so slow ones still waiting are not in.
Half of these awards were announced within 52 days of the bid deadline.
i
How often work is awarded with no recorded rival.
Direct awards and tenders where every published lot count shows one bid.
The market share is a minimum: some awards have no bid count.
Thin markets produce this too; it is not proof of a tailored specification.
Missing bid counts may hide more single-bid awards. This share is a minimum.
How many bids did past lots attract?
i
How many bids past lots received.
Each colour is a bid-count range. Only competed lots with a published count are included.
Past bids do not predict this tender.
1 bid4%
2–310%
4–621%
7+65%
How did awards compare with estimates?
i
Where winning prices landed against estimates.
Each colour shows awards below, close to or above the published estimate, one lot at a time.
On a framework or DPS, prices are agreed when work is called off.
Past prices are a guide, not a bid price.
Not comparable on a framework or DPS. The notice sets up a supplier panel and a ceiling value; what the work actually costs is agreed later, on each call-off or mini-competition, and those publish as contract notices of their own. The award-vs-estimate record of this market therefore sits on the call-offs; this page shows it on the contracts, not on the panel that frames them.
Assess each lot i
What past awards tell you about each lot.
See the forecast, this buyer’s earlier suppliers and firms with relevant wins.
No supplier is confirmed as a bidder.
i
What past awards tell you about each lot.
See the forecast, this buyer’s earlier suppliers and firms with relevant wins.
No supplier is confirmed as a bidder.
Open a lot for its forecast, this buyer’s previous supplier and possible competitors, from published award history, not a bid list
Our matching links this notice to “Framework for Pre-Construction Services” of this authority, but none of the 12 panel members sit in a category matching this notice.
Lot #1Published estimate£300m
i
How many bids this lot may attract.
The forecast uses similar past competitions. The bar shows either that forecast or past bid counts; the line below says which.
Each lot shows its own forecast based on its own category; forecasts for different lots of the same notice are not comparative. The bar shows 136 past lots.
A forecast, not a list of bidders.
1 bid4%
2–310%
4–621%
7+65%
i
Where the award price may land.
The forecast uses similar awards and the buyer’s estimate. The band covers the middle half of likely prices.
No comparable awards for this lot yet.
A statistical guide from past awards, not a price to bid.
Who has supplied this buyer on similar work? i
Who has done similar work for this buyer.
Past contracts are matched by buyer, title and type of work.
A past supplier may not bid again.
i
Who has done similar work for this buyer.
Past contracts are matched by buyer, title and type of work.
A past supplier may not bid again.
No earlier contract of this buyer matches this lot on the published record.
Who could compete for this lot? i
Who could compete for this lot?
Firms with relevant past wins. On a framework, we show firms on that agreement.
None is confirmed as a bidder.
i
Who could compete for this lot?
Firms with relevant past wins. On a framework, we show firms on that agreement.
None is confirmed as a bidder.
Candidate suppliers for this notice have not been worked out yet, so this is not a verdict that nobody fits.
About this data
- Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
- Two views, kept apart. The authority’s own track record and the wider market for the same kind of work sit side by side and are never mixed. Where the local picture is too thin, a figure widens to a broader market and says which one it used.
- Forecasts are labelled. The price forecast and its range, possible competitors and the earlier-work matches are our estimates from past awards: not published facts, not win chances and not price advice. Official notices do not say who is bidding.
- Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.
What this replaces i
Who has done similar work for this buyer.
Past contracts are matched by buyer, title and type of work.
40% title match.
A past supplier may not bid again.
i
Who has done similar work for this buyer.
Past contracts are matched by buyer, title and type of work.
40% title match.
A past supplier may not bid again.
The prior contract this notice most likely re-tenders · matched by title and category (40% title match), the holder is not guaranteed to re-bid
Framework for Pre-Construction Services — held by SNC-Lavalin Rail & Transit Limited and STRZALA ARCHITECTS LIMITED (+1 more); no contract end date published.
Procedure terms & legal framework
From the official record- Legal basis
- UKPGA · 2023/54 Procurement Act 2023
- Procurement category
- Works
- Notice status
- Planned procurement
- Procurement threshold
- Above threshold (FTS publication)
- Regulatory regime
- Utilities
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Unspecified in notice
- First published
- 2 Jul 2026, 15:26 BST
- Last source update
- 3 Jul 2026, 08:08 BST
- FTS notice number
2026/S 000-062552- Latest notice
- Preliminary market engagement notice (UK2)
- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-06c2a4Find a Tender
How it was run
Official notice- Appointment period ends
- —
Timeline
2 Jul 2026 → 1 Mar 2027 · 3 dates- Planning notice published111 days ago2 Jul 2026, 15:26 BST
- Market engagement98 days ago14 Jul 2026, 23:59 BST
Northern Trains Limited ("NTL") is seeking to undertake early market engagement with suitably qualified and experienced Suppliers in advance of a forthcoming procurement to establish a Train Care Centre & Stations Construction Framework.
The proposed Framework will support the delivery of a programme of works across NTL's Train Care Cantres & Stations, including (but not limited to) civil, structural, mechanical, electrical, and associated infrastructure upgrades required to facilitate current operations and the introduction of new rolling stock.
NTL invites interested Suppliers to attend a virtual Pre-Market Engagement session, which will be held on:
14th July 2026 at 10:00am via Microsoft Teams
The session will include a presentation delivered by the Project and Procurement Teams, outlining the strategic objectives of the Framework, the anticipated scope of works, and the proposed procurement approach.
The session will provide insight into the following areas:
-Overview of the Train Care Centres & Stations Construction Framework and programme objectives
-Scope of works and technical requirements across the Train Care Centres & Stations
-Anticipated lotting structure and delivery model (where applicable)
-Procurement route, timelines, and key milestones
NTL is also seeking feedback from the market to help inform the development of the procurement strategy, including:
-Proposed contracting model (e.g. framework structure, call-off -mechanisms)
-Packaging and subcontracting opportunities
-Pricing approaches and cost management mechanisms
-Commercial terms and risk allocation
Following the engagement session, participating Suppliers will be invited to complete a short questionnaire to capture feedback on the proposed approach.
NTL may also invite Suppliers to participate in one-to-one follow-up meetings, which are expected to take place shortly after the session. These meetings will provide an opportunity to explore feedback in greater detail, including views on constructability, delivery risks, and optimal commercial arrangements. Selection for these sessions will be at NTL's sole discretion.
This pre-market engagement is being undertaken to inform NTL's approach and does not constitute a commitment to commence a procurement process.
To express interest in attending the Pre-Market Engagement session, please email:
- Amber Darby-Lunn ([email protected]) and
- Daniel Yates ([email protected])
Please include your organisation's name, contact details and the name of attendees. A calendar invitation with joining details will follow.
Suppliers should note that there is no obligation to take part in this preliminary market engagement exercise and that if they do not take part, it will not preclude them from the subsequent related procurement process. Engaging Suppliers will not receive preferential treatment in any procurement tender process, and this is in no way an indication of the selection of any organisation or a guarantee of future work.
- Today21 Oct 2026
- Contract startsin 131 days1 Mar 2027
Notice history
2 events · 2 releases on Find a Tender · since 2 Jul 2026- Preliminary market engagement notice published2 Jul 2026, 15:26 BSTUK2
- Preliminary market engagement notice published3 Jul 2026, 08:08 BSTUK2
Published amendments (1)
Email address has been updated to express interest for the Pre Market Engagement.
Commercial outcome & contract awards
Pipeline notice- Awards (0)
- No award published
- Contracts (0)
- No contract published
- Bid statistics
- No aggregate bid statistics published
Contracting authority & participating public bodies
Official documents & specifications (2)
Official links; attachments are not copiedNotices published for this procedure
- Preliminary market engagement notice Preliminary market engagement notice on Find a Tender
- Preliminary market engagement notice Preliminary market engagement notice on Find a Tender