Find a TenderAwardedContract award notice
Published 31 Oct 2025, 11:23 GMT

Official UK procurement notice

Combined Heat and Power Engines

Official notice

Authority: THAMES WATER UTILITIES LIMITED (Public body)

Open framework schemeGoodsCompetitive flexible procedureAbove thresholdUtilitiesSME suitable
Framework ceiling (notional)£0framework ceiling, not attributable revenue
Submissions closed 28 Nov 2025awarded 5 Aug 2026
Award (standstill) to Edina UK Limited
Framework period 8 yrsends 30 May 2034 · starts 1 Jun 2026

What is being bought

Published requirement description

This procurement relates to the supply, commissioning and maintenance support of Combined Heat and Power (CHP) engines across multiple Thames Water wastewater treatment sites to maximise engine availability / performance. The scope includes the provision of new CHP units and associated services to support operational efficiency and energy recovery, as well as spare parts stock holding and technical support.

Objectives and Expected Outcomes

Effective utilisation of the biogas produced during the treatment of sludge, minimising flaring of gas, maximising electrical heat and power production

  • Securing Capacity: Ensure supply of CHP Engine requirement through AMP 8 and AMP9
  • Standardisation: Promote consistency across the CHP estate to reduce complexity and improve asset availability
  • Commercial Value: Leverage volume-based incentives and long-term value through strategic sourcing
  • Serviceability: Ensure availability of cost-effective spare parts and technical support
  • Efficiency & Sustainability: Support energy recovery and carbon reduction goals by securing high-performance, low-emission CHP solutions
  • Regulatory Changes: Ensure compliance with evolving regulatory requirements
  • Innovation: Accommodate benefits from innovation

Procurement Approach: A competitive tender process will be undertaken to appoint a supplier capable of delivering the full scope. We anticipate awarding the contract to a single supplier but reserve the right to award to more than one supplier if it is deemed to deliver best value.

Background: Thames Water (TW) currently operates 47 Combined Heat and Power Engines (CHP) across 24 wastewater treatment sites. These engines vary in age, size and output, and many are approaching the end of their lifecycle (typically 20 years).

Anticipated Requirements:

  • Replacement of end-of-life engines during AMP 8 with estimated 10 - 16 new engines (Estimated range between 100kW - 1500kW electrical output) expected to be installed within AMP 8 alone. Further new engines will be required for AMP 9
  • Specification: to be provided at PSQ
  • Support innovation: We are always looking for ways to improve what we do, and welcome innovative ideas/solutions
  • Compliance with evolving environmental regulations, especially around emissions to air (e.g. methane slip and possible carbon capture under the Industrial Emissions Directive)
  • Integration of AMP 9 requirements, to leverage further standardisation and volume based discounts: The engines on an additional 7 wastewater treatment sites planned to be upgraded in AMP 9

What we anticipate purchasing

TW is seeking to procure a comprehensive solution for CHP engines, which includes:

  • Supply, installation, and commissioning of new CHP engines across the TW estate
  • Ancillary components required for engine connection and operation
  • Provision of spare parts to support ongoing maintenance
  • Planned and reactive maintenance in line with the manufacturers O&M manual
  • Technical support to ensure safe and efficient operation through the lifecycle of the asset

The procurement will cover both replacement of end-of-life engines and new installations to meet growing demand. The current aim is to award a single-source agreement to enable standardisation, improve serviceability, and reduce complexity across the estate.

  • How the procedure runs: The procurement will follow a Competitive Flexible Procedure in line with the Procurement Act 2023. The process will include multiple stages, with opportunities for clarification, negotiation, and refinement of award criteria before final contract award. Stage 1: Tender Notice Publication • The process begins with the publication of the Contract Notice on the Find a Tender Service (FTS) • This will outline the scope of requirements, procurement stages, and timelines Stage 2: Pre-Specific Questionnaire (PSQ) • PSQ Publication: The PSQ will be published alongside the contract notice • Supplier Response: Suppliers will complete and submit the PSQ by the stated deadline • Clarification Period: A defined window will allow suppliers to raise queries and Thames Water to provide clarifications • Evaluation: PSQ responses will be assessed on a pass/fail basis against mandatory criteria • Outcome: Successful suppliers will be shortlisted and invited to the next stage Stage 3: Preliminary Tender Submission • Issue of Documents: Shortlisted suppliers will receive the full information pack • Clarification: Suppliers submit any clarification questions to the tender. TW will answer • Submissions: Suppliers submit bid submissions (technical and commercial proposals) • Clarification and Questions: TW submit clarifications and questions to the supplier responses • Evaluation: Submissions are assessed against published criteria Stage 4: Negotiation Stage • Shortlisted suppliers will receive invitations to negotiate and further information about the process • Negotiation and Refinement: Negotiations with suppliers to refine solutions and optimise value • Updated Submissions: Suppliers to submit revised bids following negotiation rounds Stage 5: Final Evaluation and Selection • Evaluation: Final submissions are evaluated against weighted criteria Stage 6: Contract Award • Notification: Successful and unsuccessful suppliers will be informed in writing • Standstill Period: A mandatory standstill period will apply before contract signature • Contract Execution: Following standstill, the contract will be awarded and signed

CPV: Heat-exchange units, air-conditioning and refrigerating equipment, and filtering machinery · Repair and maintenance services of machinery · Spark-ignition engines · Turbines and motors

How this framework works

From the published notice
Type
Closed framework · open framework scheme (admission reopens)
Call-offs
call-offs are awarded directly to appointed suppliers, without further competition
Framework period
8 yrs from 1 Jun 2026
Published description of the framework

This framework agreement establishes the terms under which contracting authorities may award future call-off contracts for the provision of Combined Heat and Power Engines. It is designed to ensure transparency, value for money, and fair competition in accordance with the Procurement Act 2023.

Price Determination

Prices under this framework may be determined through one or more of the following mechanisms:

  • Pre-agreed rate cards: Suppliers submit fixed or benchmarked rates for defined roles or services at the framework stage
  • Scenario testing: Contracting authorities may model pricing across different service configurations to assess cost-effectiveness
  • Negotiation levers: Prior to award, authorities may negotiate discounts, rebates, offshoring commitments, or payment profiling to optimise commercial outcomes

Award of Contracts

Contracts awarded under this framework will follow:

  • Direct Award: Where the framework is with a single supplier or where the framework clearly defines the call-off terms and includes an objective mechanism for supplier selection

The framework will be awarded based on the Most Advantageous Tender (MAT), taking into account price, quality, and other relevant criteria as defined.

The lotProcurement structure

single lot · value published

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored
Quality: 60%Price: 40%
Published sub-criteria (2)
  • Technical: 60%
  • Commercial: 40%
Published award criteria (2)
  • Commercial
  • Technical
What this means for your bid
  • Price carries 40 of 100 points: a 10% discount moves about 4 points. The method statement decides this lot, not the discount.
  • “Combined Heat and Power Engines” is a framework: the contest is a place on its panel, not a single contract, and call-offs are awarded directly: getting appointed is the whole game.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Competitive flexible procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Goods
Notice status
Awarded
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Utilities
Commercial structure
Open framework scheme
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
31 Oct 2025, 11:23 GMT
Last source update
5 Aug 2026, 11:57 BST
Award evaluation window
Submission end – 30 Mar 2026
Authority reference
FA2277
FTS notice number
2025/S 000-070025
Latest notice
Contract award notice (UK6)
Classification (CPV)
Heat-exchange units, air-conditioning and refrigerating equipment, and filtering machineryRepair and maintenance services of machinerySpark-ignition enginesTurbines and motors
Delivery area
London (UKI)South East (UKJ)
Official registry OCID
ocds-h6vhtk-05d7ce Find a Tender
How it runs

The procurement will follow a Competitive Flexible Procedure in line with the Procurement Act 2023. The process will include multiple stages, with opportunities for clarification, negotiation, and refinement of award criteria before final contract award.

Stage 1: Tender Notice Publication

  • The process begins with the publication of the Contract Notice on the Find a Tender Service (FTS)
  • This will outline the scope of requirements, procurement stages, and timelines

Stage 2: Pre-Specific Questionnaire (PSQ)

  • PSQ Publication: The PSQ will be published alongside the contract notice
  • Supplier Response: Suppliers will complete and submit the PSQ by the stated deadline
  • Clarification Period: A defined window will allow suppliers to raise queries and Thames Water to provide clarifications
  • Evaluation: PSQ responses will be assessed on a pass/fail basis against mandatory criteria
  • Outcome: Successful suppliers will be shortlisted and invited to the next stage

Stage 3: Preliminary Tender Submission

  • Issue of Documents: Shortlisted suppliers will receive the full information pack
  • Clarification: Suppliers submit any clarification questions to the tender. TW will answer
  • Submissions: Suppliers submit bid submissions (technical and commercial proposals)
  • Clarification and Questions: TW submit clarifications and questions to the supplier responses
  • Evaluation: Submissions are assessed against published criteria

Stage 4: Negotiation Stage

  • Shortlisted suppliers will receive invitations to negotiate and further information about the process
  • Negotiation and Refinement: Negotiations with suppliers to refine solutions and optimise value
  • Updated Submissions: Suppliers to submit revised bids following negotiation rounds

Stage 5: Final Evaluation and Selection

  • Evaluation: Final submissions are evaluated against weighted criteria

Stage 6: Contract Award

  • Notification: Successful and unsuccessful suppliers will be informed in writing
  • Standstill Period: A mandatory standstill period will apply before contract signature
  • Contract Execution: Following standstill, the contract will be awarded and signed

How it was run

Official notice
Run through: portal not identified
Electronic submission allowedLanguage: EN
Appointment period ends
28 Nov 2025, 10:00 GMT
Clarification deadline
14 Nov 2025, 17:00 GMT
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

To gain access to the PSQ documents, please fill out the details from this form;

forms.office.com/e/pb0jdHXSdy ↗

Timeline

31 Oct 2025 → 17 Aug 2026 · 8 dates
  1. Tender notice published354 days ago
    31 Oct 2025, 11:23 GMT
  2. Clarification questions by340 days ago
    14 Nov 2025, 17:00 GMT
  3. Admission / appointment period ends327 days ago · period end, not a bid countdown
    28 Nov 2025, 10:00 GMT
  4. Award decision expected by204 days ago
    30 Mar 2026, 23:59 BST
  5. Contract starts142 days ago
    1 Jun 2026, 00:00 BST
  6. Assessment summaries sent77 days ago
    5 Aug 2026, 00:00 BST
  7. Latest notice published76 days ago
    5 Aug 2026, 11:57 BST
  8. Standstill ends64 days ago
    17 Aug 2026, 23:59 BST

Notice history

6 events · 3 releases on Find a Tender · since 31 Oct 2025
  1. Tender notice published
    31 Oct 2025, 11:23 GMT
    UK4
  2. Tender notice published
    7 Nov 2025, 10:31 GMT
    UK4
  3. Contract award notice published
    5 Aug 2026, 11:57 BST
    UK6
  4. Status changed to complete
    5 Aug 2026, 11:57 BST
  5. Procurement method changed
    5 Aug 2026, 11:57 BST
  6. Contract signature expected
    1 Sept 2026, 23:59 BST
    scheduled
Published amendments (1)

Please note we have moved the date of PSQ clarifications to the 14th November 2025, at 5 pm.

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awarded toValueDateStatus
Edina UK LimitedSMEVCSE1 Sept 2026 – 1 Sept 2029 · up to 1 Sept 2034Extensions: Thames Water may, at its sole discretion, extend the Contract beyond the initial term of three (3) years for a period of up to five (5) additional years, resulting in a maximum total Contract term of eight (8) years. Any extension may be exercised as a single extension period or for a shorter period determined by Thames Water, provided that the total Contract duration does not exceed eight (8) years. Extensions may be exercised where Thames Water determines that continued service delivery represents value for money, the Supplier has performed satisfactorily against the Contract requirements, and there remains an ongoing business need for the services.—5 Aug 2026standstill to 17 Aug 2026Standstill

Contracting authority & participating public bodies

THAMES WATER UTILITIES LIMITED

Contracting authorityPrivate utility GB-COH: 02366661 · GB-PPON: PNQQ-4647-DTCV Clearwater Court, Reading, South East, RG1 8DBContact email

Framework contractors & participating bidders

1 commercial party on the notice
  • Edina UK LtdFramework contractorGB-COH: 5660595GB-PPON: PYZZ-5476-TXZR Unit 12-13 Rugby Park, Bletchley Road, Stockport, North West, SK4 3EJContact email

Official documents & specifications (3)

Official links; attachments are not copied

Notices published for this procedure

  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender