Lot 1
No lot description published.
Award criteria
Pricing from the commercial model (30%)
Quality based on written responses (70%)
Arc Property Services Partnership Limited (the “Client”) intends to procure a single-supplier framework agreement for the provision of a comprehensive range of mechanical engineering works acrossthe operational estate that it manages on behalf of Nottinghamshire County Council (NCC). The Framework will provide access to a suitably qualified and experienced Contractor capable of delivering planned works on an as-required basis. The services will support the Client’s construction, maintenance, and asset management activities across multiple sites. The scope of services to be delivered under the Framework includes, but is not limited to: - Plumbing and water systems: installation, maintenance and repair of hot and cold-water services, drainage systems, sanitaryware, thermostatic mixing valves (TMVs), unvented systems, and water hygiene activities. - Heating and mechanical plant: servicing, maintenance and installation of heating systems (including gas, oil, electric and renewable technologies), distribution systems, pressurisation units, and associated plant. - Fuel, gas and energy infrastructure: installation and maintenance of fuel storage systems, gas installations, associated safety systems, detection equipment, and energy infrastructure. - Controls and building management systems (BMS/BEMS): provision, maintenance and modification of controls, sensors, panels, valves and automation systems used to monitor and manage mechanical services. - Installation, alteration and minor works: new installations, replacement works, adaptations to existing pipework systems, removal of redundant systems (including dead legs), strip-out works, and associated making-good of building fabric. - Testing, commissioning and compliance: full testing, commissioning and certification of systems, including statutory compliance, earthing and bonding where applicable, and handover documentation. The Framework will operate under the NEC4 Framework Contract and will enable the Client to commission individual call-off contracts for specific projects or service requirements. Call-off contracts will be arranged via quotation utilising the prices set within the Framework Commercial model. The Framework will cover a geographically dispersed estate, with works located across Nottinghamshire (main area), Derbyshire, South Yorkshire, and Leicestershire. The anticipated initial term of the Framework is two (2) years, with options to extend for a further two (2) years plus one (1) year (2+2+1), giving a maximum potential duration of five (5) years. The 5 years framework is to be utilised to coincide with the current end of Arc Partnership's arrangement with Nottinghamshire County Council. The total value of the Framework over its full term is £13,200,000 (inclusive of VAT), however there is no guarantee as to the value or volume of work provided. The procurement will be conducted in accordance with the Procurement Act 2023 using a competitive flexible procedure, comprising a two-stage process: - Stage 1 - Selection Criteria - The Bidder must meet or exceed the selection criteria based on the required qualifications and experience to confirm that they have the correct capacity, competency and capability to meet the framework requirements. Bidders who receive PASS marks from the selection criteria will then have their selection criteria questions evaluated and the 4 highest scoring bidders will move to stage 2. - Stage 2 - Award Criteria - The remaining Bidders will be asked a series of quality questions and shall provide prices within a commercial model. These will be assessed against a set criteria based on a 70% quality / 30% price evaluation weighting. The highest scoring Bidder will be deemed to have provided the Most Advantageous Tender (MAT) and will be awarded the Framework. The successful supplier will be expected to work collaboratively with the Client, contribute to social value outcomes, support carbon reduction objectives and demonstrate high standards of health and safety, compliance, and service delivery across all commissioned works.
UKF, GB
No lot description published.
Award criteria
Pricing from the commercial model (30%)
Quality based on written responses (70%)
| Item | Category | Quantity |
|---|---|---|
| 1 | Mechanical installations, Installation services of electrical and mechanical equipment, Architectural, construction, engineering and inspection services, Construction-related services, Technical testing, analysis and consultancy services, Consulting services for water-supply and waste consultancy | Not published |
Benchmarked against retained Find a Tender procedures with CPV division 45. The category anchor is Mechanical installations (45350000); this is a deliberately broad market comparator. The comparison is shown at several levels rather than pretending one company or region is always the best benchmark.
| Comparison set | Procedures | Reported bids per procedure | Named award suppliers | Price evidence |
|---|---|---|---|---|
| Market: CPV division 45 | 8,869 | 4 median · 24.8 average (1,941 of 8,869 with a bid count) | 3.8 average (2,130 of 8,869 with named award suppliers) | Not published |
| Same buyer | 7 | Not published | Not published | Not published |
| Delivery region: UKF | 694 | 2 median · 21.2 average (107 of 694 with a bid count) | 5 average (113 of 694 with named award suppliers) | Not published |
| Similar published value (0.5×–2×) | 814 | 6 median · 9.5 average (11 of 814 with a bid count) | 4.2 average (11 of 814 with named award suppliers) | Not published |
“Reported bids” is an official aggregate, sometimes reported per lot; it is the closest available competition measure. “Named award suppliers” are winners, not all applicants.
Not enough comparable procedures currently publish both a GBP tender value and a usable lowest-valid-bid value to calculate a responsible price-reduction benchmark. Tenderline deliberately does not infer a saving from named award suppliers or from missing award values.
No planning milestones published.
No linked framework, prior procurement or reprocurement published.
Diagnostic view. “Not published” means this current release does not provide a value.
| OCID | ocds-h6vhtk-06a637 |
|---|---|
| Latest release ID | 052854-2026 |
| Latest release timestamp | Thu Jun 04 2026 13:17:41 GMT+0000 (Coordinated Universal Time) |
| Source | find-a-tender |
| Official notice URL | Not published |
| Tender status | planned |
| Procurement method | open |
| Procurement method details | Open procedure |
| Main procurement category | works |
| Above threshold | Yes |
| Legal basis | 2023/54 |
| Tender period: start | Not published |
| Tender period: end | 2026-07-03T14:00:00+01:00 |
| Expression of interest deadline | Not published |
| Enquiry deadline | 2026-06-26T16:00:00+01:00 |
| Award period: start | Not published |
| Award period: end | 2026-10-19T23:59:59+01:00 |
| Submission method details | Tenders must only be submitted via the Delta eSourcing tender box for this procurement. Bidders MUST NOT send tender documents via email, the Delta Message Centre, by post or by hand as the submission WILL be rejected. |
| Submission languages | en |
| Electronic catalogue policy | Not published |
| Total tender value | £11,000,000 |
| Tender lots in source | 1 |
| Tender items in source | 1 |
| Tender documents in source | 0 |
| Awards in latest release | 0 |
| Contracts in latest release | 0 |
| Parties in latest release | 1 |
| Date | Event | Reference |
|---|---|---|
| 4 Jun 2026 | planning | 052854-2026 |
| 27 May 2026 | planning | 049661-2026 |
Unmodified official OCDS data retained by Tenderline for this procurement process.
{
"id": "052854-2026",
"tag": [
"planning"
],
"date": "2026-06-04T14:17:41+01:00",
"ocid": "ocds-h6vhtk-06a637",
"buyer": {
"id": "GB-PPON-PVWR-6662-QTQX",
"name": "Arc Property Services Partnership Limited"
},
"tender": {
"id": "AP25177",
"lots": [
{
"id": "1",
"value": {
"amount": 11000000,
"currency": "GBP",
"amountGross": 13200000
},
"status": "planned",
"renewal": {
"description": "The start date for the Framework is designated to be 2 years prior to the end date. This Framework shall commence on the start date and shall terminate on the end date (i.e. the 2nd (second) anniversary) or earlier, in accordance with the provisions of clause 90 in the FC. \nThe Client may extend the FC by a period of up to two years from the 2nd (second) and up to one year from 4th (fourth) anniversary of the start date. Any extension will be considered upon the following criteria being met:\n i) Demonstration by the Supplier of the successful operation of the Framework since the start date.\n ii) The Client wishes to extend the Framework.\n III) The Supplier wishes to extend the Framework.\nIf criteria i) and ii) have been met, a notice will be sent to the Supplier by the Client a minimum of 6 months prior to the end of the Framework to ask them if they wish to extend."
},
"hasRenewal": true,
"suitability": {
"sme": true
},
"awardCriteria": {
"criteria": [
{
"name": "Pricing from the commercial model",
"type": "price",
"numbers": [
{
"number": 30,
"weight": "percentageExact"
}
]
},
{
"name": "Quality based on written responses",
"type": "quality",
"numbers": [
{
"number": 70,
"weight": "percentageExact"
}
]
}
]
},
"contractPeriod": {
"endDate": "2028-10-31T23:59:59+00:00",
"startDate": "2026-11-01T00:00:00+00:00",
"maxExtentDate": "2031-10-31T23:59:59+00:00"
},
"selectionCriteria": {
"criteria": [
{
"type": "economic",
"description": "The following selection criteria are expected to form part of the tender:\n- A minimum annual turnover of £500,000\n- The following minimum insurance levels:\n - Employer’s Liability Insurance: £10,000,000\n - Public Liability Insurance: £10,000,000\n - Professional Indemnity Insurance: £2,000,000\n- Enhanced DBS checks for all site-based staff\n- Commitment to pay the Real Living Wage, as defined by the Living Wage Foundation\n- Commitment to achieve Signatory status under the Carbon Reduction Code for the Built Environment (https://www.crcbe.org) within the first 12 months of the Framework"
},
{
"type": "technical",
"description": "- Engineers holding Gas Safe registration\n- REFCOM registration (or equivalent)\n- Engineers holding recognised F-Gas certification (or equivalent)\n- Engineers registered with OFTEC (or equivalent)\n- Employment of, or access to, a Competent Person Scheme (CPS)-registered individual authorised to self-certify unvented hot water installations in accordance with Building Regulations\n- Confirmation that the Bidder’s site supervisors hold SSSTS (or equivalent)"
}
]
}
}
],
"items": [
{
"id": "1",
"relatedLot": "1",
"deliveryAddresses": [
{
"region": "UKF",
"country": "GB",
"countryName": "United Kingdom"
}
],
"additionalClassifications": [
{
"id": "45350000",
"scheme": "CPV",
"description": "Mechanical installations"
},
{
"id": "51100000",
"scheme": "CPV",
"description": "Installation services of electrical and mechanical equipment"
},
{
"id": "71000000",
"scheme": "CPV",
"description": "Architectural, construction, engineering and inspection services"
},
{
"id": "71500000",
"scheme": "CPV",
"description": "Construction-related services"
},
{
"id": "71600000",
"scheme": "CPV",
"description": "Technical testing, analysis and consultancy services"
},
{
"id": "71800000",
"scheme": "CPV",
"description": "Consulting services for water-supply and waste consultancy"
}
]
}
],
"title": "AP25177 - Mechanical Engineering Framework",
"value": {
"amount": 11000000,
"currency": "GBP",
"amountGross": 13200000
},
"status": "planned",
"coveredBy": [
"GPA",
"CPTPP"
],
"legalBasis": {
"id": "2023/54",
"uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents",
"scheme": "UKPGA"
},
"techniques": {
"frameworkAgreement": {
"type": "closed",
"method": "withoutReopeningCompetition",
"description": "As this is a single-supplier framework, pricing will be established at Stage 2 of the procurement process through the Framework Commercial Model. This will define the applicable pricing mechanisms, which may include schedules of rates, agreed overhead and profit percentages and compensation event discounts in line with NEC contract principals. This will form the basis for pricing all call-off contracts.\nThe Supplier is required to operate an open-book approach to all works under this Framework, providing full transparency of costings and supporting records to demonstrate compliance with the agreed pricing mechanisms. The Client shall have the right to review and audit such information to ensure value for money and alignment with efficiency objectives. Full details of these requirements are set out in the Framework Conditions.\nIndividual call-off contracts will be awarded via Requests for Quotation (RFQs). For each RFQ, the Supplier will submit a priced proposal in accordance with the Framework Commercial Model. As a single-supplier framework, awards will be made on the basis of the submitted quotation meeting the requirements of the RFQ and demonstrating value for money, assessed against criteria which may include price and, where appropriate, quality and delivery considerations.",
"maximumParticipants": 1
},
"hasFrameworkAgreement": true
},
"awardPeriod": {
"endDate": "2026-10-19T23:59:59+01:00"
},
"description": "Arc Property Services Partnership Limited (the “Client”) intends to procure a single-supplier framework agreement for the provision of a comprehensive range of mechanical engineering works acrossthe operational estate that it manages on behalf of Nottinghamshire County Council (NCC).\nThe Framework will provide access to a suitably qualified and experienced Contractor capable of delivering planned works on an as-required basis. The services will support the Client’s construction, maintenance, and asset management activities across multiple sites. The scope of services to be delivered under the Framework includes, but is not limited to:\n- Plumbing and water systems: installation, maintenance and repair of hot and cold-water services, drainage systems, sanitaryware, thermostatic mixing valves (TMVs), unvented systems, and water hygiene activities.\n- Heating and mechanical plant: servicing, maintenance and installation of heating systems (including gas, oil, electric and renewable technologies), distribution systems, pressurisation units, and associated plant.\n- Fuel, gas and energy infrastructure: installation and maintenance of fuel storage systems, gas installations, associated safety systems, detection equipment, and energy infrastructure.\n- Controls and building management systems (BMS/BEMS): provision, maintenance and modification of controls, sensors, panels, valves and automation systems used to monitor and manage mechanical services.\n- Installation, alteration and minor works: new installations, replacement works, adaptations to existing pipework systems, removal of redundant systems (including dead legs), strip-out works, and associated making-good of building fabric.\n- Testing, commissioning and compliance: full testing, commissioning and certification of systems, including statutory compliance, earthing and bonding where applicable, and handover documentation.\nThe Framework will operate under the NEC4 Framework Contract and will enable the Client to commission individual call-off contracts for specific projects or service requirements. Call-off contracts will be arranged via quotation utilising the prices set within the Framework Commercial model.\nThe Framework will cover a geographically dispersed estate, with works located across Nottinghamshire (main area), Derbyshire, South Yorkshire, and Leicestershire.\nThe anticipated initial term of the Framework is two (2) years, with options to extend for a further two (2) years plus one (1) year (2+2+1), giving a maximum potential duration of five (5) years. The 5 years framework is to be utilised to coincide with the current end of Arc Partnership's arrangement with Nottinghamshire County Council.\nThe total value of the Framework over its full term is £13,200,000 (inclusive of VAT), however there is no guarantee as to the value or volume of work provided.\nThe procurement will be conducted in accordance with the Procurement Act 2023 using a competitive flexible procedure, comprising a two-stage process:\n- Stage 1 - Selection Criteria - The Bidder must meet or exceed the selection criteria based on the required qualifications and experience to confirm that they have the correct capacity, competency and capability to meet the framework requirements. Bidders who receive PASS marks from the selection criteria will then have their selection criteria questions evaluated and the 4 highest scoring bidders will move to stage 2.\n- Stage 2 - Award Criteria - The remaining Bidders will be asked a series of quality questions and shall provide prices within a commercial model. These will be assessed against a set criteria based on a 70% quality / 30% price evaluation weighting. The highest scoring Bidder will be deemed to have provided the Most Advantageous Tender (MAT) and will be awarded the Framework.\nThe successful supplier will be expected to work collaboratively with the Client, contribute to social value outcomes, support carbon reduction objectives and demonstrate high standards of health and safety, compliance, and service delivery across all commissioned works.",
"riskDetails": "As the Client's main customer is Nottinghamshire County Council, there is a risk of increase or decrease in the number of sites managed and the types of proerties serviced, due to the proposal of local goverment reorganisation.",
"tenderPeriod": {
"endDate": "2026-07-03T14:00:00+01:00"
},
"communication": {
"futureNoticeDate": "2026-06-08T23:59:59+01:00"
},
"contractTerms": {
"financialTerms": "All information on payments will be contained within the Framework Conditions."
},
"enquiryPeriod": {
"endDate": "2026-06-26T16:00:00+01:00"
},
"aboveThreshold": true,
"submissionTerms": {
"languages": [
"en"
],
"electronicSubmissionPolicy": "allowed"
},
"participationFees": [
{
"id": "ocds-h6vhtk-06a637",
"type": [
"win"
],
"description": "The framework will be established by Arc Partnership for use by Arc Partnership. As such no fees for access will be charged to the successful supplier."
}
],
"procurementMethod": "open",
"mainProcurementCategory": "works",
"submissionMethodDetails": "Tenders must only be submitted via the Delta eSourcing tender box for this procurement. Bidders MUST NOT send tender documents via email, the Delta Message Centre, by post or by hand as the submission WILL be rejected.",
"procurementMethodDetails": "Open procedure"
},
"parties": [
{
"id": "GB-PPON-PVWR-6662-QTQX",
"name": "Arc Property Services Partnership Limited",
"roles": [
"buyer"
],
"address": {
"region": "UKF14",
"country": "GB",
"locality": "Nottingham",
"postalCode": "NG1 6BT",
"countryName": "United Kingdom",
"streetAddress": "2nd Floor, East West Building, 1 Tollhouse Hill"
},
"details": {
"classifications": [
{
"id": "publicUndertaking",
"scheme": "UK_CA_TYPE",
"description": "Public undertaking"
}
]
},
"identifier": {
"id": "PVWR-6662-QTQX",
"scheme": "GB-PPON"
},
"contactPoint": {
"name": "Robert Hunter",
"email": "procurement@arc-partnership.co.uk",
"telephone": "+44 8006696565"
}
}
],
"language": "en",
"planning": {
"documents": [
{
"id": "052854-2026",
"url": "https://www.find-tender.service.gov.uk/Notice/052854-2026",
"format": "text/html",
"noticeType": "UK3",
"description": "Planned procurement notice on Find a Tender",
"documentType": "plannedProcurementNotice",
"datePublished": "2026-06-04T14:17:41+01:00"
}
]
},
"initiationType": "tender"
}{
"id": "052854-2026",
"tag": [
"planning"
],
"date": "2026-06-04T14:17:41+01:00",
"ocid": "ocds-h6vhtk-06a637",
"buyer": {
"id": "GB-PPON-PVWR-6662-QTQX",
"name": "Arc Property Services Partnership Limited"
},
"tender": {
"id": "AP25177",
"lots": [
{
"id": "1",
"value": {
"amount": 11000000,
"currency": "GBP",
"amountGross": 13200000
},
"status": "planned",
"renewal": {
"description": "The start date for the Framework is designated to be 2 years prior to the end date. This Framework shall commence on the start date and shall terminate on the end date (i.e. the 2nd (second) anniversary) or earlier, in accordance with the provisions of clause 90 in the FC. \nThe Client may extend the FC by a period of up to two years from the 2nd (second) and up to one year from 4th (fourth) anniversary of the start date. Any extension will be considered upon the following criteria being met:\n i) Demonstration by the Supplier of the successful operation of the Framework since the start date.\n ii) The Client wishes to extend the Framework.\n III) The Supplier wishes to extend the Framework.\nIf criteria i) and ii) have been met, a notice will be sent to the Supplier by the Client a minimum of 6 months prior to the end of the Framework to ask them if they wish to extend."
},
"hasRenewal": true,
"suitability": {
"sme": true
},
"awardCriteria": {
"criteria": [
{
"name": "Pricing from the commercial model",
"type": "price",
"numbers": [
{
"number": 30,
"weight": "percentageExact"
}
]
},
{
"name": "Quality based on written responses",
"type": "quality",
"numbers": [
{
"number": 70,
"weight": "percentageExact"
}
]
}
]
},
"contractPeriod": {
"endDate": "2028-10-31T23:59:59+00:00",
"startDate": "2026-11-01T00:00:00+00:00",
"maxExtentDate": "2031-10-31T23:59:59+00:00"
},
"selectionCriteria": {
"criteria": [
{
"type": "economic",
"description": "The following selection criteria are expected to form part of the tender:\n- A minimum annual turnover of £500,000\n- The following minimum insurance levels:\n - Employer’s Liability Insurance: £10,000,000\n - Public Liability Insurance: £10,000,000\n - Professional Indemnity Insurance: £2,000,000\n- Enhanced DBS checks for all site-based staff\n- Commitment to pay the Real Living Wage, as defined by the Living Wage Foundation\n- Commitment to achieve Signatory status under the Carbon Reduction Code for the Built Environment (https://www.crcbe.org) within the first 12 months of the Framework"
},
{
"type": "technical",
"description": "- Engineers holding Gas Safe registration\n- REFCOM registration (or equivalent)\n- Engineers holding recognised F-Gas certification (or equivalent)\n- Engineers registered with OFTEC (or equivalent)\n- Employment of, or access to, a Competent Person Scheme (CPS)-registered individual authorised to self-certify unvented hot water installations in accordance with Building Regulations\n- Confirmation that the Bidder’s site supervisors hold SSSTS (or equivalent)"
}
]
}
}
],
"items": [
{
"id": "1",
"relatedLot": "1",
"deliveryAddresses": [
{
"region": "UKF",
"country": "GB",
"countryName": "United Kingdom"
}
],
"additionalClassifications": [
{
"id": "45350000",
"scheme": "CPV",
"description": "Mechanical installations"
},
{
"id": "51100000",
"scheme": "CPV",
"description": "Installation services of electrical and mechanical equipment"
},
{
"id": "71000000",
"scheme": "CPV",
"description": "Architectural, construction, engineering and inspection services"
},
{
"id": "71500000",
"scheme": "CPV",
"description": "Construction-related services"
},
{
"id": "71600000",
"scheme": "CPV",
"description": "Technical testing, analysis and consultancy services"
},
{
"id": "71800000",
"scheme": "CPV",
"description": "Consulting services for water-supply and waste consultancy"
}
]
}
],
"title": "AP25177 - Mechanical Engineering Framework",
"value": {
"amount": 11000000,
"currency": "GBP",
"amountGross": 13200000
},
"status": "planned",
"coveredBy": [
"GPA",
"CPTPP"
],
"legalBasis": {
"id": "2023/54",
"uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents",
"scheme": "UKPGA"
},
"techniques": {
"frameworkAgreement": {
"type": "closed",
"method": "withoutReopeningCompetition",
"description": "As this is a single-supplier framework, pricing will be established at Stage 2 of the procurement process through the Framework Commercial Model. This will define the applicable pricing mechanisms, which may include schedules of rates, agreed overhead and profit percentages and compensation event discounts in line with NEC contract principals. This will form the basis for pricing all call-off contracts.\nThe Supplier is required to operate an open-book approach to all works under this Framework, providing full transparency of costings and supporting records to demonstrate compliance with the agreed pricing mechanisms. The Client shall have the right to review and audit such information to ensure value for money and alignment with efficiency objectives. Full details of these requirements are set out in the Framework Conditions.\nIndividual call-off contracts will be awarded via Requests for Quotation (RFQs). For each RFQ, the Supplier will submit a priced proposal in accordance with the Framework Commercial Model. As a single-supplier framework, awards will be made on the basis of the submitted quotation meeting the requirements of the RFQ and demonstrating value for money, assessed against criteria which may include price and, where appropriate, quality and delivery considerations.",
"maximumParticipants": 1
},
"hasFrameworkAgreement": true
},
"awardPeriod": {
"endDate": "2026-10-19T23:59:59+01:00"
},
"description": "Arc Property Services Partnership Limited (the “Client”) intends to procure a single-supplier framework agreement for the provision of a comprehensive range of mechanical engineering works acrossthe operational estate that it manages on behalf of Nottinghamshire County Council (NCC).\nThe Framework will provide access to a suitably qualified and experienced Contractor capable of delivering planned works on an as-required basis. The services will support the Client’s construction, maintenance, and asset management activities across multiple sites. The scope of services to be delivered under the Framework includes, but is not limited to:\n- Plumbing and water systems: installation, maintenance and repair of hot and cold-water services, drainage systems, sanitaryware, thermostatic mixing valves (TMVs), unvented systems, and water hygiene activities.\n- Heating and mechanical plant: servicing, maintenance and installation of heating systems (including gas, oil, electric and renewable technologies), distribution systems, pressurisation units, and associated plant.\n- Fuel, gas and energy infrastructure: installation and maintenance of fuel storage systems, gas installations, associated safety systems, detection equipment, and energy infrastructure.\n- Controls and building management systems (BMS/BEMS): provision, maintenance and modification of controls, sensors, panels, valves and automation systems used to monitor and manage mechanical services.\n- Installation, alteration and minor works: new installations, replacement works, adaptations to existing pipework systems, removal of redundant systems (including dead legs), strip-out works, and associated making-good of building fabric.\n- Testing, commissioning and compliance: full testing, commissioning and certification of systems, including statutory compliance, earthing and bonding where applicable, and handover documentation.\nThe Framework will operate under the NEC4 Framework Contract and will enable the Client to commission individual call-off contracts for specific projects or service requirements. Call-off contracts will be arranged via quotation utilising the prices set within the Framework Commercial model.\nThe Framework will cover a geographically dispersed estate, with works located across Nottinghamshire (main area), Derbyshire, South Yorkshire, and Leicestershire.\nThe anticipated initial term of the Framework is two (2) years, with options to extend for a further two (2) years plus one (1) year (2+2+1), giving a maximum potential duration of five (5) years. The 5 years framework is to be utilised to coincide with the current end of Arc Partnership's arrangement with Nottinghamshire County Council.\nThe total value of the Framework over its full term is £13,200,000 (inclusive of VAT), however there is no guarantee as to the value or volume of work provided.\nThe procurement will be conducted in accordance with the Procurement Act 2023 using a competitive flexible procedure, comprising a two-stage process:\n- Stage 1 - Selection Criteria - The Bidder must meet or exceed the selection criteria based on the required qualifications and experience to confirm that they have the correct capacity, competency and capability to meet the framework requirements. Bidders who receive PASS marks from the selection criteria will then have their selection criteria questions evaluated and the 4 highest scoring bidders will move to stage 2.\n- Stage 2 - Award Criteria - The remaining Bidders will be asked a series of quality questions and shall provide prices within a commercial model. These will be assessed against a set criteria based on a 70% quality / 30% price evaluation weighting. The highest scoring Bidder will be deemed to have provided the Most Advantageous Tender (MAT) and will be awarded the Framework.\nThe successful supplier will be expected to work collaboratively with the Client, contribute to social value outcomes, support carbon reduction objectives and demonstrate high standards of health and safety, compliance, and service delivery across all commissioned works.",
"riskDetails": "As the Client's main customer is Nottinghamshire County Council, there is a risk of increase or decrease in the number of sites managed and the types of proerties serviced, due to the proposal of local goverment reorganisation.",
"tenderPeriod": {
"endDate": "2026-07-03T14:00:00+01:00"
},
"communication": {
"futureNoticeDate": "2026-06-08T23:59:59+01:00"
},
"contractTerms": {
"financialTerms": "All information on payments will be contained within the Framework Conditions."
},
"enquiryPeriod": {
"endDate": "2026-06-26T16:00:00+01:00"
},
"aboveThreshold": true,
"submissionTerms": {
"languages": [
"en"
],
"electronicSubmissionPolicy": "allowed"
},
"participationFees": [
{
"id": "ocds-h6vhtk-06a637",
"type": [
"win"
],
"description": "The framework will be established by Arc Partnership for use by Arc Partnership. As such no fees for access will be charged to the successful supplier."
}
],
"procurementMethod": "open",
"mainProcurementCategory": "works",
"submissionMethodDetails": "Tenders must only be submitted via the Delta eSourcing tender box for this procurement. Bidders MUST NOT send tender documents via email, the Delta Message Centre, by post or by hand as the submission WILL be rejected.",
"procurementMethodDetails": "Open procedure"
},
"parties": [
{
"id": "GB-PPON-PVWR-6662-QTQX",
"name": "Arc Property Services Partnership Limited",
"roles": [
"buyer"
],
"address": {
"region": "UKF14",
"country": "GB",
"locality": "Nottingham",
"postalCode": "NG1 6BT",
"countryName": "United Kingdom",
"streetAddress": "2nd Floor, East West Building, 1 Tollhouse Hill"
},
"details": {
"classifications": [
{
"id": "publicUndertaking",
"scheme": "UK_CA_TYPE",
"description": "Public undertaking"
}
]
},
"identifier": {
"id": "PVWR-6662-QTQX",
"scheme": "GB-PPON"
},
"contactPoint": {
"name": "Robert Hunter",
"email": "procurement@arc-partnership.co.uk",
"telephone": "+44 8006696565"
}
}
],
"language": "en",
"planning": {
"documents": [
{
"id": "052854-2026",
"url": "https://www.find-tender.service.gov.uk/Notice/052854-2026",
"format": "text/html",
"noticeType": "UK3",
"description": "Planned procurement notice on Find a Tender",
"documentType": "plannedProcurementNotice",
"datePublished": "2026-06-04T14:17:41+01:00"
}
]
},
"initiationType": "tender"
}{
"id": "049661-2026",
"tag": [
"planning"
],
"date": "2026-05-27T13:23:46+01:00",
"ocid": "ocds-h6vhtk-06a637",
"buyer": {
"id": "GB-PPON-PVWR-6662-QTQX",
"name": "Arc Property Services Partnership Limited"
},
"tender": {
"id": "AP25177",
"lots": [
{
"id": "1",
"status": "planning",
"hasRenewal": true,
"contractPeriod": {
"endDate": "2028-10-31T23:59:59+00:00",
"startDate": "2026-11-01T00:00:00+00:00",
"maxExtentDate": "2031-10-31T23:59:59+00:00"
}
}
],
"items": [
{
"id": "1",
"relatedLot": "1",
"deliveryAddresses": [
{
"region": "UKF",
"country": "GB",
"countryName": "United Kingdom"
}
],
"additionalClassifications": [
{
"id": "45350000",
"scheme": "CPV",
"description": "Mechanical installations"
},
{
"id": "51100000",
"scheme": "CPV",
"description": "Installation services of electrical and mechanical equipment"
},
{
"id": "71000000",
"scheme": "CPV",
"description": "Architectural, construction, engineering and inspection services"
},
{
"id": "71500000",
"scheme": "CPV",
"description": "Construction-related services"
},
{
"id": "71600000",
"scheme": "CPV",
"description": "Technical testing, analysis and consultancy services"
},
{
"id": "71800000",
"scheme": "CPV",
"description": "Consulting services for water-supply and waste consultancy"
}
]
}
],
"title": "AP25177 - Mechanical Engineering Framework",
"value": {
"amount": 11000000,
"currency": "GBP",
"amountGross": 13200000
},
"status": "planning",
"legalBasis": {
"id": "2023/54",
"uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents",
"scheme": "UKPGA"
},
"techniques": {
"hasFrameworkAgreement": true
},
"description": "Arc Property Services Partnership Limited (the “Client”) intends to procure a single-supplier framework agreement for the provision of a comprehensive range of mechanical engineering works acrossthe operational estate that it manages on behalf of Nottinghamshire County Council (NCC).\nThe Framework will provide access to a suitably qualified and experienced Contractor capable of delivering planned works on an as-required basis. The services will support the Client’s construction, maintenance, and asset management activities across multiple sites. The scope of services to be delivered under the Framework includes, but is not limited to:\n- Plumbing and water systems: installation, maintenance and repair of hot and cold-water services, drainage systems, sanitaryware, thermostatic mixing valves (TMVs), unvented systems, and water hygiene activities.\n- Heating and mechanical plant: servicing, maintenance and installation of heating systems (including gas, oil, electric and renewable technologies), distribution systems, pressurisation units, and associated plant.\n- Fuel, gas and energy infrastructure: installation and maintenance of fuel storage systems, gas installations, associated safety systems, detection equipment, and energy infrastructure.\n- Controls and building management systems (BMS/BEMS): provision, maintenance and modification of controls, sensors, panels, valves and automation systems used to monitor and manage mechanical services.\n- Installation, alteration and minor works: new installations, replacement works, adaptations to existing pipework systems, removal of redundant systems (including dead legs), strip-out works, and associated making-good of building fabric.\n- Testing, commissioning and compliance: full testing, commissioning and certification of systems, including statutory compliance, earthing and bonding where applicable, and handover documentation.\nThe Framework will operate under the NEC4 Framework Contract and will enable the Client to commission individual call-off contracts for specific projects or service requirements. Call-off contracts will be arranged via quotation utilising the prices set within the Framework Commercial model.\nThe Framework will cover a geographically dispersed estate, with works located across Nottinghamshire (main area), Derbyshire, South Yorkshire, and Leicestershire.\nThe anticipated initial term of the Framework is two (2) years, with options to extend for a further two (2) years plus one (1) year (2+2+1), giving a maximum potential duration of five (5) years.\nThe total value of the Framework over its full term is £13,200,000 (inclusive of VAT), however there is no guarantee as to the value or volume of work provided.\nThe procurement will be conducted in accordance with the Procurement Act 2023 using a competitive flexible procedure, comprising a two-stage process:\n- Stage 1 - Selection Criteria - The Bidder must meet or exceed the selection criteria based on the required qualifications and experience to confirm that they have the correct capacity, competency and capability to meet the framework requirements. Bidders who receive PASS marks from the selection criteria will then have their selection criteria questions evaluated and the 4 highest scoring bidders will move to stage 2.\n- Stage 2 - Award Criteria - The remaining Bidders will be asked a series of quality questions and shall provide prices within a commercial model. These will be assessed against a set criteria based on a 70% quality / 30% price evaluation weighting. The highest scoring Bidder will be deemed to have provided the Most Advantageous Tender (MAT) and will be awarded the Framework.\nThe successful supplier will be expected to work collaboratively with the Client, contribute to social value outcomes, support carbon reduction objectives and demonstrate high standards of health and safety, compliance, and service delivery across all commissioned works.",
"communication": {
"futureNoticeDate": "2026-06-14T23:59:59+01:00"
},
"aboveThreshold": true,
"mainProcurementCategory": "works"
},
"parties": [
{
"id": "GB-PPON-PVWR-6662-QTQX",
"name": "Arc Property Services Partnership Limited",
"roles": [
"buyer"
],
"address": {
"region": "UKF14",
"country": "GB",
"locality": "Nottingham",
"postalCode": "NG1 6BT",
"countryName": "United Kingdom",
"streetAddress": "2nd Floor, East West Building, 1 Tollhouse Hill"
},
"details": {
"classifications": [
{
"id": "publicUndertaking",
"scheme": "UK_CA_TYPE",
"description": "Public undertaking"
}
]
},
"identifier": {
"id": "PVWR-6662-QTQX",
"scheme": "GB-PPON"
},
"contactPoint": {
"name": "Robert Hunter",
"email": "procurement@arc-partnership.co.uk",
"telephone": "+44 8006696565"
}
}
],
"language": "en",
"planning": {
"documents": [
{
"id": "049661-2026",
"url": "https://www.find-tender.service.gov.uk/Notice/049661-2026",
"format": "text/html",
"noticeType": "UK2",
"description": "Preliminary market engagement notice on Find a Tender",
"documentType": "marketEngagementNotice",
"datePublished": "2026-05-27T13:23:46+01:00"
}
],
"milestones": [
{
"id": "engagement",
"type": "engagement",
"status": "scheduled",
"dueDate": "2026-06-04T23:59:59+01:00",
"description": "If your organisation is interested in bidding for this upcoming tender, please ensure in the first instance that you are registered (free of charge) on Arc Partnership’s procurement platform, Delta eSourcing:\nhttps://www.delta-esourcing.com\nIt is recommended that you register using a generic email address that can be monitored during staff absences, to ensure that important tender information and updates are not missed.\nOnce registered, please email Procurement@arc-partnership.co.uk, confirming the email address associated with your Delta eSourcing account. An automatic invitation will then be issued once the procurement is live.\nBidders (and, where applicable, their immediate supply chain) must also be registered as a supplier on the Central Digital Platform:\nhttps://www.find-tender.service.gov.uk\nThe following selection criteria are expected to form part of the tender:\n- A minimum annual turnover of £500,000\n- The following minimum insurance levels:\n - Employer’s Liability Insurance: £10,000,000\n - Public Liability Insurance: £10,000,000\n - Professional Indemnity Insurance: £2,000,000\n- Enhanced DBS checks for all site-based staff\n- Commitment to pay the Real Living Wage, as defined by the Living Wage Foundation\n- Commitment to achieve Signatory status under the Carbon Reduction Code for the Built Environment (https://www.crcbe.org) within the first 12 months of the Framework\n- Engineer holding Gas Safe registration\n- REFCOM registration (or equivalent)\n- Engineers holding recognised F-Gas certification (or equivalent)\n- Engineers registered with OFTEC (or equivalent)\n - Employment of, or access to, a Competent Person Scheme (CPS)-registered individual authorised to self-certify unvented hot water installations in accordance with Building Regulations\nPlease note that this information is provided for guidance only, and Arc Partnership reserves the right to amend these requirements prior to publication of the Contract Notice.\nBidders will be given the opportunity to demonstrate “self-cleaning” measures during the procurement process where applicable."
}
]
},
"initiationType": "tender"
}