Find a TenderOpen for tender
Published 10 Nov 2026, 16:09 GMT

Official UK procurement notice

EDC/2026/4497 Framework Agreement for Drainage Civil Engineering Works

Authority: East Dunbartonshire Council (Local council)

Framework agreementWorksOpen procedure
Framework ceiling (notional)£3,600,000framework ceiling, not attributable revenue
Submission deadline 11 Dec 202612:00 GMT · 30 days left
Notice summaryFrom the published notice

East Dunbartonshire Council wishes to establish a public contract (within the meaning of the Procurement Regulations) and appoint a number of suppliers under an overarching ranked framework arrangement to carry out work and provide Work Orders in relation to Drainage Civil Engineering Works throughout the local government area of East Dunbartonshire over a minimum period of three (3) years with an option to extend up to a further 12 months. The proposed conditions of contract are the clauses of the NEC4 Framework Contract June 2017 (with amendments January 2023), as set out in Appendix 1 of the procurement documents.

What is being bought

Published requirement description

East Dunbartonshire Council wishes to establish a public contract (within the meaning of the Procurement Regulations) and appoint a number of suppliers under an overarching ranked framework arrangement to carry out work and provide Work Orders in relation to Drainage Civil Engineering Works throughout the local government area of East Dunbartonshire over a minimum period of three (3) years with an option to extend up to a further 12 months.

  • Recurrence: It is assumed the framework will be retendered in October 2030.

CPV: Drainage and surface works · Drainage construction works · Drainage works · Drains construction work · Foul-water piping construction work · Ground-drainage work

How this framework works

From the published notice
Places
up to 4 suppliers

The lotProcurement structure

single lot · no lot value published
Lot #1The proposed conditions of contract are the clauses of the NEC4 Framework Contract…Renewal

The proposed conditions of contract are the clauses of the NEC4 Framework Contract June 2017 (with amendments January 2023), as set out in Appendix 1 of the procurement documents.

As set out in Appendix 2 of the procurement documents, an Engineering & Construction Contract (ECC) work order will be issued under the Framework Contract to the 1st ranked supplier for drainage civil engineering works. If the Supplier fails to comply with one or more requirements of the quotation procedure, EDC reserves the right to select and consider the next ranked Supplier appointed under the Framework Contract for the proposed Work Order.

The work within the framework scope is as detailed in the procurement documents and may include, without limitation:

  • Replace and install gullies
  • Excavating and repairing surface water lines
  • Installation of access manholes
  • Offer alternative excavation methods/ options such as trenchless technology ( pipe bursting, directional Moling / drilling and vacuum excavation.
  • Replacement of subsided roads, where water/drainage has caused damage
  • Works in and around watercourses; upgrading outfalls, installing or repairing gabion baskets
  • Retrofitting SUDS
  • SUD repairs
  • Feasibility and design for drainage systems
  • Submission of as-built drawings and information for asset management
  • Offer deep excavation / shoring apparatus
  • Supply traffic management for works Additional information: Economic operators may be excluded from this competition if they are in any of the situations referred to in regulation 8 and 9 of the Procurement (Scotland) Regulations 2016.
Delivery: Scotland
Extensions: The Framework Contract will endure for an initial term of three (3) years with an option to extend it (either singularly or in phases) for a further period of up to one (1) year after the expiry of the initial term, at the sole discretion of the Client.Variant bids: not allowed

Who is likely to bid for this lot ↓

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids are scored
Quality: 56%Price: 32%Environmental: 12%
Published sub-criteria (7)
  • Management of the Framework Contract: 20%
  • Providing Work Orders: 28%
  • Fair Work First: 4%
  • Community Benefits: 4%
  • Understanding of NEC4 ECC Option E (Cost Reimbursable Contract): 12%
  • price: 20%
  • Health, Safety & Environment: 12%
Published award criteria (7)
  • Management of the Framework Contract: 20
  • Providing Work Orders: 28
  • Understanding of NEC4 ECC Option E (Cost Reimbursable Contract): 12
  • Health, Safety & Environment: 12
  • Fair Work First: 4
  • Community Benefits: 4
  • Price: 20
Conditions of participation3
  • Suitability

    The bidder is enrolled in the relevant professional or trade registers kept in its country of establishment

  • Economic & financial standing

    The bidder should provide its (general) yearly turnover for the number of financial years specified:

    Minimum: Number of financial years & minimum required turnover per year - Bidders will be required to have an general yearly turnover of 1,800,000 GBP over the past 3 years. It is a requirement of this contract that bidders hold, or can commit to obtain prior to the commencement of any s…
  • Technical & professional ability

    For public works contracts only, please provide relevant examples of works carried out in the past five years as specified:

    Minimum: Bidders will be required to provide examples of works carried out in the past five years that demonstrate that they have the relevant experience to deliver the work as described in part II.2.4 of this Contract Notice. Please provide case studies/examples of your participation in …
What this means for your bid
  • Price carries 32 of 100 points: a 10% discount moves about 3.2 points. The method statement decides this lot, not the discount.
  • “EDC/2026/4497 Framework Agreement for Drainage Civil Engineering Works” is a framework: the contest is a place on its panel, up to 4 suppliers, not a single contract.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Competition analysis · published record, not a forecast of who will bid

How East Dunbartonshire Council buys Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork (CPV 4523), and who usually turns up

East Dunbartonshire Council has little published record in this market. Compared with other frameworks and DPS only. Whole-market view: Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork (CPV 4523) →

1

How the contest usually goes

Winner shares use published awards; bid and price charts use contested lots.

How often do SMEs win?
i

How often small and medium firms win.

Share of awards where the winner’s size is known.

The counts under this question show how many awards have a known supplier size.

Last 36 months.

Buyer: no supplier sizes published · market: CPV 4523 · Scotland, n=10
—40%

No supplier sizes published for this authority.

How often do local suppliers win?
i

How often local firms win similar work.

Winners with a registered address in the delivery region, out of awards with a known address.

Local means the winner is registered in the region where that award was delivered.

A local branch does not count if the registered address is elsewhere.

Last 36 months.

Buyer: no winner locations published · market: CPV 4523 · UK-wide, n=150
—70%

No winner locations published for this authority. Local means a registered address in the region where that award was delivered.

How long to a decision?
i

How long buyers here take to decide after bids close.

Middle value in days from the bid deadline to the award date, on competitions that published both.

Only decided tenders count, so slow ones still waiting are not in.

Last 36 months.

Buyer: no decision dates published · market: CPV 4523 · UK-wide, n=39
—77 days

Half of these awards have an award date within 77 days of the bid deadline.

How often single-bid or direct?
i

How often work is awarded with no recorded rival.

Direct awards and tenders where every published lot count shows one bid.

The market share is a minimum: some awards have no bid count.

Thin markets produce this too; it is not proof of a tailored specification.

Last 36 months.

Buyer: no awards on record · market: CPV 4523 · UK-wide, n=47
—11%

No awards recorded for this authority in this market.

How many bids did past lots attract?

i

How many bids past lots received.

Each colour is a bid-count range. Only competed lots with a published count are included.

Past bids do not predict this tender.

Last 36 months.

This buyerToo few to chart: 3 lots with bid counts, 5 needed · all categories
The market38 lots with bid counts · CPV 4523 · Scotland
5% had one bid
Market · select a colour for counts
1 bid5%
Market: 2 of 38 lots with published bid counts.
2–329%
Market: 11 of 38 lots with published bid counts.
4–626%
Market: 10 of 38 lots with published bid counts.
7+39%
Market: 15 of 38 lots with published bid counts.

How did awards compare with estimates?

i

Where winning prices landed against estimates.

Awards below, close to or above the estimate, per lot. The buyer side adds below-threshold contracts with a pre-award estimate; an award inside a published range counts as close.

On a framework or DPS, prices are agreed when work is called off.

Past prices are a guide, not a bid price.

Last 36 months.

Not comparable on a framework or DPS: the price is set later, on each call-off.

2

Assess each lot
i

What past awards tell you about each lot.

See the forecast, this buyer’s earlier suppliers and firms with relevant wins.

No supplier is confirmed as a bidder.

Open a lot for its forecast, this buyer’s previous supplier and possible competitors, from published award history, not a bid list

Lot #1The proposed conditions of contract are the clauses of the NEC4 Framework Contract…CPV 452335 monthsPublished estimate£3.6m
Expected competition
i

How many bids this lot may attract.

The forecast uses similar past competitions. The bar shows either that forecast or past bid counts; the line below says which.

Each lot shows its own forecast based on its own category; forecasts for different lots of the same notice are not comparative.

A forecast, not a list of bidders.

5expected bids2% chance of a single bid
similar past contests in this category: 23
Forecast chances for this lot
1 bid2%
Chance this lot gets 1 bid: 2%. This is a forecast.
2–319%
Chance this lot gets 2–3: 19%. This is a forecast.
4–620%
Chance this lot gets 4–6: 20%. This is a forecast.
7+59%
Chance this lot gets 7+: 59%. This is a forecast.
Commercial price forecast
i

Where the award price may land.

The forecast uses similar awards and the buyer’s estimate. The band covers the middle half of likely prices.

No comparable awards for this lot yet.

A statistical guide from past awards, not a price to bid.

—Priced at call-off
On a framework or DPS the price is agreed on each call-off, so there is no award price to forecast here: the published figure is a ceiling.

Who has supplied this buyer on similar work?
i

Who has done similar work for this buyer.

Past contracts are matched by buyer, title and type of work.

A past supplier may not bid again.

No earlier contract of this buyer matches this lot on the published record.

Who could compete for this lot?
i

Who could compete for this lot?

Firms with relevant past wins. On a framework, we show firms on that agreement.

None is confirmed as a bidder.

SupplierWon in this categoryLive contractsAward vs estimate
3 panel places
£97m14 awards in 36m · last 2 months ago7 live · £42m
i

Public contracts this supplier still holds.

Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book.

Unexpired says nothing about spare capacity.

6% above n=12
2 panel places
£31m6 awards in 36m · last 3 months ago2 live · £28m
i

Public contracts this supplier still holds.

Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book.

Unexpired says nothing about spare capacity.

10% below n=1
5 panel places
£3.7m8 awards in 36m · last 1 month ago1 live · £88k
i

Public contracts this supplier still holds.

Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book.

Unexpired says nothing about spare capacity.

36% below n=2
9 panel places
£4.9m13 awards in 36m · last 2 months ago2 live · £4.3m
i

Public contracts this supplier still holds.

Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book.

Unexpired says nothing about spare capacity.

no comparable pairs
4 panel places
£83k7 awards in 36m · last 4 months ago1 live · £2.2m
i

Public contracts this supplier still holds.

Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book.

Unexpired says nothing about spare capacity.

no comparable pairs
About this data
  • Source. Official UK public procurement notices (Find a Tender and Contracts Finder), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly. Contracts Finder appears in live search, the Retender Radar, contract pages, organisation counts, the earlier contracts and past suppliers on a tender's competition panel, the buyer's decision figure and its award against estimate; the other analytical figures are built from Find a Tender notices.
  • Two views, kept apart. The authority’s own track record and the wider market for the same kind of work sit side by side and are never mixed. Where the local picture is too thin, a figure widens to a broader market and says which one it used.
  • Forecasts are labelled. The price forecast and its range, possible competitors and the earlier-work matches are our estimates from past awards: not published facts, not win chances and not price advice. Official notices do not say who is bidding.
  • Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.

Procedure terms & legal framework

From the official record · publisher note attached
Procedure method
Open procedure
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Works
Notice status
Open for tender
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
Yes · It is assumed the framework will be retendered in October 2030.
First published
10 Nov 2026, 16:09 GMT
Last source update
10 Nov 2026, 16:09 GMT
Award evaluation window
11 Dec 2026 – …
Authority reference
EDC/2026/4497
FTS notice number
2026/S 000-106832
Classification (CPV)
Drainage and surface worksDrainage construction worksDrainage worksDrains construction workFoul-water piping construction workGround-drainage work
Delivery area
Scotland (UKM81)
Official registry OCID
ocds-h6vhtk-07b8eb Find a Tender
Contract terms
Electronic trading
e-invoicing allowed · electronic ordering · electronic payment
Performance terms

The framework is let under the NEC4 Framework Contract June 2017 (with amendments January 2023) with Call off contracts will be let under:

NEC4 Engineering and Construction Contract, June 2017 (amended January 2023),

Publisher note: NOTE: To register your interest in this notice and obtain any additional information please visit the Public Contracts Scotland Web Site at https://www.publiccontractsscotland.gov.uk/Search/Search_Switch.aspx?ID=847790. The buyer has indicated that it will accept electronic responses to this notice via the Postbox facility. A user guide is available at https://www.publiccontractsscotland.gov.uk/sitehelp/help_guides.aspx. Suppliers are advised to allow adequate time for uploading documents and to dispatch the electronic response well in advance of the closing time to avoid any last minute problems. A sub-contract clause has been included in this contract. For more information see: http://www.publiccontractsscotland.gov.uk/info/InfoCentre.aspx?ID=2363 Community benefits are included in this requirement. For more information see: https://www.gov.scot/policies/public-sector-procurement/community-benefits-in-procurement/ A summary of the expected community benefits has been provided as follows: The Authority is committed to maximising Community Benefits (within the meaning of the Procurement Reform (Scotland) Act 2014) from its procurement activities to build economic, social or environmental conditions into the delivery of council contracts. The Winning Tenderer and its supply chain is required to support the Authority’s objectives for delivering a range of economic, social or environmental benefits completing Quality Question 5 in the Invitation to Tender and submitting the response as part of the tender deliverables. (SC Ref:847790) Download the ESPD document here: https://www.publiccontractsscotland.gov.uk/ESPD/ESPD_Download.aspx?id=847790

How to participate & submission route

Official notice Submit via Public Contracts Scotland
Submission portal named on this notice: Public Contracts Scotland · Who buys & how to bid on PCS
Supplier login requiredLanguage: EN
Access & registration note: Free single registration for Scotland; PCS-Tender (Jaggaer) for full bidding
Requests to participate (first stage)
—
Appointment period ends
11 Dec 2026, 12:00 GMT
Clarification deadline
—
Submission channel
{"electronicSubmission"}
Accepted languages
en
Bid validity
120 days from the deadline
Bids opened
11 Dec 2026, 12:00 GMT
Detailed submission instructions & authority contactsFrom official release

Timeline

10 Nov 2026 → 11 Dec 2026 · 3 dates
  1. Notice publishedjust passed
    10 Nov 2026, 16:09 GMT
  2. Today
    10 Nov 2026
  3. Admission / appointment period endsin 30 days · period end, not a bid countdown
    11 Dec 2026, 12:00 GMT
  4. Bids openedin 30 days
    11 Dec 2026, 12:00 GMT

Commercial outcome & contract awards

Nothing awarded yet
Awards (0)
No award published
Contracts (0)
No contract published
Bid statistics
No aggregate bid statistics published

Contracting authority & participating public bodies

East Dunbartonshire Council

Contracting authorityLocal CouncilRegional or local authorityGeneral public services Civic & Corporate Headquarters, Southbank Marina,12 Strathkelvin Place, Kirkintilloch, Scotland, G66 1TJContact name, email, phone Published organisation website ↗

Dispute resolution & review bodies

  • Glasgow Sheriff CourtReview body Glasgow

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice; the tender pack is on the portal.