66/132kV Cable Installation Framework

Official notice

Authority: NATIONAL GRID UK LIMITED (Public body)

Open framework schemeWorksCompetitive flexible procedureAbove thresholdUtilities
Framework ceiling (notional)£80,000,000framework ceiling, not attributable revenue
Submissions closed 30 Apr 2026awarded 25 Jun 2026
Awarded to Balfour Beatty Utility Solutions Limited +7 more8 awards
Framework period 1 yrends 28 May 2027 · up to 28 May 2028 with extensions · starts 29 May 2026

What is being bought

Published requirement description

The contracting entity for this framework is National Grid UK Limited, but will be available for use by any of the Group subsidiary companies within the National Grid UK Limited Group. This includes, but is not limited to National Grid Electricity Transmission, National Grid Ventures, National Grid Electricity Distribution East Midlands, National Grid Electricity Distribution West Midlands, National Grid Electricity Distribution South West and National Grid Electricity Distribution South Wales.

The successful framework contractors will be required to carry out the full installation of 66kV, 132kV and/or lower voltage cable circuits and associated earth wires / continuity conductors and NGED Telecom ducts inclusive of all jointing, testing and commissioning as specified for the individual route/project being tendered for.

  • How the procedure runs: 1. Declare interest to Participate 2. Receipt of Tender Documentation (via Ariba) 3. Return of Tender Documentation (via Ariba) 4. Evaluation of initial submissions 5. Negotiation (if required) 6. Tender Award (following Standstill period)

CPV: Installation of cable laying

How this framework works

From the published notice
Type
Closed framework · open framework scheme (admission reopens)
Call-offs
call-offs may be awarded directly or by further competition
Framework period
1 yr · up to 2 yrs from 29 May 2026
Scheme runs until
29 May 2028
Published description of the framework

Full installation of 66kV, 132kV and/or lower voltage cable circuits and associated earth wires/continuity conductors and NGED Telecom ducts inclusive of all jointing, testing and commissioning as specified for the individual route/project being tendered for.   All works will be in accordance with NGED policies and procedures.

All bonding systems shall comply with Electricity Network Association (ENA) Engineering Recommendation C.55/4.

All ducts used shall be as specified in  NGED Policy and Procedures.

Testing & commissioning of the cable circuits shall be as specified in  NGED Policy and Procedures.

The successful Contractor may be required to carry out design works as part of an installation contract, or as a separate instruction as required. This may be in the form of 'Cable System Design' or 'Cable Route Design'. Details of design requirements shall be specified for the individual route/project being tendered for.

Design work should take into consideration the best method of Ducting/Cable install work via Open Cut or Cable Ploughing methods dependant on Project-by-Project requirement.

The cable type, route length and any constraints / limitations will be specified for the individual route being tendered for.

The cable specification will be issued on a job-by-job basis

The route details shall be as specified for the individual route being tendered for. A detailed route survey may or may not be supplied at the invitation to tender stage.

Along the cable route there could be various 'Special Engineering Difficulties' (SED's) as specified on the individual route being tendered for. The tenderer is to allow for crossing all the SED's along the cable route with proposed methodology, including the install via HDD and designs for any shallow installs proposed to overcome SED's.

Allowance shall be made in programme for 3rd party agreement of crossing respective SEDs  shall be as specified, unless alternatively specified by the cable manufacturer or on a project by project basis.

The successful contractor may be required to carry out decommissioning works. This shall be specified for the individual route/project being tendered for.   All decommissioning works shall be as specified in  NGED Policy and Procedures  (NGED ST: CA9)

The contractor may be required to install telecommunication ducts and chambers. This shall be as specified in  NGED Policy and Procedures.

The successful contractor will be fully responsible for liaising and co-ordinating with the relevant Highway Authority and the NGED "Streetworks" team with regards to all opening notice applications, traffic management requirements, parking restrictions, road closures, permit schemes etc. Opening notices and permit applications will be submitted by the contractor via the NGED "Streetworks" team.

The contractor will be responsible for the full resolution of all NRSWA defects, Section 74 fines and any other NRSWA issues associated with their works.

The successful contractor shall be responsible for liaison & consultation with all key stakeholders, including but not limited to the local Highway Authorities, private landowners, local residents (including neighbourhood groups), local schools, local businesses, bus companies, etc throughout the project. This may involve out of hours meetings/presentations and publicity publications.

The successful contractor shall also be responsible for notifying the above in writing giving sufficient notice of the works commencement with relevant out of hours contact details.

The Contractor should include a programme of the proposed works as part of his tender submission for each individual project. This should clearly break out key activities and milestones for the project and be submitted in a PDF and Microsoft Project format.

For confirmation the Client will require a contract programme to be developed and submitted by the successful Contractor following the Contract Award for each individual project for the acceptance of NGEDs nominated person. The programme will need to be updated and maintained on a monthly basis and shall indicate the critical path and the impact of all agreed variations to the programme. The programme is to be provided in PDF and Microsoft Project format.

The Contractor should include a payment profile against a proposed Programme of Works. The successful Contractor should submit Applications for Payments against the profile in a timely manner.

National Grid Electricity Distribution will either supply free issue materials for projects, or require the contractors to provide as part of their tender offer - the decision to be at NGED's discretion. Any free issue materials will be clearly specified under the heading 'Free Issue Materials' on a project by project basis.   All other materials necessary for the full installation, jointing, testing commissioning, decommissioning or completion of the project scope of works, not identified under the heading 'Free Issue Materials' are to be allowed for and supplied by the contractor.

All free issue materials will be delivered to the successful contractors secure store/site.

The contractor will be required to co-ordinate the delivery of the free issue materials with the supplier as part of the requirements of the works. The contractor must therefore confirm with the supplier as soon as possible, the required section lengths, quantities etc.

Any materials not supplied by NGED must be in compliance with the requirements of the New Roads and Street Works Act 1991 and specification for the Reinstatement of Openings in Highways (HAUC) 1992.

The contractor shall be responsible for inspecting all NGED 'free issue materials' for quality and suitability in adequate time for rectification.

Storage and site office: The contractor will need to propose and secure a suitable site/s from which to carry out the works.

The Contractor should indicate the hours and days of the week they expect their staff to carry out the works in his response to each individual invitation to tender. This resource plan should include but not be limited to gangs and management staff and indicate the percentage of each week that they will be working on each individual project. This plan should align with the programme submitted in the tender for that project and be updated in line with the monthly programme.

The successful contractor shall allow provision for a secure location to store the all materials. Suitable and appropriate security shall be allowed for by the contractor to ensure the security of all materials whilst stored at this location and at remote work sites during the installation of all materials/cable and accessories. Suitable and appropriate security shall also be provided by the contractor to ensure the security of NGED's network while it is at risk from open excavations or reduced security as a result of the works. Until the time it is energised it will be the responsibility of the successful contactor and security provisions and insurance should be allowed for.

For all 66kV, 132kV and lower voltages cable routes, copper pilots and NGED Telecom duct route installations, the Contractor will produce a set of CAD as-built records, plus 2 sets of paper copies, based on the relevant Ordnance Survey maps, and 1 set of electronic copies, of the aforementioned records, in pdf format, of 'As Built' line diagrams drawn to ENATS 09-02 standard. These drawings will be ready for hand- over to NGED no more than 4 weeks after the cable has been laid.

The cable route records shall be developed as the duct laying proceeds. Interim submissions to the NGED records team, shall be made to allow the NGED records team to be preparing the route as the duct laying proceeds to reduce the work load at the end.

The rates are deemed to include for complying with the requirements of the New Roads and Street Works Act 1991 and the latest edition of the Code of Practice 'The Specification for the Reinstatement of Openings in Highways'. (The Specification).

The rates are also deemed to include for complying with the 'Traffic Management Act 2004' and all associated secondary legislation and codes of practice.

Road types are as defined by the Highway Authority. The road types encountered will be specified on the individual road summary sheet(s) provided on a project-by-project basis.

Recording the works will be, as laid down in the latest edition of National Grid Electricity Distribution, 'Basic Recording Techniques and Procedures'.

The Contractor is to provide an 'all-in rate' for the complete works.

Road types are defined above.

All Excavation, Cable Laying and Reinstatement Works shall be in accordance with Standard Technique CA6A.

The definitions of footways and verges are as those set out in HAUC specifications.

The rates shall include for all costs in connection with protecting the works.

The rates shall include for all costs in connection with bringing to, maintaining on and removing from site all plant necessary for the permanent and temporary work.

(Full details of the scope can be viewed once Expression of Interest to Participate is confirmed).

The lotProcurement structure

single lot · value published
Lot #1AwardedRenewal 1 yrPublished value£80,000,000
Contract period: 29 May 2026 – 28 May 2027 (1 yr) · up to 28 May 2028 with extensionsValue: £80,000,000 exc. VAT · £96,000,000 inc. VAT
Delivery: London
Extensions: Extension up to 12 months.

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored
Quality: 70%Price: 30%
Published sub-criteria (2)
  • Technical: 70%
  • Commercial: 30%
Published award criteria (2)
  • Commercial
  • Technical
What this means for your bid
  • Price carries 30 of 100 points: a 10% discount moves about 3 points. The method statement decides this lot, not the discount.
  • “66/132kV Cable Installation Framework” is a framework: the contest is a place on its panel, not a single contract: call-offs may be direct or by further competition.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Competitive flexible procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Works
Notice status
Awarded
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Utilities
Commercial structure
Open framework scheme
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
30 Mar 2026, 16:14 BST
Last source update
29 Jun 2026, 16:28 BST
Award evaluation window
Submission end – 29 May 2026
Authority reference
WS5607093027
FTS notice number
2026/S 000-029272
Latest notice
Contract award notice (UK6)
Classification (CPV)
Installation of cable laying
Delivery area
East Midlands (UKF)West Midlands (UKG)South West (UKK)Wales (UKL)
Official registry OCID
ocds-h6vhtk-067831 Find a Tender
How it runs
  1. Declare interest to Participate
  2. Receipt of Tender Documentation (via Ariba)
  3. Return of Tender Documentation (via Ariba)
  4. Evaluation of initial submissions
  5. Negotiation (if required)
  6. Tender Award (following Standstill period)

How it was run

Official notice
Requests to participate (first stage)
30 Apr 2026, 17:00 BST
Appointment period ends
30 Apr 2026, 17:00 BST
Clarification deadline
30 Apr 2026, 17:00 BST
Electronic submission
Not allowed
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

To be submitted via National Grid's Ariba eSourcing platform. Full details of how to participate will be shared once National Grid receive requests to participate.

Timeline

30 Mar 2026 → 29 Jun 2026 · 7 dates
  1. Tender notice published205 days ago
    30 Mar 2026, 16:14 BST
  2. Clarification questions by174 days ago
    30 Apr 2026, 17:00 BST
  3. Admission / appointment period ends174 days ago · period end, not a bid countdown
    30 Apr 2026, 17:00 BST
  4. Contract starts146 days ago
    29 May 2026, 00:00 BST
  5. Award decision expected by145 days ago
    29 May 2026, 23:59 BST
  6. Assessment summaries sent115 days ago
    29 Jun 2026, 00:00 BST
  7. Latest notice published114 days ago
    29 Jun 2026, 16:28 BST

Notice history

5 events · 3 releases on Find a Tender · since 30 Mar 2026
  1. Tender notice published
    30 Mar 2026, 16:14 BST
    UK4
  2. Tender notice published
    31 Mar 2026, 17:27 BST
    UK4
  3. Contract award notice published
    29 Jun 2026, 16:28 BST
    UK6
  4. Status changed to complete
    29 Jun 2026, 16:28 BST
  5. Contract signature expected
    13 Jul 2026, 23:59 BST
    scheduled
Published amendments (1)

Clarification of Tendering Entities and Subsidiary companies within he National Grid UK Limited Group.

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast

£80,000,000 is the framework's published maximum, restated by the publisher on 8 award rows. It is one ceiling, not 8 separate sums, and no share per lot is published; those rows read “ceiling above”.

Awarded toValueDateStatus
Balfour Beatty Utility Solutions Limited66/13kV Cable Installation Framework13 Jul 2026 – 12 Jul 2027 · up to 12 Jul 2028Extensions: Possible 12 month extension.ceiling above25 Jun 2026Awarded
OCU Services Limited66/132V Cable Installation Framework13 Jul 2026 – 12 Jul 2027 · up to 12 Jul 2028Extensions: Possible 12 month extensionceiling above25 Jun 2026Awarded
Excalon Limited13 Jul 2026 – 12 Jul 2027 · up to 12 Jul 2028Extensions: Possible 12 month extensionceiling above25 Jun 2026Awarded
A THOMAS PLANT HIRE LIMITED13 Jul 2026 – 12 Jul 2027 · up to 12 Jul 2028Extensions: Possible 12 month extensionceiling above25 Jun 2026Awarded
United Infrastructure Power T&D Limited13 Jul 2026 – 12 Jul 2027 · up to 12 Jul 2028Extensions: Possible 12 month extensionceiling above25 Jun 2026Awarded
KN Network Services Ltd13 Jul 2026 – 12 Jul 2027 · up to 12 Jul 2028Extensions: Possible 12 month extensionceiling above25 Jun 2026Awarded
M & A DOOCEY CIVILENGINEERING LIMITED13 Jul 2026 – 12 Jul 2027 · up to 12 Jul 2028Extensions: Possible 12 month extensionceiling above25 Jun 2026Awarded
Network Plus Services Limited13 Jul 2026 – 12 Jul 2027 · up to 12 Jul 2028Extensions: Possible 12 month extensionceiling above25 Jun 2026Awarded

Contracting authority & participating public bodies

NATIONAL GRID UK LIMITED

Contracting authorityPrivate utility GB-COH: 04508773 · GB-PPON: PGTR-4481-CJPQ 1-3 Strand, London, London, WC2N 5EHContact name, email, phone

Framework contractors & participating bidders

8 commercial parties on the notice
  • A THOMAS PLANT HIRE LIMITEDFramework contractorGB-COH: 06550558GB-PPON: PLZM-7979-TWGN A Thomas Plant Hire, Glanafon, Dolgran, Camarthen, Wales, SA39 9BXContact email
  • BALFOUR BEATTY UTILITY SOLUTIONS LIMITEDFramework contractorGB-COH: 01062438GB-PPON: PRTV-3222-RCTQ 5 Churchill Place, London, London, E14 5HUContact email
  • CIRCET (UK) LIMITEDFramework contractorGB-COH: 04645331GB-PPON: PJDD-5587-PYPZ 217 Bath Road, Slough, South East, SL1 4AAContact email
  • EXCALON LIMITEDFramework contractorGB-COH: 04450846GB-PPON: PNNG-6153-ZPCJ 3125 Thorpe Park, Leeds, Yorkshire & Humber, LS15 8ZBContact email
  • M & A DOOCEY CIVIL ENGINEERING LIMITEDFramework contractorGB-COH: 02426466GB-PPON: PXBP-7982-DWXG The Old Stables, Off Watery Lane, Tipton, West Midlands, DY4 8NAContact email
  • NETWORK PLUS SERVICES LTDFramework contractorGB-COH: 04057938GB-PPON: PTRT-7516-BWGR Network Plus Services Ltd Chaddock Lane, Manchester, North West, M28 1XWContact email
  • OCU SERVICES LIMITEDFramework contractorGB-COH: 03421543 Artemis House, Stockport, North West, SK3 8ABContact email
  • UNITED INFRASTRUCTURE POWER T&D LIMITEDFramework contractorGB-COH: 11829648GB-PPON: PMXG-3653-PMLT Building 4 Clearwater, Warrington, North West, WA5 3UZContact email

Official documents & specifications (11)

Official links; attachments are not copied

Tender pack and attachments

  • Bidding documents and specificationstenderBidding documents and specificationsAccess: The Tender Pack will be provided on our e‑tendering platform (Ariba)

Notices published for this procedure

  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
Show 2 more notices
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender