planned
Official procurement procedure

22/016 - Design, Construction, Procurement, Installation, pre-commissioning and commissioning to enable Decarbonisation of the South West Scotland Onshore System (SWSOS) Compressor Stations.

Electric motors
Gas compressors
Gas network equipment
+4 more
Published value
Not published
Submission deadline 31 Aug 2022, 12:00 BST
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: GNI (UK) Limited: "22/016 - Design, Construction, Procurement, Installation, pre-commissioning and commissioning to enable Decarbonisation of the South West Scotland Onshore System (SWSOS) Compressor Stations.". Published status: planned. Published value: Value not published. 1 published lot. Recorded submission deadline: 31 Aug 2022, 12:00 BST. See the official notice for participation instructions.
Contracting AuthorityGNI (UK) LimitedScope & CategoriesNot publishedSubmission Window
Closed
31 Aug 2022, 12:00 BST
Submission GatewayDirect notice routeLegal Basis & RegimeStandard procurementEstimated Value (exc. VAT)Not published
Bidder Intelligence · Authority Profile: GNI (UK) Limited
Market Analytics
View Authority Profile →
Derived from OCDS awards & bid statistics
Published history for GNI (UK) Limited. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Requires at least 5 comparable procedures
Competition Density
1Bids / Report
100% of reports have one bid
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate available
Payment Terms
Check noticePublished terms
Payment obligations depend on the applicable regime and contract. Consult the official documents.
Coverage: 8 active published awards; 7 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityGNI (UK) Limited
Procedure methodNot published
Procurement categoryNot published
Statusplanned
Framework / DPSNot published
CompetitionNot published
Above thresholdNot published
Legal basisNot published
Tender period startsNot published
Clarification deadlineNot published
Electronic submissionNot published
Submission languagesNot published
Published2 Aug 2022, 14:25 BST
Last source update2 Aug 2022, 14:25 BST
Recurring procurementNot published
ClassificationElectric motors, Gas compressors, Gas network equipment, Gas turbines, Installation services of gas turbines, Professional services for the gas industry, Services related to the oil and gas industry
Delivery area
OCIDocds-h6vhtk-035840
What is being bought
Gas Networks Ireland plans to reduce corporate carbon emissions to 50% of their carbon emissions level in 2010. Decarbonisation of the SWSOS Compressor Stations aims to assist with this decarbonisation target. The scope of this requirement is for the Delivery of the Design, Construction, Procurement, Installation and commissioning of Electric Drive Motor (EMD) Gas Compressors and ancillary equipment with associated lifecycle maintenance, located at GNI(UK) Compressor Stations at Beattock and Brighouse Bay (Kirkcudbright), in southwest Scotland. The scope includes but is not limited to: • Site surveys required to inform requirements for material procurement. • Preliminary and Detailed Design, Construction, procurement, Installation, pre-commissioning and commissioning incl. FAT and SAT, supply of O&M manual, technical and material record documentation, asset information data sheets. • Engagement with Electrical power provider regarding Electrical infrastructure requirements. • Siting and Construction of Compressors Hall(s) • Sizing Optimal Electric Drive Motor(s) (EMD), Compressor(s) and ancillaries based on Capacity Assessments. o Electric driver; o Core compressor o Compatibility with future Hydrogen blends. o Lube oil system for core compressor, lube oil system and main driver; (if applicable) o Seal gas system; (if applicable) o Frequency converter input transformer; o Frequency converter system; o Water cooling system for Variable Speed Drive (VSD) system; and • Integration of the unit control system(s) into the existing station control system (including the Fire and Gas system(s)). • Integration of all piping and instrumentation required for proper unit operation • Maintenance services which include but not limited to for this requirement are as follows; o Preventative/Scheduled Maintenance Services (including management service) - inspections, inspection kits, provision of service personnel and repairs. o Corrective Maintenance Services - provision of service personnel and repairs. o Spares/parts. • Staff training for operation and maintenance purposes.
What changed
From the official release history
  1. Status changed to planned
    2 Aug 2022, 14:25 BST
  2. Official notice release published
    2 Aug 2022, 14:25 BST
  3. Submission deadline changed to 31 Aug 2022, 12:00 BST
    2 Aug 2022, 14:25 BST
  4. Buyer information updated
    2 Aug 2022, 14:25 BST
Lots and requirements (1)
Published by the contracting authority
  • Lot 1 · #1
    Individual lot title not published
    planned
    Published valueNot published
    Gas Networks Ireland plans to reduce corporate carbon emissions to 50% of their carbon emissions level in 2010. Decarbonisation of the SWSOS Compressor Stations aims to assist with this decarbonisation target. The scope of this requirement is for the Delivery of the Design, Construction, Procurement, Installation and commissioning of Electric Drive Motor (EMD) Gas Compressors and ancillary equipment with associated lifecycle maintenance, located at GNI(UK) Compressor Stations at Beattock and Brighouse Bay (Kirkcudbright), in southwest Scotland. The scope includes but is not limited to: • Site surveys required to inform requirements for material procurement. • Preliminary and Detailed Design, Construction, procurement, Installation, pre-commissioning and commissioning incl. FAT and SAT, supply of O&M manual, technical and material record documentation, asset information data sheets. • Engagement with Electrical power provider regarding Electrical infrastructure requirements. • Siting and Construction of Compressors Hall(s) • Sizing Optimal Electric Drive Motor(s) (EMD), Compressor(s) and ancillaries based on Capacity Assessments. o Electric driver; o Core compressor o Compatibility with future Hydrogen blends. o Lube oil system for core compressor, lube oil system and main driver; (if applicable) o Seal gas system; (if applicable) o Frequency converter input transformer; o Frequency converter system; o Water cooling system for Variable Speed Drive (VSD) system; and • Integration of the unit control system(s) into the existing station control system (including the Fire and Gas system(s)). • Integration of all piping and instrumentation required for proper unit operation • Maintenance services which include but not limited to for this requirement are as follows; o Preventative/Scheduled Maintenance Services (including management service) - inspections, inspection kits, provision of service personnel and repairs. o Corrective Maintenance Services - provision of service personnel and repairs. o Spares/parts. • Staff training for operation and maintenance purposes Additional information: GNI wishes to invite request for information for 22/016 - Design, Construction, Procurement, Installation, pre-commissioning and commissioning to enable Decarbonisation of the South West Scotland Onshore System (SWSOS) Compressor Stations. Completed RFI's should be returned via the etenders messaging facility with the tender reference & the tender title in the subject line of the message not later than 12.00hrs (local time) on Wed 31st August 2022. www.etenders.gov.ie/system-user-guides
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
Timeline
  1. Procedure published
    2 Aug 2022, 14:25 BST
  2. Submission deadline
    31 Aug 2022, 12:00 BST
Commercial outcome and competition
AwardsNo award published
ContractsNo contract published
Bid statisticsNo aggregate bid statistics published
Buyer and organisations in this procedure

GNI (UK) Limited

Contracting authority GB-FTS-22241
View buyer profile
Documents (0)
Official links; attachments are not copied
No data
No linked documents are published
Related procedures (0)
No data
No related procedures published