Find a Tender
planned
Official procurement procedure
22/016 - Design, Construction, Procurement, Installation, pre-commissioning and commissioning to enable Decarbonisation of the South West Scotland Onshore System (SWSOS) Compressor Stations.
Electric motors
Gas compressors
Gas network equipment
+4 more
Published value
Not published
Submission deadline 31 Aug 2022, 12:00 BST
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: GNI (UK) Limited: "22/016 - Design, Construction, Procurement, Installation, pre-commissioning and commissioning to enable Decarbonisation of the South West Scotland Onshore System (SWSOS) Compressor Stations.". Published status: planned. Published value: Value not published. 1 published lot. Recorded submission deadline: 31 Aug 2022, 12:00 BST. See the official notice for participation instructions.
| Contracting Authority | GNI (UK) Limited | Scope & Categories | Not published | Submission Window | Closed 31 Aug 2022, 12:00 BST |
|---|---|---|---|---|---|
| Submission Gateway | Direct notice route | Legal Basis & Regime | Standard procurement | Estimated Value (exc. VAT) | Not published |
Bidder Intelligence · Authority Profile: GNI (UK) Limited
Market Analytics
Derived from OCDS awards & bid statistics
Published history for GNI (UK) Limited. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Competition Density
1Bids / Report
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate availablePayment Terms
Check noticePublished terms
Coverage: 8 active published awards; 7 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityGNI (UK) Limited | Procedure methodNot published | Procurement categoryNot published |
Statusplanned | Framework / DPSNot published | CompetitionNot published |
Above thresholdNot published | Legal basisNot published | Tender period startsNot published |
Clarification deadlineNot published | Electronic submissionNot published | Submission languagesNot published |
Published2 Aug 2022, 14:25 BST | Last source update2 Aug 2022, 14:25 BST | Recurring procurementNot published |
ClassificationElectric motors, Gas compressors, Gas network equipment, Gas turbines, Installation services of gas turbines, Professional services for the gas industry, Services related to the oil and gas industry | ||
Delivery area | ||
OCIDocds-h6vhtk-035840 | ||
What is being bought
Gas Networks Ireland plans to reduce corporate carbon emissions to 50% of their carbon emissions level in 2010. Decarbonisation of the SWSOS Compressor Stations aims to assist with this decarbonisation target.
The scope of this requirement is for the Delivery of the Design, Construction, Procurement, Installation and commissioning of Electric Drive Motor (EMD) Gas Compressors and ancillary equipment with associated lifecycle maintenance, located at GNI(UK) Compressor Stations at Beattock and Brighouse Bay (Kirkcudbright), in southwest Scotland. The scope includes but is not limited to:
• Site surveys required to inform requirements for material procurement.
• Preliminary and Detailed Design, Construction, procurement, Installation, pre-commissioning and commissioning incl. FAT and SAT, supply of O&M manual, technical and material record documentation, asset information data sheets.
• Engagement with Electrical power provider regarding Electrical infrastructure requirements.
• Siting and Construction of Compressors Hall(s)
• Sizing Optimal Electric Drive Motor(s) (EMD), Compressor(s) and ancillaries based on Capacity Assessments.
o Electric driver;
o Core compressor
o Compatibility with future Hydrogen blends.
o Lube oil system for core compressor, lube oil system and main driver; (if applicable)
o Seal gas system; (if applicable)
o Frequency converter input transformer;
o Frequency converter system;
o Water cooling system for Variable Speed Drive (VSD) system; and
• Integration of the unit control system(s) into the existing station control system (including the Fire and Gas system(s)).
• Integration of all piping and instrumentation required for proper unit operation
• Maintenance services which include but not limited to for this requirement are as follows;
o Preventative/Scheduled Maintenance Services (including management service) - inspections, inspection kits, provision of service personnel and repairs.
o Corrective Maintenance Services - provision of service personnel and repairs.
o Spares/parts.
• Staff training for operation and maintenance purposes.
What changed
From the official release history
- Status changed to planned
2 Aug 2022, 14:25 BST - Official notice release published
2 Aug 2022, 14:25 BST - Submission deadline changed to 31 Aug 2022, 12:00 BST
2 Aug 2022, 14:25 BST - Buyer information updated
2 Aug 2022, 14:25 BST
Lots and requirements (1)
Published by the contracting authority
- Lot 1 · #1Individual lot title not publishedplannedPublished valueNot publishedGas Networks Ireland plans to reduce corporate carbon emissions to 50% of their carbon emissions level in 2010. Decarbonisation of the SWSOS Compressor Stations aims to assist with this decarbonisation target. The scope of this requirement is for the Delivery of the Design, Construction, Procurement, Installation and commissioning of Electric Drive Motor (EMD) Gas Compressors and ancillary equipment with associated lifecycle maintenance, located at GNI(UK) Compressor Stations at Beattock and Brighouse Bay (Kirkcudbright), in southwest Scotland. The scope includes but is not limited to: • Site surveys required to inform requirements for material procurement. • Preliminary and Detailed Design, Construction, procurement, Installation, pre-commissioning and commissioning incl. FAT and SAT, supply of O&M manual, technical and material record documentation, asset information data sheets. • Engagement with Electrical power provider regarding Electrical infrastructure requirements. • Siting and Construction of Compressors Hall(s) • Sizing Optimal Electric Drive Motor(s) (EMD), Compressor(s) and ancillaries based on Capacity Assessments. o Electric driver; o Core compressor o Compatibility with future Hydrogen blends. o Lube oil system for core compressor, lube oil system and main driver; (if applicable) o Seal gas system; (if applicable) o Frequency converter input transformer; o Frequency converter system; o Water cooling system for Variable Speed Drive (VSD) system; and • Integration of the unit control system(s) into the existing station control system (including the Fire and Gas system(s)). • Integration of all piping and instrumentation required for proper unit operation • Maintenance services which include but not limited to for this requirement are as follows; o Preventative/Scheduled Maintenance Services (including management service) - inspections, inspection kits, provision of service personnel and repairs. o Corrective Maintenance Services - provision of service personnel and repairs. o Spares/parts. • Staff training for operation and maintenance purposes Additional information: GNI wishes to invite request for information for 22/016 - Design, Construction, Procurement, Installation, pre-commissioning and commissioning to enable Decarbonisation of the South West Scotland Onshore System (SWSOS) Compressor Stations. Completed RFI's should be returned via the etenders messaging facility with the tender reference & the tender title in the subject line of the message not later than 12.00hrs (local time) on Wed 31st August 2022. www.etenders.gov.ie/system-user-guidesContract periodNot publishedEligibilityNot publishedOptions / renewalNot published
Timeline
- Procedure published
2 Aug 2022, 14:25 BST - Submission deadline
31 Aug 2022, 12:00 BST
Commercial outcome and competition
AwardsNo award published |
ContractsNo contract published |
Bid statisticsNo aggregate bid statistics published |
Buyer and organisations in this procedure
GNI (UK) Limited
Contracting authority GB-FTS-22241Documents (0)
Official links; attachments are not copied
No linked documents are published
Related procedures (0)
No related procedures published