Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 7,921–7,930

23,940 contracts

  1. Estimated end · in 129 days

    SWTRA Road Electrical and Technology Maintenance Contract 2024

    Neath Port Talbot County Borough Council · Local authority · Wales (Cymru)

    Incumbent: Centregreat Ltd · Last contest: 2 bids (1 SME) · awarded 17% over the estimate

    See II.2.4) Description of the Procurement

    • Repair, maintenance and associated services related to roads and other equipment
    Published value
    £35m
    Annual run-rate
    —start date not published
    Term
    Estimated end 3 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-0403bf
  2. Estimated end · in 129 daysPanel · 3 suppliers

    General Lab Equipment

    CENTRE FOR PROCESS INNOVATION LIMITED · Other public body · Nationwide (UK)

    Panel: North England Laboratory Supplies, SciQuip Ltd, VWR International Ltd · Last contest: 3 bids (2 SME)

    • Laboratory, optical and precision equipments (excl. glasses)
    Published value
    £5.0m
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 3 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-039921
  3. Estimated end · in 129 daysPanel · 3 suppliers

    Analysers

    CENTRE FOR PROCESS INNOVATION LIMITED · Other public body · Nationwide (UK)

    Panel: Fisher Scientific UK, North England Laboratory Supplies, SciQuip Ltd · Last contest: 3 bids (2 SME)

    • Laboratory, optical and precision equipments (excl. glasses)
    Published value
    £5.0m
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 3 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-039921
  4. Estimated end · in 129 daysPanel · 3 suppliers

    Balances, Scales and Weights

    CENTRE FOR PROCESS INNOVATION LIMITED · Other public body · Nationwide (UK)

    Panel: Medline Scientific Limited, North England Laboratory Supplies, SciQuip Ltd · Last contest: 3 bids (3 SME)

    • Laboratory, optical and precision equipments (excl. glasses)
    Published value
    £5.0m
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 3 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-039921
  5. Estimated end · in 129 daysPanel · 3 suppliers

    Fridges, Freezers and Chillers

    CENTRE FOR PROCESS INNOVATION LIMITED · Other public body · Nationwide (UK)

    Panel: North England Laboratory Supplies, SciQuip Ltd, VWR International Ltd · Last contest: 3 bids (2 SME)

    • Laboratory, optical and precision equipments (excl. glasses)
    Published value
    £5.0m
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 3 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-039921
  6. Estimated end · in 129 daysPanel · 3 suppliers

    Laboratory/Cleanroom Furniture

    CENTRE FOR PROCESS INNOVATION LIMITED · Other public body · Nationwide (UK)

    Panel: North England Laboratory Supplies, SciQuip Ltd, Wolf Laboratories Limited · Last contest: 3 bids (3 SME)

    • Laboratory, optical and precision equipments (excl. glasses)
    Published value
    £5.0m
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 3 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-039921
  7. Estimated end · in 129 days

    ITT For the Provision of Microsoft Licensing

    ROCHDALE BOROUGHWIDE HOUSING LIMITED · Charity · North West England

    Incumbent: Phoenix Software Ltd · Last contest: 16 bids · awarded 1% over the estimate

    RBH currently has a Microsoft Enterprise Agreement in place for the provision of its licensing. RBH uses the E3 licenses with additions of the team's telephony and Microsoft Defender P2. We are looking at amalgamation of these licenses to m…

    • License management software package
    Published value
    £606k
    Annual run-rate
    —start date not published
    Term
    Estimated end 3 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-0436a2
  8. Estimated end · in 129 days

    Supply of Into-plane Fuel Systems, Storage and Maintenance for Cornwall Airport Newquay

    CORSERV LIMITED · South West England

    Incumbent: Anthony Kinns Aviation Rental (Services) Ltd · Last contest: 1 bid · awarded 24% over the estimate

    Corserv Ltd on behalf of Cornwall Airport Ltd aims to select and appoint an Into-Plane Fuel Systems, Storage and Maintenance supplier to a framework agreement.

    • Petroleum products, fuel, electricity and other sources of energy
    Published value
    £559k
    Annual run-rate
    —start date not published
    Term
    Estimated end 3 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-03a3bc
  9. Estimated end · in 129 days

    Tender for the Provision of a Planned and Reactive Maintenance Service for Lifts and Hoists

    Buckinghamshire Council · Local authority · South East England

    Incumbent: The Chiltern Lift Company · Last contest: 10 bids (9 SME) · awarded at the estimate

    Buckinghamshire Council has awarded a contract to deliver its Planned and Reactive Maintenance Service for Lifts and Hoists. The awarded contract includes the provision and management of the following elements: o Planned and preventative ma…

    • Lift-maintenance services
    Published value
    £417k
    Annual run-rate
    —start date not published
    Term
    Estimated end 3 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-0408ed
  10. Estimated end · in 129 daysFramework record

    Framework for the Provision of a Fire Engineer

    University of Northumbria at Newcastle · Education · North East England

    Incumbent: Atkins Limited

    • Fire and explosion protection and control consultancy services
    Published value
    £300kpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 3 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-040853

When contracts end
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

38,152 contracts and agreements end within 24 months, 60,676 in total · £43bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months5,762
  2. 3–6 months8,030
  3. 6–12 months10,148
  4. 12–24 months14,212

By sector, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.