Retender radar: UK public contracts ending soon
Every contract in the catalogue with a published end date in the future, one row per contract (lot). A contract ending is a procurement starting, unless the buyer uses a published extension option, which the row shows. Frameworks and DPS are marked: what ends there is the vehicle, not one supplier’s contract.
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
252 contracts end within 24 months, 424 in total · £1.5bn published GBP value, exc. VAT, in the next 12 months (framework ceilings included, not a spend forecast).
By sector, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
CPV division of the procedure; a contract with several divisions counts in each.
85Health and social work services1,17333Medical equipments, pharmaceuticals59179Business services: law, marketing, consulting48072IT services: consulting, software, internet18780Education and training services17860Transport services (except waste transport)17550Repair and maintenance services16715Food, drink, tobacco162
Contracts ending in the next 12 months
Showing 541–550
- Ends · in 229 daysFramework re-letPanel · 2 suppliers
NRW Timber signs and structures 2023-2027
Natural Resources Wales · Wales (Cymru)
Panel: Signs Workshop Limited, The Creative Core Group Ltd
- Contract value
- £750kceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 31 May 2027 · start not published
- Reference
ocds-h6vhtk-03b676
- Ends · in 229 days
Planned Preventative Maintenance and Responsive Repairs to Drainage Systems and Water/Sewage Pumps
Southend City Council · Local authority · East of England
Incumbent: CCR Property Services Ltd
- Contract value
- £698k
- Annual run-rate
- —start date not published
- Term
- Ends 31 May 2027 · start not published
- Reference
ocds-h6vhtk-042b30
- Ends · in 229 daysExtension option · up to 31 May 2031
Concrete Repairs
Wrexham County Borough Council · Local authority · Wales (Cymru)
Incumbent: SPECIALIST UK RESTORATIONS LIMITED
- Contract value
- £600k
- Annual run-rate
- £344kvalue ÷ published term
- Term
- 2 Sept 2025 → 31 May 2027 · 1.7 yrs · up to 31 May 2031 with extensions
- Reference
ocds-h6vhtk-05113c
- Ends · in 229 days
RCC-1655 DESIGN, BUILD AND INSTALLATION OF THE 'DIGGING RUTLAND GALLERY FROM STONE AGE TO ANGLO SAXON' FOR THE RUTLAND COUNTY MUSEUM
Rutland County Council · Local authority · East Midlands
Incumbent: VERTIGO CREATIVE STUDIO LIMITED
- Contract value
- £451k
- Annual run-rate
- £658kvalue ÷ published term
- Term
- 24 Sept 2026 → 31 May 2027 · 8 months
- Reference
ocds-h6vhtk-0684a2
- Ends · in 229 days
Car park resurfacing - wharf road level 4
South Kesteven District Council · Local authority · East Midlands
Incumbent: Rio Asphalt & Paving Co. Limited
- Contract value
- £300kinc. VAT as published
- Annual run-rate
- £300kvalue ÷ published term
- Term
- 1 Jun 2026 → 31 May 2027 · 11 months
- Reference
ocds-h6vhtk-066517
- Ends · in 229 days
Inspection, testing and responsive repairs to Intruder Systems
Southend City Council · Local authority · East of England
Incumbent: Blake Contractors Ltd
- Contract value
- £294k
- Annual run-rate
- —start date not published
- Term
- Ends 31 May 2027 · start not published
- Reference
ocds-h6vhtk-042b30
- Ends · in 229 daysFramework re-let
Supply and Installation of Burial Chambers
Sandwell Metropolitan Borough Council · Local authority · West Midlands
Incumbent: Gem Precast
- Contract value
- £268kceiling for the whole framework
- Annual run-rate
- —ceiling, not a run-rate
- Term
- Ends 31 May 2027 · start not published
- Reference
ocds-h6vhtk-03c448
- Ends · in 229 days
Inspection, testing and responsive repairs to Fire Suppression Systems
Southend City Council · Local authority · East of England
Incumbent: Churches Fire Security Ltd
- Contract value
- £96k
- Annual run-rate
- —start date not published
- Term
- Ends 31 May 2027 · start not published
- Reference
ocds-h6vhtk-042b30
- Ends · in 229 daysExtension option · up to 31 May 2028
Provision of PA, Staging and Lighting for ACBCBC Events within the Tourism, Arts and Culture Department
Armagh, Banbridge & Craigavon Borough Council · Local authority
Incumbent: McCusker Pro Audio ltd
- Contract value
- £80kinc. VAT as published
- Annual run-rate
- £80kvalue ÷ published term
- Term
- 1 Jun 2026 → 31 May 2027 · 11 months · up to 31 May 2028 with extensions
- Reference
ocds-h6vhtk-067621
- Ends · in 229 days
Inspection, testing and responsive repairs to firefighting equipment
Southend City Council · Local authority · East of England
Incumbent: Blake Contractors Ltd
- Contract value
- £74k
- Annual run-rate
- —start date not published
- Term
- Ends 31 May 2027 · start not published
- Reference
ocds-h6vhtk-042b30
How to read the radar
- End date is the contract period end the buyer published on the notice. Contracts without an end date are not on the radar.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend instead of retendering. Hide them to see contracts that must be re-procured.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term, only for a single supplier, a term of six months or more and a plain contract (not a framework or DPS ceiling).
- Counts are exact for the time-horizon and sector filters. With other filters, a result above 1,000 contracts shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.