Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 23,461–23,470

23,795 contracts

  1. Ends · in 352 days

    Meeting Pods

    London Borough of Waltham Forest · Local authority · Nationwide (UK)

    Incumbent: Rainbow Office Design · Last contest: awarded 16% under the estimate

    Framery Four Lite Adjustable lighting with two preset lighting modes Adaptive ventilation (airflow volume & direction) Occupancy lights 8’’ touchscreen Built-in 4G module 2x USB-C, PD charge port 65W Air filter Junction box With table and s…

    Published value
    £138k
    Annual run-rate
    £138kpublished value ÷ term, exc. VAT
    Term
    10 Oct 2026 → 10 Oct 2027 · 1 yr
    Reference
    ocds-h6vhtk-06f750
  2. Ends · in 352 days

    Consultancy Support for the Housing Growth Delivery Partner Procurement

    Hull City Council · Local authority · Yorkshire and the Humber

    Incumbent: CBRE Limited

    Hull City Council (The Authority) has appointed CBRE Limited (company number 03536032) to provide Consultancy services Support for the Housing Delivery Partner to advise and support the delivery of a comprehensive suite of tender documentat…

    Published value
    £115k
    Annual run-rate
    £113kpublished value ÷ term, exc. VAT
    Term
    5 Oct 2026 → 10 Oct 2027 · 1 yr
    Reference
    ocds-h6vhtk-078530
  3. Estimated end · in 352 daysFramework record

    WCC & PC Validation, Verification and Surveying

    Forestry and Land Scotland · Scotland

    Incumbent: Soil Association Certification

    • Environmental services
    Published value
    £315kpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 11 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-04ea2d
  4. Estimated end · in 352 daysFramework record

    Laboratory Diagnostics, Point of Care Testing & Pathology Managed Service

    NHS Supply Chain · NHS & health · Nationwide (UK), West Midlands, Wales (Cymru), Scotland

    Incumbent: Critical Healthcare Limited

    • Repair and maintenance services
    Published value
    £20bnpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 11 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-0397e8
  5. Estimated end · in 352 daysFramework recordPanel · 49 suppliers

    Decarbonisation & Retrofit Framework

    Procurement for Housing · Nationwide (UK)

    Panel: ARCUS CONSULTING LLP, Alternative Heat Ltd., Architectural Decorators Ltd +46 more

    • Building installation work
    Published value
    £520mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 11 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-03967e
  6. Estimated end · in 352 daysFramework recordPanel · 5 suppliers

    Cloud and Hosting Services Framework

    Scottish Government · Scotland

    Panel: BrightSolid, DataVita Limited, Iomart Hosting +2 more

    • IT services: consulting, software development, Internet and support
    Published value
    £20mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 11 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-038a7d
  7. Estimated end · in 352 daysCall-offPanel · 2 suppliers

    Football Foundation PlayZones Framework (Providers) London & South East England

    Football Foundation · North East England, North West England, East Midlands, West Midlands, East of England, Greater London

    Panel: Cleveland Land Services (Guisborough) Ltd, McArdle Sport Tec Ltd · Last contest: 2 bids (2 SME)

    The Contracting Authority is establishing a multiple provider framework to deliver small-sided, multi-use pitches. Providers will be required to design and build the small-sided pitch and all associated works to provide a playing surface fo…

    • Construction work
    Published value
    £16mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 11 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-03ac8f
  8. Estimated end · in 352 daysFramework recordPanel · 3 suppliers

    Social Care (Technology-Driven) Taxi Transport Service - Framework Agreement

    London Borough of Wandsworth · Local authority · Greater London

    Panel: ADDISON LEE LIMITED, CMAC Group Ltd, Green Tomato Cars

    • Taxi services
    Published value
    £3.0mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 11 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-03bd93
  9. Estimated end · in 352 days

    Creative Consultancy

    Liverpool City Council · Local authority · North West England

    Incumbent: Red and Grey Creative Limited · Last contest: 6 bids

    Culture Liverpool are looking for a Creative Consultant to devise and produce creative programmes for the City of Liverpool and wider region.

    • Marketing management consultancy services
    Published value
    £280k
    Annual run-rate
    —start date not published
    Term
    Estimated end 11 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-03ed29
  10. Estimated end · in 352 days

    Applicant Tracking Software Solution

    Met Office · Central government · South West England

    Incumbent: Tribepad Limited · Last contest: 4 bids

    Provision of Applicant Tracking Software Solution, implementation and support & maintenance for a period of 4 years.

    • Software package and information systems
    Published value
    £177k
    Annual run-rate
    —start date not published
    Term
    Estimated end 11 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-03ce87

When contracts end
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

38,087 contracts and agreements end within 24 months, 60,556 in total · £43bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months5,791
  2. 3–6 months7,972
  3. 6–12 months10,032
  4. 12–24 months14,292

By sector, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.