Expiring UK Public Contracts: Retender Radar

Explore UK public contracts by expiry date, with buyers, incumbent suppliers and extension options. Estimated end dates are labelled; expiry does not guarantee a new tender.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 1,781–1,790

  1. Estimated end · in 249 daysFramework recordPanel · 3 suppliers

    Kitchen refurbishments and associated works to domestic dwellings

    Berneslai Homes Limited · Yorkshire and the Humber

    Panel: Certus Construction Group Limited, NU BUILD (BARNSLEY) LTD, Roy Wright & Company Limited

    • Installation of fitted kitchens
    Published value
    £3.0mlargest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 4 Jul 2027 · start not published
    Reference
    ocds-h6vhtk-03bf23
  2. Estimated end · in 249 days

    M-SParc Phase 2 Construction Works

    Prifysgol Bangor / Bangor University · Education · Wales (Cymru)

    Incumbent: C.WYNNE & SONS LIMITED · Last contest: 3 bids (3 SME)

    Bangor University is currently finalising a business case to request funding from the North Wales Growth Deal to deliver Egni, a new low/zero carbon two-storey development on the M-SParc site in Gaerwen, Anglesey. Egni will provide an estim…

    • Building construction work
    Published value
    £704k
    Annual run-rate
    —start date not published
    Term
    Estimated end 4 Jul 2027 · start not published
    Reference
    ocds-h6vhtk-04789b
  3. Ends · in 250 days

    Fire Detection System Replacement

    Bournemouth University · Education

    Incumbent: Wessex Fire & Security Ltd

    Replacement of ADT Fire Detection System with GENT Fire Detection systems at Poole House, Dorset House, Christchurch House and Sir Michael Cobham Library. All equipment supplied under this contract carries a 12-month warranty covering manuf…

    Published value
    £291kinc. VAT as published
    Annual run-rate
    £292kpublished value ÷ term, inc. VAT
    Term
    6 Jul 2026 → 5 Jul 2027 · 1 yr
    Reference
    ocds-h6vhtk-06d6b7
  4. Estimated end · in 251 daysFramework recordPanel · 4 suppliers

    Major Works Contractor Framework

    Leeds City Council · Local authority · Yorkshire and the Humber

    Panel: BAM Nuttall Limited, Balfour Beatty Civil Engineering, Farrans Construction trading as a division of Northstone (NI) Ltd. +1 more

    • Construction work

    Re-procurement plannedYORbuild4 Medium Works Contractors Framework Agreement West Area · tender expected

    Published value
    £360mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 6 Jul 2027 · start not published
    Reference
    ocds-h6vhtk-0389af
  5. Estimated end · in 251 daysFramework recordPanel · 2 suppliers

    DH21021 - Extensions Framework

    Derby Homes Ltd · East Midlands

    Panel: NRA Construct Ltd, SPK BUILDING SERVICES LIMITED

    • Building construction work
    Published value
    £3.0mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 6 Jul 2027 · start not published
    Reference
    ocds-h6vhtk-03c5b9
  6. Ends · in 251 days

    Estates Work

    University of Plymouth · Education · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: SANCTUARY MANAGEMENT SERVICES

    Installation of new DHW Heater.

    Published value
    £31kinc. VAT as published
    Annual run-rate
    £16kpublished value ÷ term, inc. VAT
    Term
    7 Jul 2025 → 6 Jul 2027 · 2 yrs
    Reference
    ocds-h6vhtk-058727
  7. Ends · in 252 days

    A27 Falmer Footbridge Headroom for BAPA - Network Rail

    National Highways Limited · Central government

    Incumbent: Network Rail Infrastructure

    614752 A27 Falmer Footbridge Headroom for BAPA to carrying out cores for the full length of the slip road on carriageway of which section of it is on top of Network Rail tunnel below the carriageway surface followed by resurfacing and reins…

    Published value
    £12k
    Annual run-rate
    £12kpublished value ÷ term, exc. VAT
    Term
    8 Jul 2026 → 7 Jul 2027 · 1 yr
    Reference
    ocds-h6vhtk-06c52c
  8. Estimated end · in 253 daysDynamic purchasing system record

    CAL21012 Broadford Primary School - New School

    The Highland Council · Local authority · Scotland

    Incumbent: Morgan Sindall Construction and Infrastructure Ltd

    • Construction work
    Published value
    £19mlargest agreement; total ceiling not published
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 8 Jul 2027 · start not published
    Reference
    ocds-h6vhtk-04b1d5
  9. Ends · in 253 days

    Park Avenue Mental Health Hub - Access Control

    London Borough of Enfield · Local authority · Greater London

    Incumbent: ATEC fire and security

    Enfield Council are undertaking a project to renovate the Park Avenue & create a Mental Health Hub. As part of the project, electronic access control will need to be installed to secure the external main entrance doors, and some of the inte…

    Published value
    £488kinc. VAT as published
    Annual run-rate
    £244kpublished value ÷ term, inc. VAT
    Term
    8 Jul 2025 → 8 Jul 2027 · 2 yrs
    Reference
    ocds-h6vhtk-06e51b
  10. Ends · in 253 days

    Community House - Access System

    London Borough of Enfield · Local authority · Greater London

    Incumbent: ATEC fire and security

    Access control fit out to ensure a secure building for the service needs at community house

    Published value
    £49kinc. VAT as published
    Annual run-rate
    £24kpublished value ÷ term, inc. VAT
    Term
    8 Jul 2025 → 8 Jul 2027 · 2 yrs
    Reference
    ocds-h6vhtk-06e51d

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,848 contracts and agreements end within 24 months, 4,753 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months928
  2. 3–6 months583
  3. 6–12 months597
  4. 12–24 months740

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.