Retender radar: UK public contracts ending soon
Every contract on Find a Tender with a published end date in the future, one row per contract (lot). A contract ending is a procurement starting — unless the buyer uses a published extension option, which the row shows. Frameworks and DPS are marked: what ends there is the vehicle, not one supplier’s contract.
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
252 contracts end within 24 months, 424 in total · £2.8bn published GBP value, exc. VAT, in the all future end dates (framework ceilings included, not a spend forecast).
By sector, all future end dates i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
CPV division of the procedure; a contract with several divisions counts in each.
90Sewage, refuse, cleaning and environmental3,04285Health and social work services2,82160Transport services (except waste transport)1,28933Medical equipments, pharmaceuticals1,00679Business services: law, marketing, consulting87380Education and training services74345Construction work42450Repair and maintenance services424
Contracts ending in the all future end dates
Showing 91–105
- Ends · in 42 days
ITT 31/2026 - PEACEPLUS PP1024 Schomberg Society Kilkeel Refurbishment Project Retender
Newry, Mourne and Down District Council (NMD) · Local authority · Nationwide (UK)
Incumbent: MAMO BUILDING SERVICES LIMITED
- Contract value
- £114k
- Annual run-rate
- —term under 6 months
- Term
- 17 Sept 2026 → 23 Nov 2026 · 2 months
- Reference
ocds-h6vhtk-06e729
- Ends · in 42 days
Scaffoldings works to facilitate the Roof Replacement (Phase 1) to Horsforth Featherbank Primary School
Leeds City Council · Local authority · Yorkshire and the Humber
Incumbent: LOUIS JAMES SCAFFOLDING LTD
- Contract value
- £29k
- Annual run-rate
- —term under 6 months
- Term
- 13 Jul 2026 → 23 Nov 2026 · 4 months
- Reference
ocds-h6vhtk-069d5a
- Ends · in 44 daysFramework re-letPanel · 9 suppliers
Lot 1 - Highway Electrical Connections on DNOs or IDNOs Networks (Contestable Works)
ESPO · Nationwide (UK)
Panel: Altitude Services Limited, CARBON POINT CONNECTIONS LTD, Cable Test Limited +6 more
- Contract value
- £13mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 25 Nov 2026 · start not published
- Reference
ocds-h6vhtk-0471c0
- Ends · in 44 daysFramework re-letPanel · 9 suppliers
Lot 2 - Highway Electrical Connections on DNOs or IDNOs Networks (Contestable Works) and Privately-owned Networks, and Minor Installation Works
ESPO · Nationwide (UK)
Panel: Altitude Services Limited, CARBON POINT CONNECTIONS LTD, Cable Test Limited +6 more
- Contract value
- £13mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 25 Nov 2026 · start not published
- Reference
ocds-h6vhtk-0471c0
- Ends · in 44 days
Church Lane Play Area Refurbishment
Gedling Borough Council · Local authority · Nationwide (UK), East Midlands
Incumbent: Wicksteed Leisure Ltd
- Contract value
- £98k
- Annual run-rate
- —term under 6 months
- Term
- 7 Sept 2026 → 25 Nov 2026 · 2 months
- Reference
ocds-h6vhtk-065c05
- Ends · in 46 days
Land Enabling Works
ORE Catapult · Other public body · Nationwide (UK)
Incumbent: CHAP Group (Aberdeen) Ltd
- Contract value
- £643k
- Annual run-rate
- £769kvalue ÷ published term
- Term
- 27 Jan 2026 → 27 Nov 2026 · 10 months
- Reference
ocds-h6vhtk-05dfa9
- Ends · in 47 days
Abington Library Refurbishment Works
West Northamptonshire Council · Local authority · East Midlands
Incumbent: Forstarr Building Services Ltd
- Contract value
- £400kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 14 Sept 2026 → 28 Nov 2026 · 2 months
- Reference
ocds-h6vhtk-06b5cd
- Ends · in 49 daysFramework re-letPanel · 11 suppliers
NUN - HEART Disabled Aids, Adaptations and Associated Works
Nuneaton and Bedworth Borough Council · Local authority · West Midlands
Panel: 3MS Gold Services Ltd , Brenbuild Services Ltd , Dodd Group (Midlands) Ltd +8 more
- Contract value
- £5.0mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 30 Nov 2026 · start not published
- Reference
ocds-h6vhtk-0489f1
- Ends · in 49 days
Infrastructure Works at Hethel Technology Park
South Norfolk Council · Local authority · East of England
Incumbent: Jackson Civil Engineering Group Limited
- Contract value
- £3.9m
- Annual run-rate
- £5.3mvalue ÷ published term
- Term
- 5 Mar 2026 → 30 Nov 2026 · 8 months
- Reference
ocds-h6vhtk-04f796
- Ends · in 49 daysFramework re-letPanel · 2 suppliers
PROC 21-1181 Supply, Delivery and Installation of Office Furniture
Scottish Police Authority · Police & fire · Scotland
Panel: Flexiform Business Furniture Ltd, Flexiform Limited
- Contract value
- £3.9mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- 1 Jul 2023 → 30 Nov 2026 · 3.4 yrs
- Reference
ocds-h6vhtk-037f43
- Ends · in 49 daysFramework re-letPanel · 12 suppliers
NUN - HEART Disabled Aids, Adaptations and Associated Works
Nuneaton and Bedworth Borough Council · Local authority · West Midlands
Panel: 3MS Gold Services Ltd , Adroit Services Limited , Cardo (Central) Limited +9 more
- Contract value
- £2.6mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 30 Nov 2026 · start not published
- Reference
ocds-h6vhtk-0489f1
- Ends · in 49 daysFramework re-letPanel · 12 suppliers
NUN - HEART Disabled Aids, Adaptations and Associated Works
Nuneaton and Bedworth Borough Council · Local authority · West Midlands
Panel: 3MS Gold Services Ltd , APD Building, Adroit Services Limited +9 more
- Contract value
- £2.6mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 30 Nov 2026 · start not published
- Reference
ocds-h6vhtk-0489f1
- Ends · in 49 daysFramework re-letPanel · 3 suppliers
NUN - HEART Disabled Aids, Adaptations and Associated Works
Nuneaton and Bedworth Borough Council · Local authority · West Midlands
Panel: Brenbuild Services Ltd , Impart links Limited , Westone Housing Limited
- Contract value
- £1.5mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 30 Nov 2026 · start not published
- Reference
ocds-h6vhtk-0489f1
- Ends · in 49 days
Leashaw Landslide Repair Works
Derbyshire County Council · Local authority · East Midlands
Incumbent: C.T. CONSTRUCTION LIMITED
- Contract value
- £1.4minc. VAT as published
- Annual run-rate
- £2.8mvalue ÷ published term
- Term
- 29 May 2026 → 30 Nov 2026 · 6 months
- Reference
ocds-h6vhtk-065485
- Ends · in 49 daysFramework re-letPanel · 3 suppliers
NUN - HEART Disabled Aids, Adaptations and Associated Works
Nuneaton and Bedworth Borough Council · Local authority · West Midlands
Panel: Impart links Limited , M & J Stilp Ltd , Westone Housing Limited
- Contract value
- £1.3mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 30 Nov 2026 · start not published
- Reference
ocds-h6vhtk-0489f1
How to read the radar
- End date is the contract period end the buyer published on Find a Tender. Contracts without an end date are not on the radar.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend instead of retendering. Hide them to see contracts that must be re-procured.
- Incumbent is the canonical supplier on the award behind the contract. A panel (several suppliers on one award) is shown as a panel — no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term, only for a single supplier, a term of six months or more and a plain contract (not a framework or DPS ceiling).
- Counts are exact from the nightly projection when you filter by horizon and sector only; any other filter shows a bounded total — exact up to 1,000 contracts, an honest “1,000+” floor above that.