Expiring UK Public Contracts: Retender Radar
Explore UK public contracts by expiry date, with buyers, incumbent suppliers and extension options. Estimated end dates are labelled; expiry does not guarantee a new tender.
Contracts ending in the next 24 months
Showing 1,786–1,800
- Ends · in 245 days
Repair/replacement Footbridge, Mitton, Tewkesbury
Tewkesbury Borough Council · Local authority
Incumbent: Beaver Bridges Ltd
The Employer requires: • Dismantling and safe off-site disposal of the existing footbridge • Design and construction of a new metal footbridge, suitable for foot and cycle traffic • Installation of a temporary bridge to maintain uninterrupt…
- Published value
- £377k
- Annual run-rate
- £497kpublished value ÷ term, exc. VAT
- Term
- 29 Sept 2026 → 2 Jul 2027 · 9 months
- Reference
ocds-h6vhtk-0678fe
- Ends · in 245 days
Burton Homes Almshouses Refurbishment Works
Tai Hedyn Limited · Other public body · Wales (Cymru)
Incumbent: Glanmor Developments Limited
General Refurbishment works at Burton Homes Almshouses, Chepstow
- Published value
- £192k
- Annual run-rate
- £273kpublished value ÷ term, exc. VAT
- Term
- 19 Oct 2026 → 2 Jul 2027 · 8 months
- Reference
ocds-h6vhtk-07881b
- Ends · in 245 days
Roof Replacement
North East London NHS Foundation Trust · Central government · Nationwide (UK)
Incumbent: James Roofing & Construction Ltd
Capital Expenditure Works yard,(new estates office) Roof replacement
- Published value
- £142k
- Annual run-rate
- £142kpublished value ÷ term, exc. VAT
- Term
- 3 Jul 2026 → 2 Jul 2027 · 1 yr
- Reference
ocds-h6vhtk-06c81b
- Estimated end · in 247 daysFramework recordPanel · 3 suppliers
Kitchen refurbishments and associated works to domestic dwellings
Berneslai Homes Limited · Yorkshire and the Humber
Panel: Certus Construction Group Limited, NU BUILD (BARNSLEY) LTD, Roy Wright & Company Limited
- Published value
- £3.0mlargest agreement; total ceiling not published
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 4 Jul 2027 · start not published
- Reference
ocds-h6vhtk-03bf23
- Estimated end · in 247 days
M-SParc Phase 2 Construction Works
Prifysgol Bangor / Bangor University · Education · Wales (Cymru)
Incumbent: C.WYNNE & SONS LIMITED · Last contest: 3 bids (3 SME)
Bangor University is currently finalising a business case to request funding from the North Wales Growth Deal to deliver Egni, a new low/zero carbon two-storey development on the M-SParc site in Gaerwen, Anglesey. Egni will provide an estim…
- Published value
- £704k
- Annual run-rate
- —start date not published
- Term
- Estimated end 4 Jul 2027 · start not published
- Reference
ocds-h6vhtk-04789b
- Ends · in 248 days
Fire Detection System Replacement
Bournemouth University · Education
Incumbent: Wessex Fire & Security Ltd
Replacement of ADT Fire Detection System with GENT Fire Detection systems at Poole House, Dorset House, Christchurch House and Sir Michael Cobham Library. All equipment supplied under this contract carries a 12-month warranty covering manuf…
- Published value
- £291kinc. VAT as published
- Annual run-rate
- £292kpublished value ÷ term, inc. VAT
- Term
- 6 Jul 2026 → 5 Jul 2027 · 1 yr
- Reference
ocds-h6vhtk-06d6b7
- Estimated end · in 249 daysFramework recordPanel · 4 suppliers
Major Works Contractor Framework
Leeds City Council · Local authority · Yorkshire and the Humber
Panel: BAM Nuttall Limited, Balfour Beatty Civil Engineering, Farrans Construction trading as a division of Northstone (NI) Ltd. +1 more
Re-procurement plannedYORbuild4 Medium Works Contractors Framework Agreement West Area · tender expected
- Published value
- £360mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 6 Jul 2027 · start not published
- Reference
ocds-h6vhtk-0389af
- Estimated end · in 249 daysFramework recordPanel · 2 suppliers
DH21021 - Extensions Framework
Derby Homes Ltd · East Midlands
Panel: NRA Construct Ltd, SPK BUILDING SERVICES LIMITED
- Published value
- £3.0mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 6 Jul 2027 · start not published
- Reference
ocds-h6vhtk-03c5b9
- Ends · in 249 days
Estates Work
University of Plymouth · Education · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: SANCTUARY MANAGEMENT SERVICES
Installation of new DHW Heater.
- Published value
- £31kinc. VAT as published
- Annual run-rate
- £16kpublished value ÷ term, inc. VAT
- Term
- 7 Jul 2025 → 6 Jul 2027 · 2 yrs
- Reference
ocds-h6vhtk-058727
- Ends · in 250 days
A27 Falmer Footbridge Headroom for BAPA - Network Rail
National Highways Limited · Central government
Incumbent: Network Rail Infrastructure
614752 A27 Falmer Footbridge Headroom for BAPA to carrying out cores for the full length of the slip road on carriageway of which section of it is on top of Network Rail tunnel below the carriageway surface followed by resurfacing and reins…
- Published value
- £12k
- Annual run-rate
- £12kpublished value ÷ term, exc. VAT
- Term
- 8 Jul 2026 → 7 Jul 2027 · 1 yr
- Reference
ocds-h6vhtk-06c52c
- Estimated end · in 251 daysDynamic purchasing system record
CAL21012 Broadford Primary School - New School
The Highland Council · Local authority · Scotland
Incumbent: Morgan Sindall Construction and Infrastructure Ltd
- Published value
- £19mlargest agreement; total ceiling not published
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 8 Jul 2027 · start not published
- Reference
ocds-h6vhtk-04b1d5
- Ends · in 251 days
Park Avenue Mental Health Hub - Access Control
London Borough of Enfield · Local authority · Greater London
Incumbent: ATEC fire and security
Enfield Council are undertaking a project to renovate the Park Avenue & create a Mental Health Hub. As part of the project, electronic access control will need to be installed to secure the external main entrance doors, and some of the inte…
- Published value
- £488kinc. VAT as published
- Annual run-rate
- £244kpublished value ÷ term, inc. VAT
- Term
- 8 Jul 2025 → 8 Jul 2027 · 2 yrs
- Reference
ocds-h6vhtk-06e51b
- Ends · in 251 days
Community House - Access System
London Borough of Enfield · Local authority · Greater London
Incumbent: ATEC fire and security
Access control fit out to ensure a secure building for the service needs at community house
- Published value
- £49kinc. VAT as published
- Annual run-rate
- £24kpublished value ÷ term, inc. VAT
- Term
- 8 Jul 2025 → 8 Jul 2027 · 2 yrs
- Reference
ocds-h6vhtk-06e51d
- Ends · in 252 days
The construction of an Electric Vehicle Charging Area Transit Station - South Birmingham
West Midlands Combined Authority · Local authority · West Midlands
Incumbent: McPhillips (Wellington) Limited
Construction Works to build an Electric Vehicle Charging Area Transit Station - South Birmingham
- Published value
- £2.5m
- Annual run-rate
- £3.4mpublished value ÷ term, exc. VAT
- Term
- 19 Oct 2026 → 9 Jul 2027 · 9 months
- Reference
ocds-h6vhtk-07920d
- Ends · in 252 days
UNDERTAKE CAR PARK RESURFACING WORK AS PER ATTACHED QUOTE OUTSIDE UTC
Derbyshire Community Health Services NHS Foundation Trust · Central government · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Johnson Surfacing Limited
ILKESTON HOSPITAL - UNDERTAKE CAR PARK RESURFACING WORK AS PER ATTACHED QUOTE OUTSIDE UTC
- Published value
- £20k
- Annual run-rate
- £20kpublished value ÷ term, exc. VAT
- Term
- 10 Jul 2026 → 9 Jul 2027 · 1 yr
- Reference
ocds-h6vhtk-06e6cb
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,867 contracts and agreements end within 24 months, 4,773 in total · £8.6bn published GBP values end in the next 24 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 24 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services5,35479Business services: law, marketing, consulting3,98460Transport services (except waste transport)3,72845Construction work2,86772IT services: consulting, software, internet2,38171Architectural, construction, engineering2,31850Repair and maintenance services2,23780Education and training services1,951
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.