Find a TenderAwarded
Published 13 Sept 2024, 13:31 BST

Official UK procurement notice

YPO 001244 - The supply and installation of Furniture covering Office, Fitted, Laboratory, Library & Learning Spaces, Residential, Outdoor including associated products and services

Official notice

Authority: YPO

Framework agreement6 lotsGoodsOpen procedure
Framework ceiling (notional)£250,000,000total for 6 lots · framework ceiling, not attributable revenue
Submissions closed 25 Oct 2024awarded 13 Feb 2025
Lots 6see the lot list below
Framework period 4 yrsends 31 Dec 2028 · extension options published · starts 1 Jan 2025

What is being bought6 lots · detail below

Published requirement description

YPO are looking for Providers to be appointed onto a Framework Agreement for the Supply Delivery and Installation of Furniture covering Residential, Care, Library and Learning Spaces, Fitted, Outdoor, Dining and Social Spaces and associated Products and Services. For use in the education and local authority sectors. This Framework is designed to meet the needs of YPO and Other Contracting Authorities by establishing an agreement in two ways as decided by customer requirements and preferences.

1 – Contractual Basis - Whereby the end customer will place the order with the Provider and the Provider deliveries direct to the end customer.

2 - Direct basis - Whereby the end customer places the order with YPO and YPO places the order with the Provider, but the Provider delivers direct to the end customer.

  • Recurrence: There is a possibility that this framework will be subject to renewal after 3.5 years from the commencement date.

CPV: Bathroom furniture · Bedroom furniture · Bedroom furniture, other than beds and beddings · Bedroom, dining room and living-room furniture · Beds and bedding and specialist soft furnishings · Bedside tables · Chests of drawers · Coffee tables · Cots · Dining tables · Dining-room furniture · Domestic furniture · +10 more

How this framework works

From the published notice
Bids received
16 bids on the busiest of 6 lots · 27 suppliers appointed
Framework period
4 yrs from 1 Jan 2025

Lots and requirements (6)Procurement structure

6 lots · no lot values published · same evaluation weights on every lot
Lot #1Fitted FurnitureAwardedRenewal 4 yrs

This Lot is for Fitted Furniture, predominantly (but not limited to) laboratory, IT, food technology environments and associated products and services to be delivered directly to the end user. Additional information: The 50% Non Cost evaluation criteria will be broken down and evaluated as follows:

  • Innovation and Quality of Products (25%)
  • Planning and Design (50%)
  • Social Value and Sustainability (25%)
Contract period: 1 Jan 2025 – 31 Dec 2028 (4 yrs)
Delivery: UK
Extensions: The Framework Agreement will cover the period from 1st March 2025 to 28th February 2027 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of November 2026 and will be dependent on satisfactory completion of all aspects of the Framework to date, the current market conditions for this category and YPO’s contracting structures. The maximum Framework period will therefore be 4 years, from 1st March 2025 to 28th February 2029 (subject to an annual review, incorporating price negotiations and KPI performance). · There is a possibility that this framework will be subject to renewal after 3.5 years from the commencement date.Variant bids: not allowed
Lot #2Library and Learning SpacesAwardedRenewal 4 yrs

This Lot is for Library and Learning Spaces predominantly (but not limited to) shelving, storage, breakout furniture and associated products and services to be delivered directly to the end user. Additional information: The 50% Non Cost evaluation criteria will be broken down and evaluated as follows:

  • Innovation and Quality of Products (25%)
  • Planning and Design (50%)
  • Social Value and Sustainability (25%)
Contract period: 1 Jan 2025 – 31 Dec 2028 (4 yrs)
Delivery: UK
Extensions: The Framework Agreement will cover the period from 1st March 2025 to 28th February 2027 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of November 2026 and will be dependent on satisfactory completion of all aspects of the Framework to date, the current market conditions for this category and YPO’s contracting structures. The maximum Framework period will therefore be 4 years, from 1st March 2025 to 28th February 2029 (subject to an annual review, incorporating price negotiations and KPI performance). · There is a possibility that this framework will be subject to renewal after 3.5 years from the commencement date.Variant bids: not allowed
Lot #3Residential Care FurnitureAwardedRenewal 4 yrs

This Lot is for Residential Care Furniture predominantly (but not limited to) dining, bedroom, lounge furniture and associated products and services to be delivered directly to the end user. Additional information: The 50% Non Cost evaluation criteria will be broken down and evaluated as follows:

  • Innovation and Quality of Products (25%)
  • Planning and Design (50%)
  • Social Value and Sustainability (25%)
Contract period: 1 Jan 2025 – 31 Dec 2028 (4 yrs)
Delivery: UK
Extensions: The Framework Agreement will cover the period from 1st March 2025 to 28th February 2027 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of November 2026 and will be dependent on satisfactory completion of all aspects of the Framework to date, the current market conditions for this category and YPO’s contracting structures. The maximum Framework period will therefore be 4 years, from 1st March 2025 to 28th February 2029 (subject to an annual review, incorporating price negotiations and KPI performance). · There is a possibility that this framework will be subject to renewal after 3.5 years from the commencement date.Variant bids: not allowed
Lot #4Residential Domestic FurnitureAwardedRenewal 4 yrs

This Lot is for Residential Domestic Furniture predominantly (but not limited to) covering dining, bedroom, lounge furniture and associated products and services to be delivered directly to the end user. Additional information: The 50% Non Cost evaluation criteria will be broken down and evaluated as follows:

  • Innovation and Quality of Products (25%)
  • Planning and Design (50%)
  • Social Value and Sustainability (25%)
Contract period: 1 Jan 2025 – 31 Dec 2028 (4 yrs)
Delivery: UK
Extensions: The Framework Agreement will cover the period from 1st March 2025 to 28th February 2027 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of November 2026 and will be dependent on satisfactory completion of all aspects of the Framework to date, the current market conditions for this category and YPO’s contracting structures. The maximum Framework period will therefore be 4 years, from 1st March 2025 to 28th February 2029 (subject to an annual review, incorporating price negotiations and KPI performance). · There is a possibility that this framework will be subject to renewal after 3.5 years from the commencement date.Variant bids: not allowed
Lot #5Outdoor FurnitureAwardedRenewal 4 yrs

This Lot is for Outdoor Furniture predominately (but not limited to) seating, benches, shelters, bike storage and associated products and services to be delivered directly to the end user. Additional information: The 50% Non Cost evaluation criteria will be broken down and evaluated as follows:

  • Innovation and Quality of Products (25%)
  • Planning and Design (50%)
  • Social Value and Sustainability (25%)
Contract period: 1 Jan 2025 – 31 Dec 2028 (4 yrs)
Delivery: UK
Extensions: The Framework Agreement will cover the period from 1st March 2025 to 28th February 2027 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of November 2026 and will be dependent on satisfactory completion of all aspects of the Framework to date, the current market conditions for this category and YPO’s contracting structures. The maximum Framework period will therefore be 4 years, from 1st March 2025 to 28th February 2029 (subject to an annual review, incorporating price negotiations and KPI performance). · There is a possibility that this framework will be subject to renewal after 3.5 years from the commencement date.Variant bids: not allowed
Lot #6Dining FurnitureAwardedRenewal 4 yrs

This Lot is for Dining Furniture predominantly (but not limited to) chairs, tables, stools, seating, and associated products and services to be delivered directly to the end user. Additional information: The 50% Non Cost evaluation criteria will be broken down and evaluated as follows:

  • Innovation and Quality of Products (25%)
  • Planning and Design (50%)
  • Social Value and Sustainability (25%)
Contract period: 1 Jan 2025 – 31 Dec 2028 (4 yrs)
Delivery: UK
Extensions: The Framework Agreement will cover the period from 1st March 2025 to 28th February 2027 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of November 2026 and will be dependent on satisfactory completion of all aspects of the Framework to date, the current market conditions for this category and YPO’s contracting structures. The maximum Framework period will therefore be 4 years, from 1st March 2025 to 28th February 2029 (subject to an annual review, incorporating price negotiations and KPI performance). · There is a possibility that this framework will be subject to renewal after 3.5 years from the commencement date.Variant bids: not allowed

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored · same split on all 6 lots
Quality: 50%Price: 50%
Published sub-criteria (2)
  • Non Cost: 50%
  • price: 50%
Published award criteria (2)
  • Non Cost: 50%
  • Price: 50%
Conditions of participation1
  • Suitability

    Organisations must ensure that they are not in breach of any of the mandatory or discretionary exclusions contained in Regulation 57 of the Public Contracts Regulations 2015. Please refer to the

    Tender Documentation/ Online Tender located on our E-Procurement system. The web address can be found under ‘Procurement Documents’ in ‘Communication’ section in this notice.

What this means for your bid
  • Price carries 50 of 100 points: a 10% discount moves about 5 points. This one is won on the number: sharpen the price before polishing the prose.
  • “YPO 001244 - The supply and installation of Furniture covering Office,…” is a framework: the contest is a place on its panel, not a single contract.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record · publisher note attached
Procedure method
Open procedure
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Goods
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement

Yes · There is a possibility that this framework will be subject to renewal after 3.5 years from the commencement date.

First published
13 Sept 2024, 13:31 BST
Last source update
3 Mar 2025, 19:32 GMT
Award evaluation window
24 Oct 2024 – …
Authority reference
001244
FTS notice number
2025/S 000-007729
Classification (CPV)
Bathroom furnitureBedroom furnitureBedroom furniture, other than beds and beddingsBedroom, dining room and living-room furnitureBeds and bedding and specialist soft furnishingsBedside tablesChests of drawersCoffee tablesCotsDining tables
+12 moreDining-room furnitureDomestic furniture
Delivery area
UK
Official registry OCID
ocds-h6vhtk-049ac2 Find a Tender
Contract terms
Performance terms

Please refer to the Framework Agreement Terms and Conditions located on our E-Procurement system. The web address can be found under Procurement Documents in ‘Communication’ Section in this notice.

Publisher note: YPO are purchasing on the behalf of other contracting authorities. Please see the below link for details: https://www.ypo.co.uk/about/customers/permissible-users . YPO will incorporate a standstill period at the point of notification of the award of the contract is provided to all bidders. The standstill period will be for a minimum of 10 calendar days, and provides time for unsuccessful tenderers to challenge the award decision before the contract is entered into. The Public Contracts Regulations 2015 provide for aggrieved parties who have been harmed or are at risk of harm by a breach of the rules to take action in the High Court (England, Wales and Northern Ireland).

How it was run

Official notice
Run through: ProContract (Due North) · Who buys & how to bid on ProContract
Supplier login requiredLanguage: EN
Access & registration note: Free · short registration with manual review; public opportunity list
Appointment period ends
25 Oct 2024, 15:00 BST
Submission channel
{"electronicSubmission"}
Accepted languages
en
Bid validity
90 days from the deadline
Bids opened
24 Oct 2024, 14:00 BST
Detailed submission instructions & authority contactsFrom official release

Timeline

24 Oct 2024 → 3 Mar 2025 · 4 dates
  1. Bids opened
    24 Oct 2024, 14:00 BST
  2. Admission / appointment period endsperiod end, not a bid countdown
    25 Oct 2024, 15:00 BST
  3. Contract starts
    1 Jan 2025
  4. Notice published
    3 Mar 2025, 19:32 GMT

Notice history

2 events · 3 releases on Find a Tender · since 24 Oct 2024
  1. Deadline moved to 25 Oct 2024, 15:00 BST
    24 Oct 2024, 13:40 BST
    +1 days · was 24 Oct 2024, 14:00 BST
  2. Status changed to complete
    3 Mar 2025, 19:32 GMT
Published amendments (1 · 1 deadline change)
WhenWhatBeforeAfterShift
—DeadlineTime limit for receipt of tenders or requests to participate · IV.2.224 Oct 202425 Oct 2024+1 d
—Bid openingConditions for opening of tenders · IV.2.724 Oct 202425 Oct 2024+1 d

Submission deadline date extended from 24/10/24 at 2pm to 25/10/24 at 3pm

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Suppliers appointed 27admitted to the panel · see the list ↓
Bids received 16busiest of 6 lots
Contracts signed 6latest 13 Feb 2025

6 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.

Contracts

All 6 of these contracts carry the same published figure, £250,000,000, the framework's maximum for the whole notice, not each contract's own value. They are not eleven separate sums.

  • Lot 1 - Fitted Furniture

    Signed
    13 Feb 2025
    Value
    ceiling above
    Period
    … – 31 Dec 2028
    Status
    active
  • Lot 2 - Library and Learning Spaces

    Signed
    13 Feb 2025
    Value
    ceiling above
    Period
    … – 31 Dec 2028
    Status
    active
  • Lot 3 - Residential Care Furniture

    Signed
    13 Feb 2025
    Value
    ceiling above
    Period
    … – 31 Dec 2028
    Status
    active
  • Lot 4 - Residential Domestic Furniture

    Signed
    13 Feb 2025
    Value
    ceiling above
    Period
    … – 31 Dec 2028
    Status
    active
  • Lot 5 - Outdoor Furniture

    Signed
    13 Feb 2025
    Value
    ceiling above
    Period
    … – 31 Dec 2028
    Status
    active
  • Lot 6 - Dining Furniture

    Signed
    13 Feb 2025
    Value
    ceiling above
    Period
    … – 31 Dec 2028
    Status
    active

Bid statistics published by the authority

LotBidsSMEVCSEValid bid range
1 · Fitted Furniture9bids———
2 · Library and Learning Spaces10bids———
3 · Residential Care Furniture13bids———
4 · Residential Domestic Furniture12bids———
5 · Outdoor Furniture4bids———
6 · Dining Furniture16bids———

Contracting authority & participating public bodies

YPO

Contracting authorityBody governed by public lawGeneral public services 41 Industrial Park, Wakefield, Yorkshire & Humber, WF2 0XEContact name, email, phone Published organisation website ↗

Dispute resolution & review bodies

  • High Court of England and WalesReview body London

Framework contractors & participating bidders

29 commercial parties on the notice
Show 19 more suppliers

Official documents & specifications (2)

Official links; attachments are not copied

Tender pack and attachments

  • Economic and financial selection criteriatenderEconomic and financial selection criteria
  • Technical selection criteriatenderTechnical selection criteria