3808/JN - Flue Gas/CO2 Scrubbing and Conditioning System (16 Lots)

Gas cooling systems
Industrial machinery
Laboratory
+1 more
Published value
Not published
Submission deadline Not published
Lots published16
Procurement Intelligence
Published evidence · v1
Prepared 7 Sept 2026, 20:38 BST
A pre-calculated analytical view of official UK procurement facts, competition benchmarks and decision timelines.
Bid readiness
Review notice
Submission deadline not published
Check official notice for submission route
Scope structure
16lots
16 lots · 16 published items
3 published CPV families
Decision Velocity
~52 days
Typical sector award window after deadline
Sector median: 52 days
Contract lifecycle
Not published
No future linked contract end in retained records
No published extension signal
Pricing & Budget Savings
£816,883
Contract/award value: £816,883
1 award supplier linked
Bidding Competition
1 bids
0 SME bids · 1 electronic
No bid spread metrics published
Sector Market Benchmark (CPV 31)
Based on 58 published procedures
Median Winning Discount
22.5%
Award reduction below published budget
Typical Bids Received
1.5 bidders
Median competitive participation in sector
Typical Evaluation Window
52 days
Median time between deadline and award
Top Contenders in this Sector (CPV 31)
Active commercial suppliers winning public contracts in this field
SupplierAwards won in sectorTotal awarded valueAvg. winning discount
SSE Energy Supply LimitedCRN: PCGX-2814-WLHL
18 contractsNot disclosedAt ceiling / not disclosed
YÜ ENERGY RETAIL LIMITEDCRN: PTNX-6527-XQXY
16 contractsNot disclosedAt ceiling / not disclosed
15 contractsNot disclosedAt ceiling / not disclosed
British Gas Trading LimitedCRN: PPQG-1767-NGCR
14 contractsNot disclosedAt ceiling / not disclosed
Good Energy LtdCRN: PLNW-9135-RDNX
14 contractsNot disclosedAt ceiling / not disclosed
Conrad Energy Group LimitedCRN: PZRR-8583-MLBT
14 contractsNot disclosedAt ceiling / not disclosed
14 contractsNot disclosedAt ceiling / not disclosed
14 contractsNot disclosedAt ceiling / not disclosed
Crown Gas and Power LimitedCRN: PJDJ-2921-JGBW
9 contractsNot disclosedAt ceiling / not disclosed
9 contractsNot disclosedAt ceiling / not disclosed
Evidence coverage
7/12 core inputs published
Standard procedure facts
Comparable published opportunities
Historic records ranked from matching published evidence. They are research comparables, not expected competitors or a price forecast.
Published procedurePublished valueMatching evidence
Manned Aircraft Mounted Lidar and Camera Instrumentation RetenderDEPARTMENT FOR ENVIRONMENT, FOOD AND RURAL AFFAIRS · 17 Aug 2026, 08:44 BST
£3,727,048
same CPV family
Security Services and Surveillance Solutions (SBS10547)NHS Shared Business Services Limited · 13 Aug 2026, 11:22 BST
£100,000,000
same CPV family
£177,666
same CPV family
TFW1073.00 - Fluid Delivery System Transport for Wales Rail Limited (Utility Buyer) · 24 Aug 2026, 14:39 BST
£250,000
same CPV family
1D Measurement Beam - Stage 1NPL Management Limited · 24 Aug 2026, 13:22 BST
£300,000
same CPV family
Method: tender-intelligence-v1. Values and dates are retained OCDS facts; missing source data remains unknown.
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: UNIVERSITY OF SHEFFIELD: "3808/JN - Flue Gas/CO2 Scrubbing and Conditioning System (16 Lots)". Published status: complete. Published value: Value not published. 16 published lots. Submission deadline not published. See the official notice for participation instructions.
Contracting AuthorityUNIVERSITY OF SHEFFIELDScope & CategoriesNot publishedSubmission Window
complete
No deadline published
Submission GatewayDirect notice routeLegal Basis & RegimeStandard procurementEstimated Value (exc. VAT)Not published
Bidder Intelligence · Authority Profile: UNIVERSITY OF SHEFFIELD
Market Analytics
View Authority Profile →
Derived from OCDS awards & bid statistics
Published history for UNIVERSITY OF SHEFFIELD. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Requires at least 5 comparable procedures
Competition Density
1Bids / Report (median)
70.4% of reports have one bid · Mean: 1.7 bids
Supplier ConcentrationHigh Concentration
FuelCell Energy, Inc.Top vendor: 85.8% of attributable value
Payment Terms
Check noticePublished terms
Payment obligations depend on the applicable regime and contract. Consult the official documents.
Coverage: 66 active published awards; 54 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Historical Awarded Suppliers in this Category (CPV 31):
Supplier NameHistoric AwardsAttributable ValueAvg. Price Discount
FuelCell Energy, Inc.10 wins£816,883
COMPOSITE INTEGRATION LTD1 win£135,445
Procedure terms
Contracting AuthorityUNIVERSITY OF SHEFFIELD
Procedure methodNot published
Procurement categoryNot published
Statuscomplete
Framework / DPSNot published
CompetitionNot published
Above thresholdNot published
Legal basisNot published
Tender period startsNot published
Clarification deadlineNot published
Electronic submissionNot published
Submission languagesNot published
Published22 Sept 2023, 14:23 BST
Last source update22 Sept 2023, 14:23 BST
Recurring procurementNot published
ClassificationGas cooling systems, Industrial machinery, Laboratory, optical and precision equipments (excl. glasses)
OCIDocds-h6vhtk-03dc2a
What is being bought
With co-funding from the European Regional Development Fund and BEIS, the University of Sheffield is establishing a national Translational Energy Research Centre (TERC) as an integrated multi-technology, pilotscale R&D platform for low-carbon technologies including hydrogen, bioenergy (BE), and Carbon Capture, Utilisation and Storage (CCUS). Site equipment includes a Molten Carbonate Fuel Cell (MCFC) which forms part of a Bioenergy with Carbon Capture and Storage/Utilisation (BECCS) system. This tender covers the scrubbing and conditioning of biomass boiler flue gas (as well as synthetic/semi-synthetic flue gas) to meet stringent purity requirements of the MCFC. It also covers fuel feed to the Anode side of the MCFC. S-containing impurities as well as compounds containing halogens (e.g., HCl), As, Se and P must be scrubbed to low ppb levels to prevent poisoning of the plant catalyst.
What changed
From the official release history
  1. tender value changed
    22 Sept 2023, 14:23 BST
  2. Status changed to complete
    22 Sept 2023, 14:23 BST
  3. Official notice release published
    22 Sept 2023, 14:23 BST
  4. Submission deadline changed to published date
    22 Sept 2023, 14:23 BST
  5. Published value updated to £350,000
    23 Jun 2023, 15:53 BST
  6. Status changed to active
    23 Jun 2023, 15:53 BST
  7. Official notice release published
    23 Jun 2023, 15:53 BST
  8. Submission deadline changed to 25 Jul 2023, 12:00 BST
    23 Jun 2023, 15:53 BST
  9. Buyer information updated
    23 Jun 2023, 15:53 BST
Lots and requirements (16)
Published by the contracting authority
  • Lot 1 · #1
    Flue gas probe, cathode inlet mixing valve, O2 feed in skid (a-c)
    cancelled
    Published valueNot published
    To monitor flue gas quality for excessive CO and low O2 using an in-situ probe and to bleed in air to maintain required O2 levels or to divert from flue gas supply to air in case of combustion problems, whereby the divertor valve or a combination of a divertor and bleed valve is/are sized for an air bleed of ~1-60Nm3/h) and full air bypass up to 264N/m3. Additional information: This procurement is related to a project and/or programme financed by European Union funds: European Regional Development Fund
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
  • Lot 2 · #10
    Anode superheater
    cancelled
    Published valueNot published
    To accurately (to 3 significant figures) and controllably (ramp-rates of 5-10˚C/h) heat 6-33Nm3/h fuel gas downstream of the anode humidifier, from ambient or elevated temperature (after 20kW anode humidifier to target operating temperatures of 580 ± 25˚C or as high as 640-700 ˚C during startup or hot standby. Additional information: This procurement is related to a project and/or programme financed by European Union funds: European Regional Development Fund
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
  • Lot 3 · #11
    Ultra-pure water (UPW) supply loop
    cancelled
    Published valueNot published
    To provide a cat-5-type ultra-pure water supply loop system with an intermediate 1000L storage for 80 L/h at 2.8 bar (TBC) of deionised water produced from ( 2 off) onsite reverse osmosis plant (with conductivity of 0.1 μS/cm) and provide an estimated 5.5 bar pressurised supply loop for UPW skid for the MCFC and minimum 3 other applications on site: 1) ACP; 2) Electrolyser 2; 3) HP heat exchanger test bed. The MCFC supply shall also include an additional polishing stage for continuous operation with standby capacity and quality monitoring to provide up to 45L/hr with conductivity of 0.05-0.06 μS/cm. The polished UPW supply is required for the cathode steam generator or direct water injection into the recuperator and anode fuel humidifier. It is optional for filling the cathode and anode water seals. Additional information: This procurement is related to a project and/or programme financed by European Union funds: European Regional Development Fund
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
  • Lot 4 · #12
    Ultra-pure water (UPW) skid
    cancelled
    Published valueNot published
    To control the flow of ultra-pure water (UPW) from UPW supply loop to: a. cathode and anode water seals,. b. cathode steam generator for flue gas humidification with expected supply of 2-29kg/h c. cathode-anode heat exchanger, for flue gas humidification with expected supply of 2-29kg/h d. Anode humidifier for fuel gas humidification with expected supply of 1-14kg/h Whereby a) and b) are controlled by level and c) and d) require accurate water metering. Additional information: This procurement is related to a project and/or programme financed by European Union funds: European Regional Development Fund
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
  • Lot 5 · #13
    Anode water seal
    cancelled
    Published valueNot published
    To provide system overpressure protection to protect the MCFC module and incorporating a level adjusting tank for pressure balancing with Cathode exhaust stream. Additional information: This procurement is related to a project and/or programme financed by European Union funds: European Regional Development Fund
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
  • Lot 6 · #14
    MCC
    cancelled
    Published valueNot published
    Motor control centre to provide power management and switching for all relevant BOP plant components included above and in the overall process schematic outlined in Figure 1 (excluding the MCFC module), broadly: By the MCFC - (SCR) controlled power supply to Anode superheater - (SCR) controlled power supply to Cathode superheater. - (SCR) controlled power supply to Anode humidifier /vaporiser (18.2kW in 4 x 230V single phase heaters) - (SCR) controlled power to Cathode steam generator. - Natural gas compressor - Equipment and instrumentation power across the system. - Power management for the main supply (630A) and connection of 30kW regenerative load cell to the grid - PLC power Externally by FGD (potentially as a separate panel) - FAN (VSD) - Wet scrubber system - Dry scrubber system (potentially booster) - UPW circulation loop, and - any equipment and instrumentation power associated with the above or the Cathode skid - PLC power (if required for FGD) Additional information: This procurement is related to a project and/or programme financed by European Union funds: European Regional Development Fund
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
  • Lot 7 · #15
    MCFC module instrument PLC logger
    cancelled
    Published valueNot published
    Optionally electrically isolated module controller to take voltage, temperature, and pressure readings from the MCFC to enable controls integration with gas supply system. (Note BOP controller is excluded) Additional information: This procurement is related to a project and/or programme financed by European Union funds: European Regional Development Fund
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
  • Lot 8 · #16
    Controls manifold
    cancelled
    Published valueNot published
    Instrument air manifold block with in-build solenoids for control of air supply to instruments: pneumatic isolation, 3 way and control valves. Additional information: This procurement is related to a project and/or programme financed by European Union funds: European Regional Development Fund
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
  • Lot 9 · #2
    Flue gas filter
    cancelled
    Published valueNot published
    To remove particulates, from sampled flue gas from (primarily) biomass boiler from 40mg/m3 to. Additional information: This procurement is related to a project and/or programme financed by European Union funds: European Regional Development Fund
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
  • Lot 10 · #3
    Flue gas fan (a-c)
    cancelled
    Published valueNot published
    To sample 72-264Nm3/h of flue gas (on dry basis) primarily from biomass boiler through flue gas manifold pipework (~130m, 4" SS316 pipe) and filter, to the wet scrubber and demister, and downstream equipment to deliver 80-130-300 Nm3/h of humidified gas at 47±15mabr (max 137mbar) to the MCFC. Estimated pressure drops across the full gas train. (See also cathode gas skid regarding control) Additional information: This procurement is related to a project and/or programme financed by European Union funds: European Regional Development Fund
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
  • Lot 11 · #4
    Wet scrubber and demister
    cancelled
    Published valueNot published
    To scrub: • Bioenergy flue gas downstream of flue gas diverter, filter and VSD Blower or • bulk CO2 from site supply to remove impurities to levels required by the MCFC; and with optional capacity to treat an additional 40Nm3/h of bulk CO2 for FT plant. Additional information: This procurement is related to a project and/or programme financed by European Union funds: European Regional Development Fund
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
  • Lot 12 · #5
    CO2 dryer
    cancelled
    Published valueNot published
    To dry up to 80m3/h of CO2 from the Wet Scrubber + Demister down to at least -20˚C dew point for downstream metering. Additional information: This procurement is related to a project and/or programme financed by European Union funds: European Regional Development Fund
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
  • Lot 13 · #6
    Dry scrubber
    cancelled
    Published valueNot published
    To scrub bulk CO2 from site supply to remove impurities (primarily S-containing compounds) to purity requirements of the MCFC; and with a total capacity of 80m3/h, to supply up to 40Nm3/h to the Anode and cathode gas skid + up to 40Nm3/h for FT plant. Additional information: This procurement is related to a project and/or programme financed by European Union funds: European Regional Development Fund
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
  • Lot 14 · #7
    Cathode gas mixing skid
    cancelled
    Published valueNot published
    To meter and mix component gases: CO2, N2, CA, to generate representative flue /process gas mixtures or to modulate real flue/process gases, whereby the CO2 is fed from: • the wet scrubber after demister and Dryer or • the dry scrubber or • bulk CO2 from site supply for subsequent scrubbing the wet /dry scrubber, as a standalone gas or as part of the overall synthetic/real flue/process gas mixture The skid (within its monitoring and control capability) would also meter flue gas/air flowrate and control the flue gas VSD fan as well as the inlet probe and diverter Optionally the skid will also incorporate an additional line for O2 flow metering and control for direct injection into the flue gas where O2 levels are too low , where the O2 will likely be supplied from onsite electrolysis. For emergency stop the skid should also have a separate fixed flow N2 supply (Flow setting TBC) from site services supply (7-8.5bar, 22mm, 10000L/min shared supply) for cathode supply train purge (covering Fuel cell module, cathode superheater, and recuperator. Additional information: This procurement is related to a project and/or programme financed by European Union funds: European Regional Development Fund
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
  • Lot 15 · #8
    Cathode superheater
    cancelled
    Published valueNot published
    To accurately and controllably (ramp-rates of 5-10˚C/hr, setpoint to 3 s.f.) heat-up and maintain setpoint temperatures of 80-130-300Nm3/h of humidified cathode gas (real/synthetic/modulated flue/process gas) downstream of the recuperator and humidifier, from ambient or elevated temperature when preheated by the recuperator (to up to ~600˚C), and to maintain the targe cathode inlet temperature setpoint of 590 ± 25˚C, which may require superheater exit temperatures of 640-700˚C during hot standby. Additional information: This procurement is related to a project and/or programme financed by European Union funds: European Regional Development Fund
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
  • Lot 16 · #9
    Anode gas mixing skid
    cancelled
    Published valueNot published
    To meter and mix component gases: CO2, N2, NG, H2, to generate representative fuel gas mixtures whereby the CO2 is be fed from wet or dry scrubber. Optional recycle loop from anode exhaust. Water skid: controls equipment and instrumentation should be collocated with the anode skid due to special location of equipment. Additional information: This procurement is related to a project and/or programme financed by European Union funds: European Regional Development Fund
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
Timeline
  1. Procedure published
    22 Sept 2023, 14:23 BST
  2. Award unsuccessful
    Not published · Not published
  3. Award unsuccessful
    Not published · Not published
  4. Award unsuccessful
    Not published · Not published
  5. Award unsuccessful
    Not published · Not published
  6. Award active
    Not published · Not published
  7. Award active
    Not published · Not published
  8. Award active
    Not published · Not published
  9. Award active
    Not published · Not published
  10. Award active
    Not published · Not published
  11. Award active
    Not published · Not published
  12. Award active
    Not published · Not published
  13. Award active
    Not published · Not published
  14. Award active
    Not published · Not published
  15. Award active
    Not published · Not published
  16. Award unsuccessful
    Not published · Not published
  17. Award unsuccessful
    Not published · Not published
  18. Contract active
    Signed 20 Sept 2023, 00:00 BST · £38,923
  19. Contract active
    Signed 20 Sept 2023, 00:00 BST · £169,785
  20. Contract active
    Signed 23 Aug 2023, 00:00 BST · £38,485
  21. Contract active
    Signed 23 Aug 2023, 00:00 BST · £12,047
  22. Contract active
    Signed 23 Aug 2023, 00:00 BST · £198,198
  23. Contract active
    Signed 23 Aug 2023, 00:00 BST · £50,289
  24. Contract active
    Signed 23 Aug 2023, 00:00 BST · £129,037
  25. Contract active
    Signed 23 Aug 2023, 00:00 BST · £56,580
  26. Contract active
    Signed 23 Aug 2023, 00:00 BST · £56,272
  27. Contract active
    Signed 23 Aug 2023, 00:00 BST · £67,267
Commercial outcome and competition
Awards
Flue gas probe, cathode inlet mixing valve, O2 feed in skid (a-c)
Not published · Not published · unsuccessful
Ultra-pure water (UPW) skid
Not published · Not published · unsuccessful
Flue gas filter
Not published · Not published · unsuccessful
Flue gas fan (a-c)
Not published · Not published · unsuccessful
FuelCell Energy, Inc.
Not published · Not published · active
FuelCell Energy, Inc.
Not published · Not published · active
FuelCell Energy, Inc.
Not published · Not published · active
FuelCell Energy, Inc.
Not published · Not published · active
FuelCell Energy, Inc.
Not published · Not published · active
FuelCell Energy, Inc.
Not published · Not published · active
FuelCell Energy, Inc.
Not published · Not published · active
FuelCell Energy, Inc.
Not published · Not published · active
FuelCell Energy, Inc.
Not published · Not published · active
FuelCell Energy, Inc.
Not published · Not published · active
Wet scrubber and demister
Not published · Not published · unsuccessful
CO2 dryer
Not published · Not published · unsuccessful
Contracts
Ultra-pure water (UPW) supply loop
£38,923 · signed 20 Sept 2023, 00:00 BST · active
Cathode gas mixing skid
£169,785 · signed 20 Sept 2023, 00:00 BST · active
Anode superheater
£38,485 · signed 23 Aug 2023, 00:00 BST · active
Anode water seal
£12,047 · signed 23 Aug 2023, 00:00 BST · active
MCC
£198,198 · signed 23 Aug 2023, 00:00 BST · active
MCFC module instrument PLC logger
£50,289 · signed 23 Aug 2023, 00:00 BST · active
Controls manifold
£129,037 · signed 23 Aug 2023, 00:00 BST · active
Dry scrubber
£56,580 · signed 23 Aug 2023, 00:00 BST · active
Cathode superheater
£56,272 · signed 23 Aug 2023, 00:00 BST · active
Anode gas mixing skid
£67,267 · signed 23 Aug 2023, 00:00 BST · active
Bid statistics
bids: 1 (lot 10)
electronicBids: 1 (lot 10)
smeBids: 0 (lot 10)
bids: 1 (lot 11)
electronicBids: 1 (lot 11)
smeBids: 0 (lot 11)
bids: 1 (lot 13)
electronicBids: 1 (lot 13)
smeBids: 0 (lot 13)
bids: 1 (lot 14)
electronicBids: 1 (lot 14)
smeBids: 0 (lot 14)
bids: 1 (lot 15)
electronicBids: 1 (lot 15)
smeBids: 0 (lot 15)
bids: 1 (lot 16)
electronicBids: 1 (lot 16)
smeBids: 0 (lot 16)
bids: 1 (lot 6)
electronicBids: 1 (lot 6)
smeBids: 0 (lot 6)
bids: 1 (lot 7)
electronicBids: 1 (lot 7)
smeBids: 0 (lot 7)
bids: 1 (lot 8)
electronicBids: 1 (lot 8)
smeBids: 0 (lot 8)
bids: 1 (lot 9)
electronicBids: 1 (lot 9)
smeBids: 0 (lot 9)
Buyer and organisations in this procedure

UNIVERSITY OF SHEFFIELD

Contracting authority GB-COH-RC000667
View buyer profile
  • UNIVERSITY OF SHEFFIELD
    buyer

    GB-COH: RC000667
    THE UNIVERSITY OF SHEFFIELD,WESTERN BANK, SHEFFIELD, UKE32, S102TN
  • FuelCell Energy, Inc.
    supplier

    GB-COH: 3055699
    3 Great Pasture Road, Danbury, US, 06810
  • The University of Sheffield
    reviewBody

    Sheffield, S10 2TN
Documents (0)
Official links; attachments are not copied
No data
No linked documents are published
Related procedures (0)
No data
No related procedures published