Find a TenderAwardedContract award notice
Published 10 Jul 2025, 14:07 BST

Official UK procurement notice

The Supply of Glue Sticks

Official notice

Authority: Yorkshire Purchasing Organisation (Public body)

Framework agreement3 lotsGoodsOpen procedureAbove thresholdSME suitableVCSE suitable
Framework ceiling (notional)£20,000,000total for 3 lots · framework ceiling, not attributable revenue · 1 value update
Submissions closed 12 Jun 2026awarded 10 Sept 2026
Award (standstill) to Hainenko Ltd +4 more3 awards
Framework period 2 yrsends 31 Aug 2028 · up to 31 Aug 2030 with extensions · starts 1 Sept 2026

What is being bought3 lots · detail below

Published requirement description

Glue sticks, including both YPO branded and branded to be used in an educational and office environment.

100% supplies, all delivered as stock to the YPO warehouses. The estimated value is £20m - £25m including VAT

CPV: Glues

How this framework works

From the published notice
Type
Open framework
Call-offs
call-offs are awarded directly to appointed suppliers, without further competition
Bids received
5 bids on the busiest of 3 lots · 5 suppliers appointed
Framework period
2 yrs · up to 4 yrs from 1 Sept 2026
Supplier levy on call-offs (max %)
3% of call-off value · Marketing Support - 3%
Who may buy through it
Published description of the framework

All tenderers who meet the minimum score threshold of 50% overall including Quality, Delivery and Customer Services and Social Value/Sustainability will be taken through to Price evaluation. Price evaluation will be conducted using the CIPFA % difference model. The submitted price is compared using a % price difference model and then scored against using the weighted criteria. The % price difference model allocates the lowest price submission the highest score and the highest price the lowest score. The price % difference is scored on the % difference between the lowest price and the price submitted. Where a submitted price exceeds the lowest price submission by more than 100%, this will result in the Tenderer being awarded a 0 for price. Price will be evaluated out of 100.

Lots and requirements (3)Procurement structure

3 lots · all with a published value · same conditions of participation on every lot · evaluation weights differ by lot

Every one of these 3 lots carries the same published figure, £20,000,000: it is the framework's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.

Lot #1YPO Branded Glue SticksAwardedRenewal 2 yrsSMEVCSEceiling above

The source published no individual description for this lot.

Contract period: 1 Sept 2026 – 31 Aug 2028 (2 yrs) · up to 31 Aug 2030 with extensions
Delivery: Yorkshire & HumberEligibility: SME eligibleVCSE eligible
Extensions: The Framework Agreement will cover the period from 1st September 2026 to 31st August 2028 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of June 2027 and will be dependent on satisfactory completion of all aspects of the Framework Agreement to date, the current market conditions for this category and YPO's contracting structures. The maximum Framework Agreement period will therefore be 4 years, from 1st September 2026 to 31st August 2030 (subject to an annual review, incorporating price re-establishment and KPI performance). · The Framework Agreement will cover the period from 1st September 2026 to 31st August 2028 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of June 2027 and will be dependent on satisfactory completion of all aspects of the Framework Agreement to date, the current market conditions for this category and YPO's contracting structures. The maximum Framework Agreement period will therefore be 4 years, from 1st September 2026 to 31st August 2030 (subject to an annual review, incorporating price re-establishment and KPI performance).
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    Please refer to the procurement documents

  • Technical & professional ability

    Please refer to the procurement documents

Lot #2Premium Quality Heavy Glue Sticks (Range 1)AwardedRenewal 2 yrsSMEVCSEceiling above

The source published no individual description for this lot.

Contract period: 1 Sept 2026 – 31 Aug 2028 (2 yrs) · up to 31 Aug 2030 with extensions
Delivery: Yorkshire & HumberEligibility: SME eligibleVCSE eligible
Extensions: The Framework Agreement will cover the period from 1st September 2026 to 31st August 2028 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of June 2027 and will be dependent on satisfactory completion of all aspects of the Framework Agreement to date, the current market conditions for this category and YPO's contracting structures. The maximum Framework Agreement period will therefore be 4 years, from 1st September 2026 to 31st August 2030 (subject to an annual review, incorporating price re-establishment and KPI performance). · The Framework Agreement will cover the period from 1st September 2026 to 31st August 2028 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of June 2027 and will be dependent on satisfactory completion of all aspects of the Framework Agreement to date, the current market conditions for this category and YPO's contracting structures. The maximum Framework Agreement period will therefore be 4 years, from 1st September 2026 to 31st August 2030 (subject to an annual review, incorporating price re-establishment and KPI performance).
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    Please refer to the procurement documents

  • Technical & professional ability

    Please refer to the procurement documents

Lot #3Premium Quality Glue Sticks (Range 2)AwardedRenewal 2 yrsSMEVCSEceiling above

The source published no individual description for this lot.

Contract period: 1 Sept 2026 – 31 Aug 2028 (2 yrs) · up to 31 Aug 2030 with extensions
Delivery: Yorkshire & HumberEligibility: SME eligibleVCSE eligible
Extensions: The Framework Agreement will cover the period from 1st September 2026 to 31st August 2028 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of June 2027 and will be dependent on satisfactory completion of all aspects of the Framework Agreement to date, the current market conditions for this category and YPO's contracting structures. The maximum Framework Agreement period will therefore be 4 years, from 1st September 2026 to 31st August 2030 (subject to an annual review, incorporating price re-establishment and KPI performance). · The Framework Agreement will cover the period from 1st September 2026 to 31st August 2028 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of June 2027 and will be dependent on satisfactory completion of all aspects of the Framework Agreement to date, the current market conditions for this category and YPO's contracting structures. The maximum Framework Agreement period will therefore be 4 years, from 1st September 2026 to 31st August 2030 (subject to an annual review, incorporating price re-establishment and KPI performance).
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    Please refer to the procurement documents

  • Technical & professional ability

    Please refer to the procurement documents

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored

Lots publish different evaluation splits; there is no single procedure weighting.

Conditions of participation · identical on every lot2
  • Economic & financial standing

    Please refer to the procurement documents

  • Technical & professional ability

    Please refer to the procurement documents

What this means for your bid
  • Price carries 30–45 points depending on the lot; most lots put it at 30 points.
  • “The Supply of Glue Sticks” is a framework: the contest is a place on its panel, not a single contract, and call-offs are awarded directly: getting appointed is the whole game.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Open procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Goods
Notice status
Awarded
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
https://www.ypo.co.uk/about/customers/permissible-users
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
10 Jul 2025, 14:07 BST
Last source update
30 Sept 2026, 15:40 BST
Award evaluation window
Submission end – 13 Aug 2026
Authority reference
001297
FTS notice number
2026/S 000-039385
Latest notice
Contract award notice (UK6)
Classification (CPV)
Glues
Delivery area
UKYorkshire & Humber (UKE45)
Official registry OCID
ocds-h6vhtk-055cf9 Find a Tender
Contract terms summary

Please refer to the procurement documentation

How it was run

Official notice
Run through: YPO eSourcing
Supplier login requiredElectronic submission allowedLanguage: EN
Access & registration note: Free
Appointment period ends
12 Jun 2026, 14:00 BST
Clarification deadline
29 May 2026, 14:00 BST
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Supplier levy on call-offs (max %)
call-off levy · 3% of call-off value · Marketing Support - 3%
Detailed submission instructions & authority contactsFrom official release

Timeline

10 Jul 2025 → 12 Oct 2026 · 10 dates
  1. Planning notice published
    10 Jul 2025, 14:07 BST
  2. Market engagement
    1 Aug 2025, 23:59 BST

    YPO are looking to start pre market engagement for the provision of Glue Sticks to be stocked in the YPO warehouse in Wakefield (WF2 0XE) for delivery to our customer base. All items will be stocked in YPOs warehouse and there will be no direct delivered to customer items.

    YPO intends to close the preliminary market engagement by the 01/08/2025.

    If you are interested in this opportunity, please contact us at [email protected] for us to send you a short questionnaire to complete and return to the same email address. Please note, there are 2 tabs - 1 tab with guidance notes and 1 tab with questions. Suppliers only need to complete for products they are able to supply. Also, should you have any further questions around this opportunity, please contact the above email address.

    YPO are looking for testing methods to ensure we achieve best value and quality in the market.

    How do you as manufacturer test these products to ensure consistence in high quality?

    YPO are looking to find the standard product ranges available in the market to allow us to build the product specifications for each proposed lot. Eg pack sizes /environmental claims (this may include customer feedback you have to support).

    YPO require detail of ranges that can be offered by providers for specific markets Eg Glue Sticks across YPO Branded and non-YPO Branded. (YPO require providers that can offer full ranges of product to meet the needs of the customer base from Early Years through to Secondary and higher education and non-education).

    YPO are looking for your social value / sustainability offering to support your product ranges.

    YPO reserves the right to not commit to advertising this tender if we do so wish. Should YPO wish to proceed further a formal procurement process will be followed in accordance with YPO's contract procedure rules and in line with the Procurement Act 2023 as relevant. Please note that any information is being sought without prejudice and without commitment.

  3. Tender notice published176 days ago
    29 Apr 2026, 16:04 BST
  4. Clarification questions by146 days ago
    29 May 2026, 14:00 BST
  5. Admission / appointment period ends132 days ago · period end, not a bid countdown
    12 Jun 2026, 14:00 BST
  6. Award decision expected by69 days ago
    13 Aug 2026, 23:59 BST
  7. Contract starts51 days ago
    1 Sept 2026, 00:00 BST
  8. Assessment summaries sent22 days ago
    30 Sept 2026, 00:00 BST
  9. Latest notice published22 days ago
    30 Sept 2026, 15:40 BST
  10. Standstill ends9 days ago
    12 Oct 2026, 23:59 BST

Notice history

9 events · 3 releases on Find a Tender · since 10 Jul 2025
  1. Preliminary market engagement notice published
    10 Jul 2025, 14:07 BST
    UK2
  2. Tender notice published
    29 Apr 2026, 16:04 BST
    UK4
  3. Published value published: £20,000,000
    29 Apr 2026, 16:04 BST
  4. Status changed to active
    29 Apr 2026, 16:04 BST
  5. Procurement method changed
    29 Apr 2026, 16:04 BST
  6. Deadline published: 12 Jun 2026, 14:00 BST
    29 Apr 2026, 16:04 BST
  7. Contract award notice published
    30 Sept 2026, 15:40 BST
    UK6
  8. Status changed to complete
    30 Sept 2026, 15:40 BST
  9. Contract signature expected
    30 Oct 2026, 23:59 GMT
    scheduled

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Suppliers appointed 53 awards · see the list ↓
Bids received 54 from SMEs · busiest of 3 lots
Named bidders 8published on the award notice

£20,000,000 is the framework's published maximum, restated by the publisher on 3 award rows. It is one ceiling, not 3 separate sums, and no share per lot is published; those rows read “ceiling above”.

Awarded toValueDateStatus
Lot 1 · YPO Branded Glue Sticks1 award
Hainenko LtdSME2 Nov 2026 – 1 Nov 2028 · up to 1 Nov 2030Extensions: The Framework Agreement will cover the period from 2nd November 2026 to 1st November 2028 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of August 2028 and will be dependent on satisfactory completion of all aspects of the Framework Agreement to date, the current market conditions for this category and YPO's contracting structures. The maximum Framework Agreement period will therefore be 4 years, from 2nd November 2026 to 1st November 2030 (subject to an annual review, incorporating price re-establishment and KPI performance). · Options: Any resulting Contract shall be deemed to cover any item that can be supplied by the successful Tenderer(s) over the life of the Contract within the scope of The Supply of Glue Sticksceiling above10 Sept 2026standstill to 12 Oct 2026Standstill
Lot 2 · Premium Quality Heavy Glue Sticks (Range 1)1 award
HENKEL LIMITED2 Nov 2026 – 1 Nov 2028 · up to 1 Nov 2030Extensions: The Framework Agreement will cover the period from 2nd November 2026 to 1st November 2028 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of August 2028 and will be dependent on satisfactory completion of all aspects of the Framework Agreement to date, the current market conditions for this category and YPO's contracting structures. The maximum Framework Agreement period will therefore be 4 years, from 2nd November 2026 to 1st November 2030 (subject to an annual review, incorporating price re-establishment and KPI performance). · Options: Any resulting Contract shall be deemed to cover any item that can be supplied by the successful Tenderer(s) over the life of the Contract within the scope of The Supply of Glue Sticksceiling above10 Sept 2026standstill to 12 Oct 2026Standstill
Lot 3 · Premium Quality Glue Sticks (Range 2)1 award
BIC UK Ltd, Newell Brands UK Limited, edding (UK) LtdSME2 Nov 2026 – 1 Nov 2028 · up to 1 Nov 2030Extensions: The Framework Agreement will cover the period from 2nd November 2026 to 1st November 2028 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of August 2028 and will be dependent on satisfactory completion of all aspects of the Framework Agreement to date, the current market conditions for this category and YPO's contracting structures. The maximum Framework Agreement period will therefore be 4 years, from 2nd November 2026 to 1st November 2030 (subject to an annual review, incorporating price re-establishment and KPI performance). · Options: Any resulting Contract shall be deemed to cover any item that can be supplied by the successful Tenderer(s) over the life of the Contract within the scope of The Supply of Glue Sticksceiling above10 Sept 2026standstill to 12 Oct 2026Standstill

Bid statistics published by the authority

LotBidsSMEVCSEValid bid range
1 · YPO Branded Glue Sticks4final-stage tenders40—
2 · Premium Quality Heavy Glue Sticks (Range 1)1final-stage tenders00—
3 · Premium Quality Glue Sticks (Range 2)5final-stage tenders40—

Who bid

Bidders as named on the Procurement Act 2023 award notice. “Won” means the bidder holds an award on this notice.

Contracting authority & participating public bodies

Yorkshire Purchasing Organisation

Contracting authorityPublic authority - sub-central government GB-PPON: PMRV-4748-MNJV 41 Industrial Park, Wakefield, Yorkshire & Humber, WF2 0XEContact name, email

Framework contractors & participating bidders

8 commercial parties on the notice · 5 awarded
  • BIC U.K. LIMITEDFramework contractorGB-COH: 00389090GB-PPON: PPNN-9891-WLQZ The Charter Building, Uxbridge, London, UB8 1JGContact email
  • EDDING (U.K.) LIMITEDFramework contractorGB-COH: 01249697GB-PPON: PYYT-5823-WCCM Edding House, Merlin Centre, St. Albans, East of England, AL4 0JYContact email
  • FLIPFILE LIMITEDBidder / tendererGB-COH: 02212020GB-PPON: PDNT-6913-JVVR Unit 4 Lineside Industrial Estate Arndale Road, Littlehampton, South East, BN17 7HD
  • HAINENKO LIMITEDFramework contractorGB-COH: 01096654GB-PPON: PZHW-3958-RZLQ 284 Chase Road, London, London, N14 6HFContact email
  • HENKEL LIMITEDFramework contractorGB-COH: 00215496GB-PPON: PYJM-6864-RMNP Henkel Ltd, Wood Lane End, Hemel Hempstead, East of England, HP2 4RQContact email
  • NEWELL BRANDS UK LIMITEDFramework contractorGB-COH: 00104102GB-PPON: PBGW-2894-PBHY Halifax Avenue, Lichfield, West Midlands, WS13 8SSContact email
  • TEXET SALES LIMITEDBidder / tendererGB-COH: 01656138GB-PPON: PZCW-6642-VHQD 5th Floor City Point 701 Chester Road Stretford, Manchester, North West, M32 0RW
  • TIGER STATIONERY LIMITEDBidder / tendererGB-COH: 08542970GB-PPON: PCRJ-7674-RJGD Brandon Way, West Bromwich, West Midlands, B70 8JN

Official documents & specifications (5)

Official links; attachments are not copied

Notices published for this procedure