TenderlineUK
Procurement Intelligence
Official OCDS
Find a Tender
complete
Official procurement procedure

Tender for the Design, Supply, Installation, Supervised Switch–on, Removal, Storage, Maintenance, Refurbishment and Repair of Festive Lighting

Christmas tree lights
Electrical installation work
Electrical services
+5 more
Published value
Not published
Submission deadline Not published
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: Sandwell Metropolitan Borough Council: "Tender for the Design, Supply, Installation, Supervised Switch–on, Removal, Storage, Maintenance, Refurbishment and Repair of Festive Lighting". Published status: complete. Published value: Value not published. 1 published lot. Submission deadline not published. See the official notice for participation instructions.
Contracting AuthoritySandwell Metropolitan Borough CouncilScope & CategoriesNot publishedSubmission Window
complete
No deadline published
Submission GatewayDirect notice routeLegal Basis & RegimeStandard procurementEstimated Value (exc. VAT)Not published
Bidder Intelligence · Authority Profile: Sandwell Metropolitan Borough Council
Market Analytics
View Authority Profile →
Derived from OCDS awards & bid statistics
Published history for Sandwell Metropolitan Borough Council. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Average Price Reduction
Not availableInsufficient comparable data
Requires at least 5 comparable procedures
Competition Density
6Bids / Report
8.7% of reports have one bid
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate available
Payment Terms
Check noticePublished terms
Payment obligations depend on the applicable regime and contract. Consult the official documents.
Coverage: 161 active published awards; 161 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Price reduction compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Procedure methodNot published
Procurement categoryNot published
Statuscomplete
Framework / DPSNot published
CompetitionNot published
Above thresholdNot published
Legal basisNot published
Tender period startsNot published
Clarification deadlineNot published
Electronic submissionNot published
Submission languagesNot published
Published2 Nov 2022, 13:47 GMT
Last source update2 Nov 2022, 13:47 GMT
Recurring procurementNot published
ClassificationChristmas tree lights, Electrical installation work, Electrical services, Electrical-system repair services, Exterior lights, Installation of outdoor illumination equipment, Operation of electrical installations, Outdoor switching installations
OCIDocds-h6vhtk-0348f1
What is being bought
Sandwell Metropolitan Borough Council identified a requirement to appoint a suitably qualified and experienced Contractor for the design, supply, installation, supervised switch– on, removal, storage, maintenance, refurbishment and repair of festive lighting within the Borough of Sandwell. The Contract is on a hire basis and will include for all transport and delivery, routine repairs and refurbishment during the contract term, with the cost spread equally over the 4-year period: 1 October 2022 to 30 September 2026.The Council used the In-tend e-Tendering System for this Procurement exercise.
What changed
From the official release history
  1. tender value changed
    2 Nov 2022, 13:47 GMT
  2. Status changed to complete
    2 Nov 2022, 13:47 GMT
  3. Official notice release published
    2 Nov 2022, 13:47 GMT
  4. Submission deadline changed to published date
    2 Nov 2022, 13:47 GMT
  5. Published value updated to £708,000
    21 Jun 2022, 16:38 BST
  6. Status changed to active
    21 Jun 2022, 16:38 BST
  7. Official notice release published
    21 Jun 2022, 16:38 BST
  8. Submission deadline changed to 21 Jul 2022, 15:00 BST
    21 Jun 2022, 16:38 BST
  9. Buyer information updated
    21 Jun 2022, 16:38 BST
Lots and requirements (1)
Published by the contracting authority
  • Lot 1 · #1
    Individual lot title not published
    cancelled
    Published valueNot published
    Sandwell Metropolitan Borough Council identified a requirement to appoint a suitably qualified and experienced Contractor for the design, supply, installation, supervised switch– on, removal, storage, maintenance, refurbishment and repair of festive lighting within the Borough of Sandwell. The Contract is on a hire basis and will include for all transport and delivery, routine repairs and refurbishment during the contract term, with the cost spread equally over the 4-year period: 1 October 2022 to 30 September 2026.
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
Timeline
  1. Procedure published
    2 Nov 2022, 13:47 GMT
  2. Award active
    Not published · Not published
  3. Contract active
    Signed 2 Nov 2022, 00:00 GMT · £708,000
Commercial outcome and competition
Awards
Turnock Ltd
Not published · Not published · active
Contracts
Tender for the Design Supply Installation Supervised Switch on Removal Storage Maintenance Refurbishment and Repair of Festive Lighting
£708,000 · signed 2 Nov 2022, 00:00 GMT · active
Bid statistics
bids: 2 (lot 1)
electronicBids: 2 (lot 1)
foreignBidsFromEU: 0 (lot 1)
foreignBidsFromNonEU: 0 (lot 1)
smeBids: 2 (lot 1)
Buyer and organisations in this procedure

Sandwell Metropolitan Borough Council

Contracting authority GB-FTS-1137
View buyer profile
  • Sandwell Metropolitan Borough Council
    buyer

    Sandwell Council House, Freeth Street, Oldbury, UKG37, B69 3DB
  • The Royal Courts of Justice
    reviewBody

    The Strand, London, WC2A 2LL
  • Turnock Ltd
    supplier

    0320293
    Reaymer Close, Walsall, UKG38, WS2 7QZ
Documents (0)
Official links; attachments are not copied
No data
No linked documents are published
Related procedures (0)
No data
No related procedures published